You are on page 1of 2

INS_100.

21211_SPLTray_A 9/19/13 3:42 PM Page 1

Ribbon Splice Tray Instructions

Product includes:
A. Cover
B. Tray (including splice chip)
A. C. Ribbon Holder Covers
D. Bare Ribbon Grommets

B.

D.

C.

After Splice is Complete

Mass fusion sleeve slides After loading is complete, When using unjacketed
1 2 into holder as shown. 3 4
When using oval jacketed insert rubber cover over ribbon fiber, insert provided
ribbon, lay directly into ribbon holder and jacket. grommets into the holder slots as
jacket holder. shown.

Note: Distance from jacket to splice point


should be no more then 88 mm (3 1/2 in.)
to insure jacket is secured
in holder.

Suggested lacing layouts

Ribbon fiber can be laid into After loading is complete, Same side entranc e and ex it
5 the installed grommets. 6
insert rubber cover over
holder and fiber.
Caution: Care should be taken when
placing covers over bare fiber loaded
gromets.
Ensure cover does not
pinch the fiber. P ass through
INS_100.21211_SPLTray_A 9/19/13 3:42 PM Page 2

Ribbon Splice Tray Instructions

To assist safe installations, comply with the following:


A. Use caution when installing or modifying
telecommunications circuits.
B. Never touch uninsulated wire terminals unless
the circuit has been disconnected.
C. Never install this device in a wet location.
D. Never install wiring during a lightning storm.

Rev.A 9/13 100.21211.00_A

Because we continuously improve our products, Siemon reserves the right to change specifications and availability without prior notice.

Worldwide Headquarters Regional Headquarters Regional Headquarters Regional Headquarters


North America EMEA Asia/Pacific Latin America
Watertown, CT USA Europe/Middle East/Africa Shanghai, P.R. China Bogota, Colombia
Phone (1) 860 945 4200 US Surrey, England Phone (86) 21 5385 0303 Phone (571) 657 1950
Phone (1) 888 425 6165 Phone (44 ) 0 1932 571771
© 2013 The Siemon Company

www.siemon.com

You might also like