Professional Documents
Culture Documents
FM Handbook - D11 Standard Drawings
FM Handbook - D11 Standard Drawings
APPENDIX TO SECTION D
CONTENTS
P1 P2
S1 S2
CT
5
CT
P1 P2
S1 S2
2
CT
P1 P2
S1 S2
32A
E10
E30
E50
C31
C51
C11
E75
C10
C30
C50
4
E11
E31
E51
1
1 2 3 4 5 6 7 8 9 10 11 12 13
E76
E32
E12
E52
C12 C70 C32 C70 C52 C70
LINKS
N 240V A
C90
2 5 8 11 NC NC 1 3 4 6 7 9 13 14 6
STANDARD DRAWINGS
DRAWING TITLE
C BLOUNT
SCALE NOT TO SCALE DATE DRAWN JULY 2004 DATE REV DATE PLOT
206E24
FA4PH
PROJECT TITLE
STANDARD DRAWINGS
DRAWING TITLE
206E29
FA4PH
PROJECT TITLE
STANDARD DRAWINGS
DRAWING TITLE
PROJECT TITLE
STANDARD DRAWINGS
DRAWING TITLE
415v DISTRIBUTION FEEDER PILLAR
EXTERNAL ELEVATION - (TYPICAL LAYOUT)
DESIGN DRAWN CAD REF DRAWING NUMBER SHEET
Sheet 1 of 4
UWA OFM DECEMBER 2004
206E51
FA4PH
PROJECT TITLE
STANDARD DRAWINGS
DRAWING TITLE
415v DISTRIBUTION FEEDER PILLAR
EXTERNAL ELEVATION - (TYPICAL LAYOUT)
DESIGN DRAWN CAD REF DRAWING NUMBER SHEET 2 of 4
UWA OFM DECEMBER 2004
PROJECT TITLE
STANDARD DRAWINGS
DRAWING TITLE
415v DISTRIBUTION FEEDER PILLAR
EXTERNAL ELEVATION - (TYPICAL LAYOUT)
DESIGN DRAWN CAD REF DRAWING NUMBER SHEET 3 of 4
UWA OFM DECEMBER 2004
NOTES:
ALL MOUNTING AND BUSBAR HOLES TO BE DRILLED EARTH BAR 50x2.5 ELECTRO TINNED COPPER
AND BOLTS ARE TO BE PROVIDED.
1000KVA TRANSFORMER BUSBARS ELECTRO TINNED COPPER 2x50x6.3
TRAFFOLITE LABELS WHICH ARE SUPPLIED WITH PILLAR
ARE TO BE ENGRAVED AS NECESSARY WITH LETTERING 6mm HIGH.
PILLAR CONSTRUCTED FROM 3mm ALLUMINIUM SHEET - OUT DOOR USE
FIT ON EACH DOOR RED BACKGROUND WHITE LETTERS PILLARS FOR INTERNAL USE CONSTRUCTED FROM STEEL TO BE FINISHED
TRAFFOLITE LABELS DANGER 415V AS FOLLOWS: EXTERNAL FINISH GLOSS ENAMEL AS2700 COLOUR Y44 - SAND
INTERNAL FINISH GLOSS WHITE
NEUTRAL BAR 50x6.3 ELECTRO TINNED COPPER.
PROJECT TITLE
STANDARD DRAWINGS
DRAWING TITLE
415v DISTRIBUTION FEEDER PILLAR
EXTERNAL ELEVATION - (TYPICAL LAYOUT)
DESIGN DRAWN CAD REF DRAWING NUMBER SHEET 4 of 4
UWA OFM DECEMBER 2004
A
3 B
B
2
1
4
6 7
5 5 8
SECTION
EQUIPMENT LAYOUT EQUIPMENT
1 ISOLATOR - CLIPSAL PT35F
4 TERMINALS - NHP
5 SP MCB - TERSASAKI
7 RELAYS - NHP
C RELAY No's.
D CONTACTOR No's.
E
G RUN
CABINET
FABRICATE FROM 2mm FURNITURE QUALITY BRIGHT STEEL
PROJECT TITLE
STANDARD DRAWINGS
DRAWING TITLE
1
INCOMING SUPPLY
2 ISOLATOR - 45A
3
NORMALLY ENERGISED
4
5 6R
6
surge 60
2
AHU
supression FIB FIRE RELAY
7 70
24VDC - 15,23
8
10R
10 100 1
AHU
11 110
START RELAY
24VDC - 35
10A 120
12
1 2 121 40R-1
130N DDC AHU
13
131 STATUS
14
15
150 6R-1
FIRE ALARM
16
160 STATUS
17
23 10A 6R-2
230 231
1 2
24
240N
25
26
27
28
29
30
231 240N
240V
100VA
310 6A 311 312
31 24V
32
Off
AHU1
33
Auto
Man
34 35S
1 AHU
310 10R-1 361 TOL 352
35 STARTER
95 96
R
400
36
37 310
38
39 40R
AIR FLOW 1 AHU RUN
310 35S-1 400 401
40 RELAY
12, 42
41 EQUIPMENT LAYOUT
46
AIR HANDLING UNIT
47
49
48
PROJECT TITLE
49
STANDARD DRAWINGS
50
DRAWING TITLE