Vertical distance beween (concrete top) working pt. & stub end (bot.) 3108 mm
Bacto to Back at Lattice level (50mm above CL) for +0m base 'A' 19650 mm
Top of stub dimension (back to back) for +0m base 'E' 19245.5 mm SS(a)
Cross Check:
Bacto to Back at Lattice level (50mm above CL) for +0m base 19647.9 mm
E+Gx2xs
OKAY
MATERIALS & MANPOWER REQUIREMENTS OF SINGLE/ DOUBLE STOREY Place:Chennai(say)
RESIDENTIAL BUILDING ( from U.P. PWD Engineers Hand Book) Date: 25-05-09
= 92.9 Sq.M
10 Ballies 47 M 1M = 3.28Ft
12 Surkhi 4 Cu.M
13 Bitumen 162 Kg
14 Glass 5 SqM
15 Paint(Primer) 6 Ltr.
19 Painter 17 ManDays
20 Blacksmith 46 ManDays