Owner INDIAN OIL CORPORATION LIMITED
Consultant PROJECTS & DEVELOPMENT INDIA LTD
Document TECHNICAL SPECIFICATION FOR CS
Name FLANGES
Doc. No. VTV-3281-LIT-9511-PP-DOC-025
VTV Job No.: 3281
Date 01-07-2021 Rev. 3
1.0 INTRODUCTION
IOCL Kandla, LPG import facility which is stored imported pure propane & butane in
refrigerated condition in two above ground Tanks of approx. 15,000 MT capacities each.
Presently the plant is operating at through put capacity about 1 MMTPA. Work site is located
at LPG import plant, Kandla near Kandla Port (KPT) and around 8 km from nearest city
Gandhidham
IOCL intends to augment the capacity of LPG import plant, Kandla from present capacity of
about 1 MMTPA to 2.5 MMPTA
3
Owner INDIAN OIL CORPORATION LIMITED
Consultant PROJECTS & DEVELOPMENT INDIA LTD
Document TECHNICAL SPECIFICATION FOR CS
Name FLANGES
Doc. No. VTV-3281-LIT-9511-PP-DOC-025
VTV Job No.: 3281
Date 01-07-2021 Rev. 3
BW end shall be in accordance with ASME B16.25, the weld contour off Bevel shall be as
follows:
Material Wall Thickness Weld contour
Carbon Steel (Except Low Up to 22 mm Figure 2 type A
Temp carbon steel
> 22 mm Figure 3 Type A
Alloy steel, Stainless steel & Up to 10 mm Figure 4
Low Temp carbon steel
>10mm & up to 25 mm Figure 5 Type A
> 25 mm Figure 6 Type A
3.12 No copper or copper alloys shall be used in any part that comes into contact with process
fluid.
3.13 Nominal sizes of piping components shall be shown by INCH system whose abbreviation
is (NPS).
3.14 For RTJ flanges, blinds & spacers, the hardness of the groove shall be specified on the
test report.
4.0 TERMINOLOGY
IOCL INDIAN OIL CORPORATION LIMITED
LPG LIQUEFIED PETROLEUM GAS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASTM AMERICAN SOCIETY OF TESTING AND MATERIALS
FW FIRE WATER SERVICE
IA INSTRUMENT AIR
PA PLANT AIR
SW SERVICE WATER
CW COOLING WATER
5
Owner INDIAN OIL CORPORATION LIMITED
Consultant PROJECTS & DEVELOPMENT INDIA LTD
Document TECHNICAL SPECIFICATION FOR CS
Name FLANGES
Doc. No. VTV-3281-LIT-9511-PP-DOC-025
VTV Job No.: 3281
Date 01-07-2021 Rev. 3
8.1 The manufacture shall furnish the material test certificate and chemical analysis report
giving the heat analysis of each heat of steel. This report shall also list the flange
numbers of those made from the heat of steel, for final certification and shipment.
8.3 The product carbon equivalent (CE) for all grades shall be as per material
Specification.
8.4 HOT DIP GALVANISING (as applicable) - Piping Components shall be coated with Zinc by
Hot Dip Process conforming to IS-2629. Min coating shall be 610 GSM up to 5 mm and above
5 mm HDG will be 910 GSM. For site fabricated items, Hot Dip Galvanising shall be carried
out in accordance with ISO 1461 Standard.
6
Owner INDIAN OIL CORPORATION LIMITED
Consultant PROJECTS & DEVELOPMENT INDIA LTD
Document TECHNICAL SPECIFICATION FOR CS
Name FLANGES
Doc. No. VTV-3281-LIT-9511-PP-DOC-025
VTV Job No.: 3281
Date 01-07-2021 Rev. 3
11.0 INSPECTION:
11.1 Manufacturer shall furnish all applicable test certificate as per latest edition of ASTM
A105, ASME B16.5, and ASME 16.47 and in relation to manufacturing procedure.
11.2 Following will be the scope of third party / purchaser inspection, but not necessary
limited to:
Verify sampling of test specimens.
Witness mechanical tests.
Visual and dimensional checks of finished fittings.
Check final markings as per latest standards.
Witness fitment of end caps on face flange by the manufacturer.
Sign and stamp all reports.
Fittings shall be certificate IIIC and duly signed by IBR authority or its approved
representative.
For items under IBR, composition restrictions, test reports, painting, etc. shall be as
per IBR’s stipulations.
All item under the purview of `IBR’ (Indian Boiler Regulation) shall be accompanied
with IBR certificate original in From IIIA for pipes duly approved by IBR
Authority/Local Authority empowered by Central Board of India.
7
Owner INDIAN OIL CORPORATION LIMITED
Consultant PROJECTS & DEVELOPMENT INDIA LTD
Document TECHNICAL SPECIFICATION FOR CS
Name FLANGES
Doc. No. VTV-3281-LIT-9511-PP-DOC-025
VTV Job No.: 3281
Date 01-07-2021 Rev. 3
11.3 Non-destructive inspection of flange shall be carried out as per latest edition.
11.4 Piping components shall be BS EN 10204 3.2 certification.
11.5 All items and their parts shall be subjected to all mandatory as well as supplementary
(wherever specified) tests and checks called for in the respective codes/standards/data
sheets.
11.6 The examining personnel shall have the requisite qualification and experience. Client
and its authorized representative reserve the right to vet and suggest changes in vendor’s
procedures.
11.7 Vendor’s works and facilities shall be accessible to the Client/Representative at all
reasonable times. Test reports for all mandatory as well as supplementary tests wherever
specified shall be furnished.
11.8 Purchaser / client have authority to ask additional testing in case of any non-
conformity/Serious observations / deviations noticed at any stage with respect to
performance delivery. All expenses shall be borne by vendor.
11.9 Client / PMC approved detailed RT procedure shall be followed for repair joints during
Radiography testing.
11.10 Client approved QAP/ ITP/ MQP, procedures / relevant standards and codes shall be
referred and implemented.
11.11 Purchaser has right to put the technical requirement in QAP/ MQP for relevant item
which will be applicable as per international industrial leading practices to get best quality
product.
11.12 UT on flanges shall be performed as per SA388.
11.13 Creep Test shall be performed for Moderate temperature (> Amb.) and higher
Temperature service piping flanges, if applicable. This is not applicable for Process (LTCS)
flanges.
13.0 DOCUMENTATION:
13.1 The manufacturer shall submit with their quotation a procedure, which shall include:
Heat treatments details on finished flange.
8
Owner INDIAN OIL CORPORATION LIMITED
Consultant PROJECTS & DEVELOPMENT INDIA LTD
Document TECHNICAL SPECIFICATION FOR CS
Name FLANGES
Doc. No. VTV-3281-LIT-9511-PP-DOC-025
VTV Job No.: 3281
Date 01-07-2021 Rev. 3
14.0 DELETED:
15.0 MARKING:
In additional to the marking specified in the standards and Marking shall be by paint
stencilled only. Manufacturer shall ensure marking of flange for traceability with the reports
and their requirements of standards.
15.1 All items shall be marked (stamped/etched) in accordance with the applicable
code/standard/specification. In addition, the item code, if available, shall also be marked.
15.2 For ease of identification, the colour of painted strip (wherever required) shall be as per
the applicable standard.
15.3 Low Stress Punch shall be used wherever applicable.
15.4 Paint or ink for marking shall not contain any harmful metal or metal salts, which can
cause corrosive attack either ordinarily or in service.
15.5 Special items/smaller items shall have attached corrosion resistant tag providing salient
features
9
Owner INDIAN OIL CORPORATION LIMITED
Consultant PROJECTS & DEVELOPMENT INDIA LTD
Document TECHNICAL SPECIFICATION FOR CS
Name FLANGES
Doc. No. VTV-3281-LIT-9511-PP-DOC-025
VTV Job No.: 3281
Date 01-07-2021 Rev. 3
16.2 All items shall be protected from rust, corrosion, and mechanical damage during
transportation, shipment and storage. Surfaces shall be clean and dry before applying rust
preventive. Aliphatic petroleum naphtha, pure gum turpentine substitute (White spirit) shall
be used for this purpose. Paraffin (kerosene) shall not be used.
16.3 Rust preventive on machined surfaces to be welded shall not be harmful to welding and
shall be easily removable with a petroleum solvent.
16.4 Ends shall be suitably protected, and the protectors shall be securely and tightly
attached. Each variety and size of item shall be supplied in separate packaging marked with
the purchase order no., item code (if available), and the salient specification.
16.5 All externally threaded items shall be fitted with plastic thread protectors.
16.6 Piping components with bevelled ends shall be palletized and shrink wrapped or
banded with steel or plastic strapping.
16.7 The inspected items shall be stacked in appropriate method to avoid any material
damage.
10