Professional Documents
Culture Documents
PE4063 Chapter 2
PE4063 Chapter 2
PE
1
PE
Types of Completions PE
2
Completion Types PE
Completion Types PE
3
Completion
Classification PE
4
Open-hole Completions PE
5
Open Hole Completions
Disadvantages PE
6
Cased Hole Completions PE
7
Cased Hole Completions
Disadvantages PE
Stimulation techniques
• Matrix acidizing
• Fracturing
8
Completion PE
Deeper wells ??
• Well servicing
• Re-entry
• Workover
Completion with
Packers PE
9
Completion with
Packers PE
Mechanical Packer PE
10
Stacked Selective
Completion PE
Gravel Packing -
Screen PE
11
Artificial Lift PE
Artificial Lift PE
12
Artificial Lift PE
Artificial Lift PE
13
Artificial Lift PE
Artificial Lift PE
14
Artificial Lift PE
Artificial Lift PE
15
Dual Completions PE
Well Completion PE
• Casing protection
• Tubing removal
• Production control
• Safety
Safety valves
Circulation
PE4063/6463, Well Completion – Dr. Evren OZBAYOGLU Chapter 2
16
Selection of a
Completion Method PE
Selection of a
Completion Method PE
17
Selection of a
Completion Method PE
Selection of a
Completion Method PE
18
Conduit Selection
Reservoir to Sufrace (Single Formation) PE
Wellhead PE
19
Wellhead PE
Wellhead PE
20
Wellhead PE
Wellhead PE
21
Wellhead Example PE
Wellhead Example PE
22
Wellhead Example PE
Wellhead Example PE
23
Wellhead - Offshore PE
Wellhead - Offshore PE
24
Wellhead - Offshore PE
Surface Facilities PE
25
Flash Process PE
Design PE
26
Sizing Constraints PE
Chokes
Functions PE
27
Adjustable Choke PE
Adjustable Choke PE
28
Adjustable Choke PE
29
Adjustable Choke PE
Adjustable Choke PE
30
Choke Sizing PE
Erosion Example PE
31
Critical Erosion
Velocity PE
Completion Schemes
Single Zone Completion with no Provision forTubing Movement PE
32
Completion Schemes
Single Zone Completion Utilizing a Locator Seal Assembly PE
Completion Schemes
Single High Flowrate Zone Completion Utilizing an Extra Long
Tubing Seal Receptacle for Tubing Movement PE
33
Completion Schemes
Single Zone High Flowrate Injection/Production Completion
Utilizing a Polished Bore Receptacle PE
Completion Schemes
Single Zone Completion Utilizing a Gas Lift Facility PE
34
Completion Schemes
Single Zone Completion Utilizing an Electrically Powered
Submersible Pump PE
Completion Schemes
Dual Completion Allowing Segregated Production PE
35
Completion Schemes
Selective Dual Zone Producer with optional Gas Lift Facility PE
Completion Schemes
"Tubingless" Dual Completion PE
36
Completion Schemes
Subsea Completion Serviced by Through Flowline Techniques
(TFL) PE
Completion Schemes
Subsea Completion Serviced by Conventional Wireline
Techniques from a Workboat or Mobile Drilling Rig PE
37
Advanced Systems PE
• Multilaterals
• Intelligent wells
Multilateral Wells PE
38
Multilateral Wells
PE
Multilateral Wells PE
Well
Trunk
Radial
Junction
Lateral
Spray
Branch
39
Types of Multilateral
Well PE
40
Multilateral Well
Completions PE
• Reservoir structure
If the reservoir formation is competent and if zonal control is
not critical, then a lower completion is recommended because of
economic concerns
In case zonal control is an important issue, an openhole
completion may not satisfy the production requirement, and a
higher level of junction completion may be needed for lateral
isolation.
• Junction formation characteristics
In general, the junction kickoff point should be designed in a
strong and consolidated section of the formation. If this is not
possible, a higher level of junction completion rather than open
hole is required to ensure junction stability
41
Multilateral Well Design
PE
42
Junction Classification
PE
Junction Classification
PE
43
Junction Classification
PE
Junction Classification
PE
44
TAML Complexity vs
Flexibility PE
Intelligent Wells PE
45
Smart Well Technology
Process PE
Advantages PE
46
Major Components of an
Intelligent Well PE
• Downhole Monitoring
• ICV
• Isolation Devices
Example
PE
47
Downhole Monitoring PE
Data Management
Process PE
48
Intelligent Well
Applications PE
• Commingled Production
• Multi Zone Horizontal
Wells
• Multi-Lateral Wells
• ‘Natural’ or Auto Gas Lift
• Injection Wells
Example PE
49