Project: 2 STOREY RESIDENTIAL

Owner: SUNRISE HOLDING AND DEVELOPMENT CORP.


Location: LOAKAN, BAGUIO CITY

SUBJECT: SEPTIC TANK SIZE

Category: SINGLE FAMILY DWELLING

Total number of Bedrooms: 3 Bedrooms with 3 Full Bath

Maximum Number of Occupants: 6 occupants

Minimum Septic Tank Capacity: 3,785.00 liters

SEPTIC TANK SIZE:

A. DIGESTIVE CHAMBER LET W = 1.5 m AND THE MAXIMUM DEPTH = 1.5 m

3.80 cu.m. = LXWXH

3.80 cu.m. = (L)(1.5)(1.5)

3.80 cu.m. = 2.25 L

L = 1.68 meters

MINIMUM DIMENSION OF DIGESTIVE CHAMBER: 1.70M X1.50M X1.8M

USE:

A. DIGESTIVE CHAMBER: 2.10MX1.50MX1.80M

B. LEECHING CHAMBER A: 2.10M X1.00M X1.8M

C. LEECHING CHAMBER B: 2.10M X1.00M X1.8M

SUBJECT: WATER DEMAND & ESTIMATED WASTE/SEWAGE FLOW COMPUTATION

WATER DEMAND COMPUTATION

Total Floor Area 131.00 sq. meters

Total Number of Occupants: 6 PERSONS

Water demand for a residential building is at 120 litres per person per day

TOTAL WATER DEMAND PER DAY: 6 persons x 150 litres per day

900 LITERS PER DAY

Use: 2- 10 Drums AISI Stainless Steel Grade 304 Bestank


GENERAL NOTES:

1. ALL WORKS SHALL BE DONE ACCORDANCE WITH THE NATIONAL PLUMBING AND LOCAL CODE
REQUIREMENTS.

2. THE PLUMBING LAYOUT IS ONLY DIAGRAMMATIC, PIPES CLEANOUTS AND CHECK VALVES SHALL
BE CONCEALED.

3. PIPES SHALL BE EMBEDDED IN STRUCTURAL MEMBERS UNLESS OTHERWISE SPECIFIED.

4.RUN ALL HORIZONTAL PIPINGS IN DIRECT ALIGNMENT AT ONE UNIFORM GRADE OF NOT LESS
THAN TWO PERCENT (2%).

5. ALL FLOOR DRAIN SHALL BE VENTED INDIVIDUALLY.

6. ALL CLEANOUTS SHALL BE FLUSHED MOUNTED TO WALL. DO NOT INSTALL FLOOR CLEANOUTS
EXCEPT AT LINES ON GRADE AND SERVICE AREAS NOT SUBJECTED TO TRAFFIC.

7. ALL UNDERGROUND GALVANIZED IRON (G.I) INDIRECT CONTACT WITH SOIL SHALL BE
PROVIDED WITH TWO (2) COATS OF TAR COVERING IN WRAPPED WITH JUTE CLOTH.

8. ALL PVC PIPE SHALL BE OF APPROVED QUALITY AND POLYPROPYLENE RANDOM PIPE FOR
WATER DISTRIBUTION SHALL BE U.S STANDARD WEIGHT.

9. PROVIDE VENT PIPE THROUGH ROOF OF PVC PIPES AS REQUIRED.

10. PROVIDE GATE VALVE ON ALL WATER SUPPLY LINES TO FIXTURE.

11. ALL PLUMBING WORKS SHALL BE UNDER THE DIRECT SUPERVISION OF ALL DULY LICENSED
SANITARY ENGINEER OR A MASTER PLUMBER.

Prepared by:

CARYLL BERN S. BUENALUZ, uap, rmp


Architect/ Master Plumber
PRC no. 0040271/ 0010156
PTR no. 6232338/6232339
03JANUARY2020/ La Trinidad, Benguet