SECTION 301.
INTRODUCTION

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Building Permits
APPLICATION FOR
PERMIT 1. No person, firm or corporation,
including any agency or instrumentality of
VALIDITY OF BUILDING
PERMIT
the government shall construct, alter, repair,
NBCP convert, use, occupy, move, demolish and
add any building/structure or any
SECTION 301- 309 OCCUPANCY PERMIT
portion thereof or cause the same to be
done, without first obtaining a building
permit therefor from the Building Official

CEBDLG20
ENGR. DEBBIE LYN S. CABACUNGAN, MsCM
Instructor https://encrypted-tbn0.gstatic.com/i
assigned in the place where the subject
CIVIL ENGINEERING DEPARTMENT
building/structure is located or to be
No part of this material may be reproduced, distributed, or transmitted in any form or by means, including photocopying, recording, or other electronic or
mechanical methods, without the prior permission of the owner, except for personal academic use and certain other noncommercial uses permitted by copyright
law. WEEK. 2 done.

INTENDED LEARNING SECTION 301.


INTRODUCTION INTRODUCTION
MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS
OUTCOMES BUILDING PERMITS Building Permits
APPLICATION FOR APPLICATION FOR
PERMIT At the end of the session, the students are PERMIT
The prescribed application for building
expected to: permit form (NBC Form B-01) shall be used
VALIDITY OF BUILDING VALIDITY OF BUILDING by all applicants.
PERMIT PERMIT
(1) Identify the requirements for Building
OCCUPANCY PERMIT Permit application. OCCUPANCY PERMIT
CEBDLG20

CEBDLG20
WEEK. 2 WEEK. 2

1
9/6/2022

SECTION 301. SECTION 301.


INTRODUCTION INTRODUCTION

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN
BUILDING PERMITS Building Permits BUILDING PERMITS Building Permits
APPLICATION FOR APPLICATION FOR
PERMIT PERMIT  The Ancillary Permits:
VALIDITY OF BUILDING VALIDITY OF BUILDING
PERMIT PERMIT i. Architectural Permit
ii. Civil/Structural Permit
OCCUPANCY PERMIT OCCUPANCY PERMIT iii. Electrical Permit
iv. Mechanical Permit
v. Sanitary Permit
vi. Plumbing Permit

CEBDLG20
Image source:
https://kaothu.com/ vii. Electronics Permit

WEEK. 2

SECTION 301. SECTION 301.


INTRODUCTION INTRODUCTION
MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Building Permits BUILDING PERMITS Building Permits
APPLICATION FOR APPLICATION FOR
PERMIT
2. Permits supplementary to a Building Permit PERMIT
shall be applied for and issued by the
VALIDITY OF BUILDING Building Official. VALIDITY OF BUILDING
PERMIT PERMIT
Types:
OCCUPANCY PERMIT OCCUPANCY PERMIT
A. The Ancillary Permits
- duly signed and sealed by the
corresponding professionals and the plans
CEBDLG20

CEBDLG20
Image source:
and specifications shall be submitted https://www.ragaycamsur.gov.ph/

2 2
together with the duly notarized application
WEEK. for Building Permit. WEEK.

2
9/6/2022

SECTION 301. SECTION 301.


INTRODUCTION INTRODUCTION

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Building Permits BUILDING PERMITS Building Permits
APPLICATION FOR APPLICATION FOR
PERMIT PERMIT

VALIDITY OF BUILDING VALIDITY OF BUILDING


PERMIT PERMIT

OCCUPANCY PERMIT OCCUPANCY PERMIT

CEBDLG20

CEBDLG20
Image source: Image source:
https://bacoor.gov.ph/ https://www.ragaycamsur.gov.ph/

WEEK. 2 WEEK. 2

SECTION 301. SECTION 301.


INTRODUCTION INTRODUCTION
MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Building Permits BUILDING PERMITS Building Permits
APPLICATION FOR APPLICATION FOR
PERMIT PERMIT Types:
B. The Accessory Permits
VALIDITY OF BUILDING VALIDITY OF BUILDING
PERMIT PERMIT
1. Accessory Permits are issued by the
OCCUPANCY PERMIT OCCUPANCY PERMIT Building Official for accessory parts of the
project with very special functions or use
which are indicated in the plans and
specifications that accompany the building
CEBDLG20

CEBDLG20
Image source:
https://www.ragaycamsur.gov.ph/ permit application.

WEEK. 2 WEEK. 2

3
9/6/2022

SECTION 301. SECTION 301.


INTRODUCTION INTRODUCTION

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Building Permits BUILDING PERMITS Building Permits
Types:
APPLICATION FOR APPLICATION FOR
PERMIT B. The Accessory Permits PERMIT
Types:
 bank and records vaults; B. The Accessory Permits
 swimming pools;
VALIDITY OF BUILDING VALIDITY OF BUILDING
 firewalls separate from the building/structure;  ground preparation and excavation,
PERMIT PERMIT
 towers;  encroachment of foundation to public area,
 silos;  fencing, for fence not exceeding 1.80 meters high,
OCCUPANCY PERMIT  smokestacks; OCCUPANCY PERMIT
 sidewalk construction,
 chimneys;
 commercial/industrial fixed ovens;
 temporary sidewalk enclosure and occupancy,
 industrial kilns/furnaces;  erection of scaffolding,
 erecting,

CEBDLG20

CEBDLG20
 water/waste treatment tanks,
 septic vaults;  repair,
 concrete and steel tanks;  removal of sign;

2 2
 booths, kiosks and stages;  and demolition.
WEEK.  tombs, mausoleums and niches.
WEEK.

SECTION 301. SECTION 301.


INTRODUCTION INTRODUCTION
MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Building Permits BUILDING PERMITS Building Permits
APPLICATION FOR APPLICATION FOR
3. Exemption From Building Permits
PERMIT Types: PERMIT

B. The Accessory Permits a. Minor Constructions


VALIDITY OF BUILDING VALIDITY OF BUILDING
PERMIT PERMIT
2. Accessory Permits are issued by the i. Sheds, outhouses, greenhouses, children’s
OCCUPANCY PERMIT Building Official for activities being OCCUPANCY PERMIT playhouses, aviaries, poultry houses and
undertaken prior to or during the processing them like, not exceeding 6.00 sq. meters in
of the building permit. total area, provided they are completely
detached from any other building and are
CEBDLG20

CEBDLG20
intended only for the private use of the
owner.

WEEK. 2 WEEK. 2

4
9/6/2022

SECTION 301. SECTION 301.


INTRODUCTION INTRODUCTION

PERMITS & INSPECTION


MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Building Permits BUILDING PERMITS Building Permits
3. Exemption From Building Permits 3. Exemption From Building Permits
APPLICATION FOR APPLICATION FOR
PERMIT a. Minor Constructions PERMIT a. Minor Constructions

VALIDITY OF BUILDING i. Addition of open VALIDITY OF BUILDING


PERMIT terraces or patios PERMIT iii. Garden pools for the
resting directly on habitation of water
OCCUPANCY PERMIT OCCUPANCY PERMIT
the ground, not plants and/or
exceeding 20.00 sq. https://www.pixtastock.com/
aquarium fish not
meters in total floor exceeding 500

RULE III :
area, exclusively for millimeters in depth

CEBDLG20

CEBDLG20
the private use of and exclusively for https://www.pinterest.ph/

2 2
the owner. private use.
WEEK. WEEK.

SECTION 301. SECTION 301.


INTRODUCTION INTRODUCTION

PERMITS & INSPECTION


MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Building Permits BUILDING PERMITS Building Permits
3. Exemption From Building Permits 3. Exemption From Building Permits
APPLICATION FOR APPLICATION FOR
PERMIT a. Minor Constructions PERMIT a. Minor Constructions

VALIDITY OF BUILDING ii. Installation of VALIDITY OF BUILDING


PERMIT Window Grilles PERMIT iv. Garden masonry
walls other than
OCCUPANCY PERMIT OCCUPANCY PERMIT party walls not
exceeding 1.20
meters in height,
footpaths,
RULE III :
CEBDLG20

CEBDLG20
https://gharpedia.com/ residential garden
walks and/or
2 2
https://shawbrick.ca/

driveways.
WEEK. WEEK.

5
9/6/2022

SECTION 301. SECTION 301.


INTRODUCTION INTRODUCTION

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Building Permits BUILDING PERMITS Building Permits
3. Exemption From Building Permits
APPLICATION FOR APPLICATION FOR
PERMIT PERMIT
3. Exemption From Building Permits
a. Repair Constructions
i. Repair works not a. Repair Constructions
VALIDITY OF BUILDING VALIDITY OF BUILDING
PERMIT affecting or involving PERMIT
any structural iii. Repair and/or replacement of any interior
OCCUPANCY PERMIT member, such as OCCUPANCY PERMIT portion or a house not involving addition
replacement of or alteration.
deteriorated roofing
sheets or tiles, gutters, iv. Repair and/or replacement work of doors
downspouts, fascias,

CEBDLG20

CEBDLG20
and windows.
ceilings and/or
https://www.everythingfordads.com/
sidings.

WEEK. 2 WEEK. 2 v. Repair and/or replacement work of


flooring.

SECTION 301. SECTION 301.


INTRODUCTION INTRODUCTION
MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Building Permits BUILDING PERMITS Building Permits
APPLICATION FOR APPLICATION FOR
PERMIT
3. Exemption From Building Permits PERMIT
3. Exemption From Building Permits
a. Repair Constructions a. Repair Constructions
VALIDITY OF BUILDING VALIDITY OF BUILDING
PERMIT PERMIT
ii. Repair and/or replacement of non load- vi. Repair of perimeter fence and walls.
OCCUPANCY PERMIT bearing partition walls. OCCUPANCY PERMIT
vii. Repair and/or replacement of plumbing
fixtures, fittings or pipings, such as toilet
bowls, sinks, lavatories, urinals, bidets,

CEBDLG20
pipes, faucets, valves for single detached
dwellings and duplexes

WEEK. 2

6
9/6/2022

SECTION 302. SECTION 302.


INTRODUCTION INTRODUCTION

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Application for Permits BUILDING PERMITS Application for Permits
APPLICATION FOR APPLICATION FOR
PERMIT PERMIT 3. Five (5) sets of survey plans, design plans,
1. Any person desiring to obtain a building specifications and other documents
VALIDITY OF BUILDING permit and any ancillary/accessory VALIDITY OF BUILDING prepared, signed and sealed over the
PERMIT permit/s together with a Building Permit PERMIT
printed names of the duly licensed and
shall file application/s therefor on the registered professionals.
OCCUPANCY PERMIT OCCUPANCY PERMIT
prescribed application forms.

2. Together with the accomplished

CEBDLG20

CEBDLG20
prescribed application form/s, the
following shall be submitted to the OBO:

WEEK. 2 WEEK. 2

SECTION 302. SECTION 302.


INTRODUCTION INTRODUCTION
MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Application for Permits BUILDING PERMITS Application for Permits
APPLICATION FOR
a. In case the applicant is the registered APPLICATION FOR a. Geodetic Engineer, in case of lot survey plans;
PERMIT PERMIT b. Architect, in case of architectural documents; in
owner of the lot: case of architectural interior/interior design
VALIDITY OF BUILDING VALIDITY OF BUILDING documents, either an architect or interior designer
PERMIT
i. Certified true copy of OCT/TCT, on file with PERMIT
may sign;
the Registry of Deeds,
c. Civil Engineer, in case of civil/structural documents;
OCCUPANCY PERMIT ii. Tax Declaration, and OCCUPANCY PERMIT
d. Professional Electrical Engineer, in case of
iii. Current Real Property Tax Receipt electrical documents;
e. Professional Mechanical Engineer, in case of
b. In case the applicant is not the registered mechanical documents;
CEBDLG20

CEBDLG20
owner of the lot, in addition to the above; f. Sanitary Engineer, in case of sanitary documents;
duly notarized copy of the Contract of g. Master Plumber, in case of plumbing documents;

2 2
Lease, or Deed of Absolute Sale h. Electronics Engineer, in case of electronics
WEEK. WEEK. documents.

7
9/6/2022

SECTION 302. SECTION 302.


INTRODUCTION INTRODUCTION

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Application for Permits BUILDING PERMITS Application for Permits
APPLICATION FOR Civil/Structural Documents: APPLICATION FOR Civil/Structural Documents:
PERMIT PERMIT
a. Site Development Plan c. Structural Analysis and Design for all
VALIDITY OF BUILDING VALIDITY OF BUILDING buildings/structures except for one storey
PERMIT Site Development Plan showing technical PERMIT
description, boundaries, orientation and position of and single detached building/structure
OCCUPANCY PERMIT proposed non-architectural horizontal structure such OCCUPANCY PERMIT with a total floor area of 20.00 sq. meters or
as: sewerage treatment plan (STP), silos, elevated less.
tanks, towers, fences, etc. building/structure in
relation to the lot, existing or proposed access road

CEBDLG20

CEBDLG20
and driveways and existing public utilities/services.
Existing buildings within and adjoining the lot shall be

2
hatched and distances between the proposed and
existing buildings shall be indicated.
WEEK.

SECTION 302. SECTION 302.


INTRODUCTION INTRODUCTION
MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Application for Permits BUILDING PERMITS Application for Permits
APPLICATION FOR Civil/Structural Documents: APPLICATION FOR Civil/Structural Documents:
PERMIT PERMIT
b. Structural Plans d. Boring and Load Tests
VALIDITY OF BUILDING VALIDITY OF BUILDING Buildings or structures of three (3) storeys
PERMIT i. Foundation Plans and Details at scale of PERMIT
and higher, boring tests and, if necessary,
not less than 1:100.
OCCUPANCY PERMIT OCCUPANCY PERMIT load tests shall be required in accordance
ii. Floor/Roof Framing Plans and Details at
with the applicable latest approved
scale of not less than 1:100.
provisions of the National Structural Code of
iii. Details and Schedules of structural and
the Philippines (NSCP).
civil works elements including those for
CEBDLG20

CEBDLG20
deep wells, water reservoir, pipe lines and e. Seismic Analysis

2 2
sewer system. f. Other related documents
WEEK. WEEK.

8
9/6/2022

SECTION 302. SECTION 302.


INTRODUCTION INTRODUCTION

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Application for Permits BUILDING PERMITS Application for Permits
APPLICATION FOR APPLICATION FOR Clearances from Other Agencies:
PERMIT PERMIT
a. A locational clearance shall be obtained
VALIDITY OF BUILDING VALIDITY OF BUILDING by the owner/permittee from the
PERMIT PERMIT
City/Municipal Zoning Administration.
OCCUPANCY PERMIT OCCUPANCY PERMIT b. Whenever necessary, written clearances
shall be obtained from the various
authorities exercising and enforcing
regulatory functions affecting

CEBDLG20

CEBDLG20
Image Source: buildings/structures.
https://www.metrosoils.com/

WEEK. 2 WEEK. 2

SECTION 302. SECTION 302.


INTRODUCTION INTRODUCTION
MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Application for Permits BUILDING PERMITS Application for Permits
APPLICATION FOR APPLICATION FOR Clearances from Other Agencies
PERMIT PERMIT

VALIDITY OF BUILDING VALIDITY OF BUILDING b. Application for said clearances shall be


PERMIT PERMIT requested by the owner/applicant and failure
to receive reply within seven (7) days from
OCCUPANCY PERMIT OCCUPANCY PERMIT receipt of the application for building permit
shall be sufficient not to cause further delay in
processing the building permit application by
the Building Official.
CEBDLG20

CEBDLG20
Image Source:
https://www.metrosoils.com/

WEEK. 2 WEEK. 2

9
9/6/2022

SECTION 305. SECTION 309.


INTRODUCTION INTRODUCTION

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Validity of Building Permits BUILDING PERMITS Certificate of Occupancy
APPLICATION FOR APPLICATION FOR
PERMIT
 A building permit issued under the
PERMIT 2. A notification to conduct final inspection shall
be endorsed by the OBO to the C/MFM, BFP, who
VALIDITY OF BUILDING provisions of the Code shall expire and VALIDITY OF BUILDING shall issue a Fire Safety Inspection Certificate
PERMIT become null and void if the building or PERMIT
within five (5) workings days if the Fire Safety
work authorized therein is not commenced requirement shall have been complied. If, after
OCCUPANCY PERMIT OCCUPANCY PERMIT
within a period of one (1) year after the the prescribed period no action is taken by the
issuance of the building permit, or is C/MFM, the Building Official may issue the
suspended or abandoned at any time after Certificate of Occupancy with the condition that
it has been commenced for a period of

CEBDLG20

CEBDLG20
the Fire Safety requirements shall be complied
one hundred twenty (120) days. with, within the prescribed period set forth in the

2 2
Fire Code of the Philippines (PD 1185).
WEEK. WEEK.

SECTION 309. SECTION 309.


INTRODUCTION INTRODUCTION
MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||


BUILDING SYSTEMS DESIGN

BUILDING SYSTEMS DESIGN


BUILDING PERMITS Certificate of Occupancy BUILDING PERMITS Certificate of Occupancy
APPLICATION FOR APPLICATION FOR
PERMIT 1. The owner/permittee shall submit to the OBO PERMIT 3. The OBO undertakes the final inspection,
an application of Certificate of Occupancy verification and/or review of the
VALIDITY OF BUILDING together with a duly notarized Certificate of VALIDITY OF BUILDING building/structure based on the Certificate of
PERMIT PERMIT
Completion together with the construction Completion, construction logbook, building
logbook, as-built plans and specifications and inspection sheets, original and as-built
OCCUPANCY PERMIT OCCUPANCY PERMIT
the Building Inspection Sheet all signed by plans and specifications, as the case may be
whoever is the contractor (if the construction is and specifications on the prescribed standard
undertaken by contract) and signed and form according to the requirements set forth
sealed by the Owner’s duly licensed Architect
CEBDLG20

CEBDLG20
under Section 303.
or Civil Engineer who undertook the full time
inspection and supervision of the construction
WEEK. 2 works.
WEEK.
WEEK. 32

10
9/6/2022

REFERENCES:

MIDTERM PERIOD, 1ST TERM, 2022-2023 ||||||||||||||||||||||||||||||||||||||||||||||||||||||

BUILDING SYSTEMS DESIGN


• Implementing Rules And Regulations Of
The National Building Code Of The
Philippines (PD 1096) Official Text 2005
Revised Edition; Retrieved from
www.dpwh.gov.ph

CEBDLG20