20 March 2013
ENGR. JERSEY Y. MENDOZA
‘Manager-SM Rosales
Carmen, Rosales i
Pangasinan
Dear Engr. Mendoza:
This refers to your letter dated 8 March, 2013 as regards to your request that SM City Rosales will no
longer be required to form a Multi-Partite Monitoring Team (MMT), hence this was considered as an
application for an ECC Amendment.
We found that your letter is meritorious hence, your request is hereby granted, Likewise, you are
reminded to submit to this Office a Compliance Monitoring. Report (CMR) semi-annually. Attached
herewith is a CMR Format for your reference
You may now claim the approved ECC Amendment from this Office upon payment of processing fee in
the amount of Three Hundred Pesos (Php 300.00) and Documentary Stamp Tax equivalent to Fifteen
Pesos (Php 15.00).
For your compliance.
Very truly yours,
woe de tahon eae
Regional Director
é
tla
fern ¢ coedne
C %l ane
te iy eT su PERMALLS
@ P ie ee * aa, Ly
{ ata /
8 Maret: 2013 *
ENVIRONMENTAL MANAGEMENT BUREAU f a
REGION 4
Department of Environment and Natural Resources
DENR Bidg., Government Center £03" [[-1B/ R22 New
Sevilla, City of San Fernando, La Union gy LX
Attention Joe! G. Salvador, CESO IV
Regional Director
Dear Regional Director Salvador,
We write in relation to the formation of a Multi-Partite Monitoring Team (‘MMT’) for SM
City Rosales. To recall, we have already complied with your office's decision to impose charges
on SM City Rosales for its failure to constitute an MMT upon issuance of its Environmental
Compliance Certificate ("ECC") in 2008. We now seek your consideration in no longer forming ¢
an MMT for SM City Rosales in light of the existing circumstances described hereunder.
SM City Rosales has already finished construction by November 2008 and have
immediately commenced operations thereafter. No adverse environmental findings have ever
been found against SM City Rosales up to this date. As previously stated in our letter dated 28
December 2012, SM City Rosales has been consistently submitting its Quarterly Self-Monitoring
Reports, procured all necessary environmental permits and have complied with the conditions
provided under its ECC.
As stated under the Revised Procedural Manual for Department Administrative Order
No. 2003-30 ("DAO 2003-30"), MMTs of projects whose significant environmental impacts do
not persist after the construction phase can be terminated. Considering that SM City Rosales
has been operational for 5 years since 2008, there is no longer any reason to form the MMT at
this late stage. The monitoring of SM City Rosales’ environmental compliance is already being
done through the regular reports that it submits to your office. Consequently, even if an MMT is
formed at this time, its monitoring will be a mere superfluity as the same is adequately
addressed by the reportorial requirements presoribed under DAO 2003-30. In any case, the
formation of an MMT is not even mandatory for Non-Environmentally Critical Projects, to which
SM City Rosales squarely falls.
Pad. b- [0 6
Shopping Center MonapPSn? orp.
10/F Nal of Asia Arena Annex Bulding, Coral Way corner JW. Diokno Boulevard
all f Asia Complex, 1300 Pasay iy, Philippines
Telephone: +63 2 831 7000, +63 2.831 1000,
SM Supetmalls is a development of SM Prime Holdings, Inc 1 smsupermalls comSUPERMALLS
In view of the foregoing reasons, we respectfully request that SM City Rosales no longer be
required to form an MMT. Your office can be rest assured that SM City Rosales will continue to
religiously monitor its compliance with applicable environmental laws and regulations through
the reports regularly submitted with your office. It is our fervent hope that your office will act
favourably on our request.
Very truly yours,
SM City Rosales
‘hopping Center Management corp.
10/F Mal of Asia Arena Annex Building, coral Way comer} W.Diokno Boulevard
‘ll of Asia Complex, 1300 Pasay City, Philippines
Telephone: +63 2 831 7000, +63 2 831 1000
Teeeeoe eeeENVIRONMENTAL COMPLIANCE CERTIFICATE
(Issued under Presidential Decree 1586)
( ECC-R1-0802-016-5010 )
‘THIS 18-T0 CERTIFY THAT $M PRIME HOLDINGS INC. represented by MR. HANS
SY, is granted this Environmental Compliance Certificate (ECC) for |the Commercial
| Establishment Project \ocated at Brgy. Carmen East, Rosales, Pangasinan by the Department
jet and Natural Resources (DENR) through the Environmental Management Bureau,
Region 1
| ‘SUBJECT ONLY to the conditions and restrictions set-out in this certificate.
This certificates issued forthe Commercial Esalisment projet with the felling deta
PROJECT DESCRIPTION |
‘The proposed SM Supercenter Rosales covers a total land area of 87,586 #9. located at Brgy.
Carmen East, Rosales, Pangasinan.
The project includes / covers the construction and operation of SM Supercenter Rosales with facilites
consisting of Hypermarket, Department Store, Malls / Learable Shops, Food Court / Restaurants,
Entertainment Area, Parking Areas, Hardware Store, Sewage Treatment Plant, and other amenities /
services.
1. —_ conprrions |
|
| ENVIRONMENTAL MANAGEMENT
The proponent shall strictly implement the following mitigating, enhancement, and
rehabilitating measures:
1. Prior to project implementation, all permits and/or clearances from concerned office that
have administrative jurisdiction over the project shall secured, ie. LGU, HLURB, DAR, etc
| 2 Adequate and approprite drainage system and soil erosion control eae including
| other structural measures which will conform with natural topography shall be constructed
/ provided to avoid erosion and flooding of the adjoining properties;
3. Regular Sanitary Housekeeping practices, proper collection of solid and hazardous waste
resulting from the implementation/operation of the project shall be strictly ‘observed. The
waste management plan shall include adequate facilities for disposal of wastes which shall be
done from the start of the construction;exc -2-
4. In case of vegetation loss due to construction activities such as clearing and excavation
‘works, the project proponent shall plant appropriate tree species and/or other forms of
‘vegetation to compensate for the damaged vegetation;
5. | Cutting of trees shall be covered by a valid permit from the DENR pursuant to the
| provisions of PD 708 and PD 958;
GENERAL CONDITIONS
Further adm
trative conditions for the grant of this certificate shall be strictly complied:
6. The proponent’s operations shall conform with the provisions of RA 6969 (Toxic Substances
and Hazardous and Nuclear Waste Control Act of 1990), RA 9003 (Act Providing for an
Ecological Solid Waste Management Program), RA 9275 (Philippine Clean Water Act of
2004), and RA 8749 (Philippine Clean Air Act of 1999),
7. ‘The proponent shall make available information based on the project schedules as indicated
in the submitted Impact Assessment and Mitigation Summary / EMP for the
implementation of the project and proposed mitigating measures in the construction and
‘operational phase. An accomplishment report on the implemented mitigating measures and
the corresponding cost of such activities shall be submited to EMB Regional Office on a
(quarterly basis for monitoring; |
8. ‘The proponent shall undertake an effective and sustained Information, Education and
‘Communication (IEC) Campaign to explain publicly its mitigative measures as well as the
conditions of this ECC. It shall open opportunities to educate the public especially the
affected community, interested academic institutions and other parties of the environment
and human health safety features of the project;
‘Team (MMT), and establishment of an Environmental Monitoring Fund (EMF) and an
Environmental Guarantee Fund (EGF) shall be initiated by the Proponent in coordination
with the concerned EMB Office and shall be submitted to the EMB for approval within sixty
(60) days from receipt of this ECC;
=
lot De Memorandum of Agreement (MOA) on the formation of a Multi-Partite Monitoring
10, The proponent shall set-up an Environmental Unit who shall handle the environmental
aspects of the project, which shall have the following responsibilities:
2 Monitoring of mitigating and enhancement measures as cited in the EIS / IEE Report /
Checklist / EPRMP, as appropriate;
Monitor actual projec impact vis-A-vis predicted impacts and manageent measures;
Ensure that post-assessment permits are in place;
Ensure that monitoring and reporting are undertaken;
Ensure compliance to all the conditions and restrictions of the approved ECC.
oaee
11, That the proponent shall implement safety Standard Operating Procedures within the
project area pursuant to the existing regulation of concerned National Government
‘Agencies and Local Government Units,
a
hate oon al poe te
Meo
ae15, The proponent shall provide Nursing Station for children / babies;
14, In case of abandonment, the proponent shall notify the EMB Regional Office within three
(8) months prior to the abandonment and shall submit its abandonment mitigating plan for
approvals,
I RESTRICTIONS
‘The proponent is strictly subject to the following restrictions:
15, No other activities shall be undertaken other than what was stipulated in the EIA document.
Should there be an expansion of the project beyond the project description, construction of
other structures beyond those stated in the ELA document, or any change in the activity,
same shall be made subject to a new Environmental Impact Assessment;
16, Land clearing shall be limited to the project description; and
17. In ease of transfer of ownership of this project, the same conditions and restriction shall
apply and the transferee shall be required to notify the EMB Regional Office of such transfer
within fifteen (15) days.
‘This certification is issued in compliance with the requirements of Presidential Decree No.
1586 and Department Administrative Order No, 2003-30. The Bureau, however, is not precluded
from reevaluating, adding, removing and correcting any deficiencies or errors that may be found in
this Certificate after issuance.
Issued at Sen Fernando Cty La Urine this 22922) DAVE
Recommending Approval:
‘NICANOR C. ESTEBAN
OIC, EIAM Division
Approved by:
JOEL G. SALVADOR, CESO 77
Regional Director
Non-compliance with ay ofthe provisions of Ui cerifcate ral bea suficient cause for the cancellation or
suspension ofthis certificate and/or inpesiion ofa fine i on amount nat to exceed Fy Thousand Pesos
(50,000.00) for every violation thereat
ORNo + —sszt071 Date on
008 Procesing Foe 1,000.00
ORNo, + Date: Penalty Fee + 15,0000
‘VALID ONLY IF MARKED WITH DRY SEAL