Doc.No.

:STC-QA&QC/FRM-007
Stecon Electromechanical Contracting L.L.C
Rev :00
CLIENT
STRUCTURE RECEIPT REPORT Date: Jan 01, 2014

Page: I of 1

Area: Report No.:

Structure No.: Reference Specifification:

Reference Drawings:

Sr. No. STEELWORK INSPECTION ITEM PETROMEN CLIENT

1 Structural Steel received, verified the tags correct and there is no physical
damage on it
(Checked
see remarks if anysteel
structural damage found
surface )
coating / painting when received ( see remarks
2
if any damage found)
3 Initial bolt tightness (bolt code system)

4 Structure is plumb and level.


Primary steel work erection complete (Beams, columns, braces, brackets, bolts,
5
etc)
6 Verification of structure line and level

7 Final tightness of all kind of bolts (bolt code system)

8 Structure released for equipment / piping erection

9 Grouting of base plate conducted (if applicable)

10 Tightness of holding down bolts, after 72 hours of grout cured (if applicable)

11 Secondary steel work complete (stairs, ladders, handrail, grating, etc)

12 Rectification of any Physical damage ( Refer to Sr. No: 1 remarks ).

13 Final paint touch-up complete ( Refer to Sr. No: 2 remarks ).

Tolerances

a) Beams:-
The maximum tolerance for level and alignment is + 5 mm on any particular floor / tier of the
structure.
The maximum differential between connecting beams and adjacent beams is < 2mm.

b) Stanchions:-
The distance between the centers of adjacent stanchions at any one floor / tier level is < 5
mm.
The cumulative tolerance over 3 or more bays is as following.

Upto and including 30 m = + 5 mm

Over 30 m = + 10 mm

Remarks:-

STECON QA&QC TPI CLIENT

NAME: NAME: NAME:

DATE: DATE: DATE:


SIGNATURE: SIGNATURE: SIGNATURE: