L = 1.68 meters
USE:
Water demand for a residential building is at 120 litres per person per day
TOTAL WATER DEMAND PER DAY: 6 persons x 150 litres per day
1. ALL WORKS SHALL BE DONE ACCORDANCE WITH THE NATIONAL PLUMBING AND LOCAL CODE
REQUIREMENTS.
2. THE PLUMBING LAYOUT IS ONLY DIAGRAMMATIC, PIPES CLEANOUTS AND CHECK VALVES SHALL
BE CONCEALED.
4.RUN ALL HORIZONTAL PIPINGS IN DIRECT ALIGNMENT AT ONE UNIFORM GRADE OF NOT LESS
THAN TWO PERCENT (2%).
6. ALL CLEANOUTS SHALL BE FLUSHED MOUNTED TO WALL. DO NOT INSTALL FLOOR CLEANOUTS
EXCEPT AT LINES ON GRADE AND SERVICE AREAS NOT SUBJECTED TO TRAFFIC.
7. ALL UNDERGROUND GALVANIZED IRON (G.I) INDIRECT CONTACT WITH SOIL SHALL BE
PROVIDED WITH TWO (2) COATS OF TAR COVERING IN WRAPPED WITH JUTE CLOTH.
8. ALL PVC PIPE SHALL BE OF APPROVED QUALITY AND POLYPROPYLENE RANDOM PIPE FOR
WATER DISTRIBUTION SHALL BE U.S STANDARD WEIGHT.
11. ALL PLUMBING WORKS SHALL BE UNDER THE DIRECT SUPERVISION OF ALL DULY LICENSED
SANITARY ENGINEER OR A MASTER PLUMBER.
Prepared by: