Project Job Ref.

TOWN HOUSE, BUKIT SEPUTEH seputeh


Section Sheet no./rev.
RC Pad Footing 1
Calc. by Date Chk'd by Date App'd by Date
NSG 9/5/2022 IR. VEERA IR. VEERA

PILE CAP ANALYSIS


In accordance with EN1997-1-1:2004 incorporating Corrigenda February 2009 and the Malaysian National Annex
Tedds calculation version 2.0.10

Design summary - PASS (0.461)


Pile analysis summary
Unit Applied Allowable Utilisation Result
Pile axial compression, pile 4 kN 37 80 0.461 PASS

3 4
2700 mm

y 1 2

2700 mm

;
Project Job Ref.
TOWN HOUSE, BUKIT SEPUTEH seputeh
Section Sheet no./rev.
RC Pad Footing 2
Calc. by Date Chk'd by Date App'd by Date
NSG 9/5/2022 IR. VEERA IR. VEERA

75 mm
z
600 mm

Pile cap details


Pile cap width, along x axis; Lx = 2700 mm
Pile cap width, along y axis; Ly = 2700 mm
Total cap depth; Dcap = 600 mm
Density of concrete; conc = 25 kN/m3
Height of soil above pile cap; hsoil = 0 mm
Density of soil above pile cap; soil = 12 kN/m3
Pile cap area; Acap = Lx  Ly = 72900.0 cm2

Column details
Column width, along x axis; lx,col = 450 mm
Column width, along y axis; ly,col = 450 mm
Column location, x axis; xc = 1350 mm
Column location, y axis; yc = 1350 mm
Pile details
Pile material; Concrete
Concrete pile section; Square
Pile depth; hpile = 600 mm
Combination C1 (A1 + M1 +R1)
Allowable axial compression load; PpC,allow1 = 80 kN
Allowable axial tension load; PpT,allow1 = 5 kN
Allowable lateral load; Vp,allow1 = 1 kN
Combination C2 (A2 + M1 +R4)
Allowable axial compression load; PpC,allow2 = 80 kN
Allowable axial tension load; PpT,allow2 = 5 kN
Allowable lateral load; Vp,allow2 = 1 kN
Project Job Ref.
TOWN HOUSE, BUKIT SEPUTEH seputeh
Section Sheet no./rev.
RC Pad Footing 3
Calc. by Date Chk'd by Date App'd by Date
NSG 9/5/2022 IR. VEERA IR. VEERA

Number of piles; Np = 4.000


Pile embedment; dembed = 75 mm
Pile spacing; sp = 1800 mm
Edge distance; e = 150 mm
Edge distance from pile centre; E = 450 mm
Total area axial permanent load; PG,area = conc  Acap  Dcap = 109.4 kN

Pile group centroid


Centroid location, x direction; xpg,c = (xp1 + xp2 + xp3 + xp4) / Np = 1350 mm
Centroid location, y direction; ypg,c = (yp1 + yp2 + yp3 + yp4) / Np = 1350 mm
Pile distance from centroid
Pile 1 centroid distance, x direction; xp1,c = xp1 - xpg,c = -900 mm
Pile 1 centroid distance, y direction; yp1,c = yp1 - ypg,c = -900 mm
Pile 2 centroid distance, x direction; xp2,c = xp2 - xpg,c = 900 mm
Pile 2 centroid distance, y direction; yp2,c = yp2 - ypg,c = -900 mm
Pile 3 centroid distance, x direction; xp3,c = xp3 - xpg,c = -900 mm
Pile 3 centroid distance, y direction; yp3,c = yp3 - ypg,c = 900 mm
Pile 4 centroid distance, x direction; xp4,c = xp4 - xpg,c = 900 mm
Pile 4 centroid distance, y direction; yp4,c = yp4 - ypg,c = 900 mm
Moment of inertia of pile group
Moment of inertia about x-x axis; Ixx = yp1,c2 + yp2,c2 + yp3,c2 + yp4,c2 = 3240000 mm2
Moment of inertia about y-y axis; Iyy = xp1,c2 + xp2,c2 + xp3,c2 + xp4,c2 = 3240000 mm2
Loading eccentricity
Eccentricity of column load, x direction; ex,c = xc - xpg,c = 0 mm
Eccentricity of column load, y direction; ey,c = yc - ypg,c = 0 mm
Permanent load pile forces
Permanent axial load on pile 1; Pp1,G = (PG + PG,area) / Np = 27 kN
Permanent axial load on pile 2; Pp2,G = (PG + PG,area) / Np = 27 kN
Permanent axial load on pile 3; Pp3,G = (PG + PG,area) / Np = 27 kN
Permanent axial load on pile 4; Pp4,G = (PG + PG,area) / Np = 27 kN
Combination details
Imposed combination factor; 0 = 0.70
Wind combination factor; W = 0.50
Snow combination factor; S = 0.50

DA1 6.10 load combinations (ULS)


1.35G + 1.5Q (0.461)
1.35G + 1.5Q + S1.5S + W 1.5W (0.461)
1.00G (0.342)
1.00G + 1.3Q + S1.3S + W 1.3W (0.342)

Combination 10 results: 1.35G + 1.5Q +  S1.5S +  W1.5W


Pile 4 axial load; Pp4 = 1.35  Pp4,G + 1.5  Pp4,Q + 0.75  Pp4,S + 0.75  Pp4,W = 36.9 kN
max(Pp4 / PpC,allow1,0) = 0.461
PASS - Pile allowable compression load exceeds axial force