You are on page 1of 10

Sheet1

S.No. Date
1 04-05-2020
2 05-05-2020
3 06-05-2020
4 07-05-2020
5 08-05-2020
6 11-05-2020
7 12-05-2020
8 13-05-2020

Page 1
Sheet1

Learnings May 2020 Hours Spent


Unix Shell Scripting 5
Device Management 5
LWM2M Protocol 5
Device Management Using LWM2M Protocol 5
Toyota Connected car 5
Azure IoT – MQTT 5
Azure IoT – MQTT 5
Device Management Using LWM2M Protocol & Microsoft Azure IoT – 5

Page 2
Sheet2

Sachin Joshi
Hiteshkumar Mehta
vikas
Amit Kore
Atanu Sarkar
Jayant Ingale
Shirish Nalavade
Dhananjay Kumar
Saurabh Tyagi
Shailesh
Amit Kumar
Bharat Punia
Mangesh Patil,

Page 3
Sheet2

ups rpan rfp; sharec queries, team will review, atanu is also involved, rahul's team- api integraion, response
technical traingings, my learnings
azue costs
suntbot threads, cyber ark
ups, atos expert application, load testing with out load runner;perfornace testing
component diagram atom portal
under stand problem stement ups
commerce bank, 5 acages are restructured, hitendra, submisiion tomoorw
documentation of od,experert comm
Experian : final draft, waiting for internal review

security working

Page 4
Sheet2

21st may

checking consumaption of resource ocr poc amex atom poc digitadhanjay will check for services in blockchain
rpa kt planned report installation of syntbots
vikas will share azure subscription
cost ana cosmos db
northern trust call hackton call airbus rfp – 27experien
psa voting app

hackton upcoming mangesg, shirsh

Page 5
Sheet2

s in blockchain

tracers atom tracers update rfp tracers


syntel- atos gpu rpu based integration bmk entity
rpu to gbu baswe will have 6 verticals
spring initiative – rationalize things – policies, artifacts will be restructured- crea
verticalization effective date- second qtr of ths yr; impact on asg- region which

Page 6
Sheet2

, artifacts will be restructured- create uniform process- imp[act is outsode india; roles new link ac cto
hs yr; impact on asg- region which it belongs;

Page 7
14052020
S.NO. ASG Member Name
1 Sachin Joshi
2 Hiteshkumar Mehta
3 Rakesh C
4 Amit Kore
5 Atanu Sarkar
6 Jayant Ingale
7 Shirish Nalavade
8 Dhananjay Kumar
9 Saurabh Tyagi
10 Shailesh.K
11 Vikas
12 Bharat Punia
13 Mangesh Patil,
14 Amit K

Page 8
14052020
Updates
Working on UPS RFP, Shared queries on documents provided, Atanu Sarkar was also involved from ASG;
Technical traingings & learnings
Technical traingings & learnings
Involved in multiple SyntBots threads like Cyber Ark, Reports installation on Syntbots
Involved in UPS RFP ; Performance testing & load testing of Voting App without load runner; Looking for Azure Subscri
Worked on Component Diagram of Atom Portal, Working on Cost Analysis of Azure Cosmos DB;
Connected With Sachin to Understand Probelm statement of UPS;Northern Trust Calls; AirBus RFP updates- submissio
Working on Commerce Bank; Blockchain Voting App, PSA RFP
Going through Documentation on Fedex O-Day
Experian SA, Final Draft needs to be reveiwed by ASG Team; Ready for Submission.
Performing the Cost Analysis of various componenets deployed on Cloud; Amex OCR POC; Usage of Atom for one of
Working on a Seurity thread for one the RFP & Majorly involved on Atos Hackathon 2020
Townhall to be held Today, Working on spring initiative- Rationalization of Organizational level policies; Updates vertic
NA

Page 9
14052020
Imp Dates
21st May Submission Date

th Bharat & Mangesh on Atos Hackathon 2020


15th
May Submission Date

15th
May Submission Date

om 2nd Qtr maybe pushed due of COVID;

Page 10

You might also like