You are on page 1of 6

Job Code 0-7577-20

Owner’s Doc. No.

SONATRACH Contractor’s Doc.


S-3000-1242-061
HASSI R'MEL BOOSTING No.
PHASE III PROJECT Sheet 1 OF 5

SONATRACH
Activité E&P
Pôle Exploitation & Production
Division Production
Direction Régionale Hassi-R’mel

REALISATION DES INSTALLATIONS DE SEPARATION ET DE


COMPRESSION ENTREE BOOSTING PHASE III
Contract N° : E/05/SH/E-P/DP/HR/2016

FIRE AND EXPLOSION RISK ANALYSIS (FERA)


PROCEDURE

REV. DATE PAGE ISSUE PURPOSE/DESCRIPTION PREP’D CHK’D APP’D

A 17-FEB-17 All For Approval K.Ishigami H.Kito H.Kito

B 11-APR-17 All For Approval K.Ishigami H.Kito H.Kito

C 27-JUL-17 All For Approval K.Ishigami H.Kito H.Kito

0 29-SEP-17 4 For Construction K.Ishigami H.Kito H.Kito

D R A
IN
02-O
C T - 2 017
1/6
SONATRACH
HASSI R'MEL BOOSTING PHASE III PROJECT
Owner’s Doc. No.
FIRE AND EXPLOSION Contractor’s Doc. No. S-3000-1242-061
RISK ANALYSIS (FERA)
Sheet 2 OF 5
PROCEDURE

INDEX
1 SCOPE ........................................................................................................................................................... 3
2 REFERENCE DOCUMENTS ......................................................................................................................... 3
2.1 Project Documents ................................................................................................................................. 3
3 DEFINITION ................................................................................................................................................... 3
4 FIRE AND EXPLOSION RISK ANALYSIS.................................................................................................... 3
4.1 Purpose of Analysis ................................................................................................................................ 3
4.2 Scope of Analysis ................................................................................................................................... 3
4.3 Data for Analysis .................................................................................................................................... 4
5 PROCEDURE AND METHODOLOGY FOR FIRE AND EXPLOSION RISK ANALYSIS ............................ 4
5.1 Procedure and Methodology .................................................................................................................. 4
5.2 Frequency Criterion ................................................................................................................................ 5
5.3 Reports ................................................................................................................................................... 5

D R A
IN
02-O
C T - 2 017
2/6
SONATRACH
HASSI R'MEL BOOSTING PHASE III PROJECT
Owner’s Doc. No.
FIRE AND EXPLOSION Contractor’s Doc. No. S-3000-1242-061
RISK ANALYSIS (FERA)
Sheet 3 OF 5
PROCEDURE

1 SCOPE
This document covers the procedure for fire and explosion risk analysis for HASSI R’MEL BOOSTING
PHASE III PROJECT.

2 REFERENCE DOCUMENTS
2.1 Project Documents
S-3000-1242-062 FIRE AND EXPLOSION RISK ANALYSIS (FERA) REPORT

3 DEFINITION
For the purpose of this specification, the following definitions apply:
CCB Central Control Building
CONSULTANT TBA
CONTRACTOR JGC
FERA Fire and Explosion Risk Analysis
OWNER SONATRACH
PROJECT HASSI R’MEL BOOSTING PHASE III PROJECT
PFD Process Flow Diagram
P&ID Piping and Instrument Diagram
SBC Station Boosting Centre
SBN Station Boosting Nord
SBS Station Boosting Sud

4 FIRE AND EXPLOSION RISK ANALYSIS


4.1 Purpose of Analysis
FERA shall be conducted to evaluate the design of facilities installed as part of PROJECT.

4.2 Scope of Analysis


Consequence Estimation and Frequency Assessment for thermal radiation and overpressure shall be
conducted as FERA.
CCB in SBC and Operator Office in SBN and SBS shall be blast resistance design.
Security Building and Maintenance Building in SBC and Guard House in SBN, SBS and SBC shall be

D R A
IN
02-O
C T - 2 017
3/6
SONATRACH
HASSI R'MEL BOOSTING PHASE III PROJECT
Owner’s Doc. No.
FIRE AND EXPLOSION Contractor’s Doc. No. S-3000-1242-061
RISK ANALYSIS (FERA)
Sheet 4 OF 5
PROCEDURE

located outside of 1 psig overpressure not to be blast resistance design.


Therefore, Overpressure on CCB, Security Building and Maintenance Building in SBC and Operator
Shelter in SBN and SBS shall be calculated in FERA to evaluate the blast design.
Thermal radiation on CCB, Security Building and Maintenance Building in SBC and Operator Shelter
in SBN and SBS shall be calculated in FERA to evaluate the fire resistance of those buildings.
Consequence analysis and frequency analysis results are used to evaluate the design of facilities in
SBN, SBS and SBC.

4.3 Data for Analysis


The following data shall be used as input data for FERA.
1) P&ID
2) PFD
3) Plot Plan
Latest documents on 31-JUL-17 shall be used and when there are changes in those document,
impact for FERA will be evaluated.
Step-2 facilities are considered. Step-2 data is substituted by Step-1 data. It results conservatively,
because Step-1 process condition has higher pressure than Step-2.

5 PROCEDURE AND METHODOLOGY FOR FIRE AND EXPLOSION RISK ANALYSIS


5.1 Procedure and Methodology
Detailed procedure and methodology shall be proposed by CONSULTANT and agreed by OWNER
and CONTRACTOR.

FERA shall include the following analysis:


(1) Failure Case Definition and Frequency Analysis
(2) Consequence Analysis
(3) Fire and Explosion Risk Calculation

FERA shall include the following results:


(1) Thermal radiations exceedance curves for CCB, Security Building, Maintenance Building and
Guard House in SBC and Operator Office and Guard House in SBN and SBS
(2) Thermal radiation counter values or maps per leak scenario
(3) Overpressure exceedance curves for CCB, Security Building, Maintenance Building and Guard

D R A
IN
02-O
C T - 2 017
4/6
SONATRACH
HASSI R'MEL BOOSTING PHASE III PROJECT
Owner’s Doc. No.
FIRE AND EXPLOSION Contractor’s Doc. No. S-3000-1242-061
RISK ANALYSIS (FERA)
Sheet 5 OF 5
PROCEDURE

House in SBC and Operator Office and Guard House in SBN and SBS
(4) Overpressure counter values or maps per leak scenario

5.2 Frequency Criterion


-4
The cumulative frequency criterion used for this study shall be 10 a year and it is used for
overpressure and thermal radiation as per TM-HRM3-JYC/SHY-0119.

5.3 Reports
CONSULTANT shall submit the FERA report and it will be issued as S-3000-1242-062 (FIRE AND
EXPLOSION RISK ANALYSIS (FERA) REPORT).
This report shall include the following contents:
(1) Methodology of FERA
(2) Results of FERA
(3) Recommendations

D R A
IN
02-O
C T - 2 017
5/6
Hassi R'mel Boosting Phase III Project
Comment Response Sheet (CRS)
Contractor Document Number S-3000-1242-061
FIRE AND EXPLOSION RISK ANALYSIS (FERA)
Document Title
PROCEDURE
Rev. No C

Comments Confirmation / Explanation by Contractor


No

1 add: to evaluate the blast design Noted. JGC added.

D R A
N
I 02-OC 17
T - 2 0
6/6