Professional Documents
Culture Documents
PE4063 Chapter 9
PE4063 Chapter 9
Sand Production PE
1
Sand Cementation PE
Sand Production PE
2
Is Sand Control Be a
Problem ? PE
Sand Production PE
3
Sand Production PE
Problems Associated
with Sand Production PE
4
Sand Production PE
Sand Production PE
5
Sand Production PE
Triggering Factors on
Sand Production PE
6
Triggering Factors on
Sand Production PE
Predicting Sand
Production PE
7
Predicting Sand
Production PE
Predicting Sand
Production PE
8
Predicting Sand
Production PE
Rock Strength
Estimation PE
9
Terminal Velocity of
Sand Particles PE
Allowable Sand
Production Levels PE
10
Monitoring of Sand
Production PE
Sand Control
Techniques PE
11
Sand Control Variations
(Cased Holes) PE
Sand Control
Techniques PE
12
Sand Control
Techniques PE
Sand Control
Techniques PE
13
Sand Control
Techniques PE
Gravel Packing
Wire-Wrapped Screen PE
14
Pre-Packed Screen PE
Horizontal Well
Completion PE
15
Gravel Packing PE
Gravel Packing PE
• Sand Selection
16
Gravel Packing PE
Gravel Packing PE
17
Gravel Packing PE
Gravel Packing PE
18
Internal Gravel
Packing PE
External Gravel
Packing PE
19
Gravel Packing PE
Gravel Packing
Placement PE
20
Screen Selection PE
Screen Selection PE
21
Liner and Screen
Comparison PE
Gravel-Pack Job
Calculations PE
Wst Vst
22
Carrier-Fluid Volume PE
Sand Control
Performances PE
23
Effect of Gravel Packs PE
k
h Lp
k
sG 96 G 2
dp n
k is the pay zone permeability (md), kG is the gravel
permeability (md), h is the pay thickness (ft), n is the
number of perforations, and Lp is the depth of
perforations (in)
PE4063/6463, Well Completion – Dr. Evren OZBAYOGLU Chapter 9
Example PE
24