FINAL TERM PROJECT Group 2

You are going to create a role-play about a Leader:


recently-accepted project. Imagine you are Ralph Christian Hipolito
now working as licensed engineers.
Members:
The professor should be able to see all the
functions of Management and elements in Erwin Josz T. Gopez
project management. Rolly Garcia Jr.
Your creativity is your limit. All members Arvin Kyle Mendoza
should be seen in the video and should have
enough duration of exposure. Lloyd Ian Ibis

Any problem in attendance or participation Mark Ivan Nardo


should be reported immediately to the Nathaniel John Hipolito
professor.
Nikko Ian Lozano
Non-participating members will be removed
Nikko Jan Magsilang
from the group.
Jeremy Jimenez
The length of the video should be at least 5
minutes. You may use video editing tools or Scriptwriter: Ralph Christian
stick to the recorded MS Teams meeting. Hipolito
The play may be in English or Filipino Editor: To be filled.
language.
Roles:
Upload your video in an unlisted YouTube
Client-1 (Ralph Christian M. Hipolito)
channel (minding about copyright issues)
and send the link in your respective channels Head Engineer/ Supervisor-1 (Rolly)
on or before the deadline. Planning team- 3
Jeremy- Head Planner
Arvin- Human Resources Manager
Nikko Jan- Economic Engineer

Designing-2
Lloyd- Graphic Artist

Nathaniel- CAD Expert

Production-3
Erwin- Lead Production Manager
Nikko Ian- In charge of maintenance
Mark- In Charge for checking order Supply
Script department together with
Engr.Arvin and Engr.Nikko Jan.
* Scene *
During the hard times of the
pandemic Jeremy: It’s a pleasure to
meet you sir.
MekB has finally received a
project from one of their most Rolly: Next is Engr.Llyod and
trusted clients. Engr.Nathaniel who are in
charge of the design team.
A meeting was conducted in order
to discuss on how they will Llyod: Looking forward in
proceed in making the project. working for you.
Jeremy, who is the Head engineer Rolly: And last is Engr.Erwin
scheduled the meeting with their who is in charge of the
client. Production team with Engr.Ian
and Engr.Mark
Erwin:
Scene 1:
Ralph: Looks like you have a
- Via teams –
very competent team. If that
Rolly: Hello, Good day so, Then I have nothing to
everyone. I have some good worry about. It’s a pleasure
news people. Sawakas meron na to meet all of you but
tayong new project before the unfortunately, I have business
end of the year *everyone gets to take care of and I have
excited*. I want you all to already talked with your boss
meet Mr_____. He will be our about the project. I believe
client for this project. in everyone’s capabilities,
and I hope you can deliver it
Ralph: yes yes, hello
in schedule.
everyone. *Everyone says
hello* I am _____ and I work *Leaves meeting*
for a private sector that
- Still on call –
sends payloads to the ISS.
I’ve been looking for the best Rolly: Alright everyone. This
Engring team and from what project will require us extra
I’ve heard you guys are the manpower and effort. We have a
best of the best on what you tight schedule and I know for
do. sure we can deliver.
Rolly: Trust me sir, you heard Arvin: Mukhang mapapasabak
the right thing. Let me tayo dito boss ahh.
introduce you to the team.
Nathaniel: Mukha nga. Marami
We have Engr.Jeremy as the nanamang gabing walang tulog
leader of the planning niyan.
Jeremy: anoba kayo, wag kayo we will just wait for Jeremy
mag alala. Siguradong may and his team to come up a plan
plano na si boss sa lahat. on how we can further proceed.
Rolly: shempre naman meron. Jeremy: you got it boss.
So, our main project here is
Rolly: For the leader of the
to produce the necessary parts
departments please make sure
needed in creating a structure
your team is at their best
that is strong enough to carry
performance. Provide what is
the payload into space.
necessary for the workplace.
Jeremy: Copy Boss.
Erwin: Space? That means we
Nath: Copy Boss.
are helping to create a space
shuttle? Erwin: Copy Boss.
Rolly: Only a part of it. Rolly: For all Leading
Engineers for each Section I
Nikko Ian: ohhhh, this is the
expect you to lead your team
most exciting project we have
with your outmost abilities.
ever had.
We will have a meeting after 5
Nikko Jan: OO nga, grabe just days to discuss the final plan
to imagine na isa tayo sa mga for this project. Good day
engineers na tumulong para everyone and I wish everyone
magawa yung space shuttle. Ang Goodluck.
laking honor naman yon.
Mark: Boss, ano game plan
- End of call –
naten niyan?
Each department will have solo
Rolly: Okay, let us start.
Calls.
Since this project is gonna
take a lot of effort I hope *For Planning Department*
everyone of us will give It
Jeremy: Okay guys, let’s plan
their all. Please bring out
on how we can make this
the papers I’ve given you
project finish on schedule.
earlier. This will be the flow
First, who have ideas they
chart for our project.
would like to share.
*Pakita na may hawak lahat na
Arvin: On the paper our boss
papil at binabasa*
gave us, I noticed that that
Jeremy: Mukhang need agad he is planning on adding more
naming mag start. workers to increase manpower.
I would like to take on that
Rolly: okay everyone, Make
responsibility and be he one
sure to familiarize yourself
to screen the applicants if
with the flow chart. For now
they are fit for the position.
Shempre magpapaaalam muna ako Nath: Hmmm, The designs are
kay boss. quite difficult but it’s
possible. Give me 3 days then
I can Finish each one of
Jeremy: Okay okay. Since you these.
have more experience on the
Btw, how are we doing on the
field compared to the most of
equipment we ordered? Will I
us. I’ll make sure to mention
reach on time?
it to our boss.
Lloyd: The seller said it was
already shipped 2 days ago. I
Nikko Jan: I have a question, Let’s just hope that it will
Since the project is for arrive soon.
something big should we
Nath: I hope so, We need that
consider changing on how we
in order to finish this
usually do things. Like be
project early.
more thorough in choosing and
deciding the best course of
action.
(Continue talking in
background for 20 seconds*no
audio*)
Jeremy: Yes, I think it would
be best to expand our choices.
(Change video)
(Continue talking in - For Production Department –
background for 20 seconds*no
audio*)
Erwin: Alright everyone, have
you received our memo from the
(Change video) Planning department?
-For Designing Department- Our goal is to produce our
targeted number of pieces
Llyod: Have you seen the
indicated on the plan.
Prints provided for us?
So, we all know that we need
Since the parts are already
to put on extra effort and
predesigned. what we need to
thanks to the efforts of HR
do is create a support for
headquarters we have a few
each load without much
extra hands to work with.
tension.
Engr. Nikko, what’s the news
Can you create a 3d model of
on our equipment’s? Are the in
these 2D images of the parts?
tiptop shape?
Nikko: I’ve checked all the Rolly: Good day Engineers. Now
equipment’s and machines we are all here let’s talk
needed for the project and about our final plan for the
there one machine that project. Mr.____ will join us
concerns me. One of our later.
welding machines is showing
Engr. Jeremy would you please
low Voltage output causing
enlighten us on what the
lack of fusion or incomplete
planning department plans are.
fusion. Should we just replace
It or have someone look into
it.
Jeremy: Based on the Budget
and timeframe we have. It
would be best to hire more
Erwin: We can’t handle any
workers in the Production team
handle setbacks on this
to minimize the risk of
project. I think the safest
failure. We must follow strict
way is to put it in storage at
protocol so that we can
the moment and lets just focus
provide the highest quality to
on the machines we have
our client.
working properly. How about on
your part Engr. Mark? Rolly: Send us the new flow
chart you made so that each
Mark: Everything we need has
department can master their
already been ordered. I’ve
schedules. How about on your
contacted our suppliers to
part Engr.Llyod?
deliver it double time because
we are on a tight schedule. I
Llyod: All designs for each
also ordered extra tools and
part have been converted from
protective gear.
2D to 3D by Engr. Nath. They
are all organized and will be
sent to your email later.
Erwin: Looks like everything
is in order, Thank you for you Rolly: For our production
hard work guys. team? Engr. Erwin?
Erwin: You have nothing to
worry about on my part. Every
- End Call –
machine and equipment we need
are all in good condition and
every tool and safety gear we
need are all provided to our
After 2days workers. We are just waiting
for the Go signal for us to
- Call Via teams for Leaders–
start the production of parts…
Ohhh, and I would like to
thank the planning department
for picking us the most
skilled applicants. They are
well trained and have good
morale.

Ralph: Well, Engr. Rolly You


just proved to me that I
didn’t choose the wrong team
for this project.

Rolly: Never in A million


years I’ve doubted my team
sir. I chose them because they
are the best one in their
fields. We already made
countless of projects for the
government and each and
everyone them are successful.

*tingin tingin sa papil si


rolly*
Rolly: Looks like everything
is in order. Well, Mr______
It’s a pleasure working with
you. Just seat back and let
our team handle this matter.
We will surely deliver on
time.

- End Call –