Engine Replacement REPORT Report by Report Dates

Country Company Name Site Name


Egypt Khalda NPCS
Job Safety analysis

Customer Package Engine Package Package Engine Engine Next


PD Number
Tag S/N S/N Starts Hours Hours Overhaul

Engine T70 Gas Producer, Power Turbine & Accessory Drive REPORT

KPC, NPCS
1/3
Solar Turbines
A Caterpillar Company
SITE VISIT REPORT FSR NAME

CONTENTS
SECTION 1 – INTRODUCTION..........................................................................................................................................3
............................................................................................................................................................................................3
SECTION 2 – SUMMARY ..................................................................................................................................................3
Conclusion.........................................................................................................................................................................3
Recommendation...............................................................................................................................................................3
SECTION 3 – ACTION & FOLLOW UP ITEMS................................................................................................................3
SECTION4- SPECIAL REQUIREMENTS
SPECIAL TOOLS
................................................................................................................................................................................3
SECTION 4 – DAILY ACTIVITIES....................................................................................................................................3
Day to day work.................................................................................................................................................................3
SECTION 5 – SOFTWARE CHANGES..............................................................................................................................3
............................................................................................................................................................................................3
............................................................................................................................................................................................3
SECTION 6 – ATTACHMENTS, APPLICABLE DOCUMENTS......................................................................................3
6.1 OVERALLED ENGINE TEST REPORT
6.2 LUBE OIL SAMPLE ANALYSIS
6.3 VIBRATION SURVEY
6.4 ALIGNMENT REPORT
6.5 HMI SNAP SHOTS
6.6 ENGINE PERFOMANCE RUN

Solar Turbines Europe S.A. 2/3


Solar Turbines
A Caterpillar Company
SITE VISIT REPORT FSR NAME

SECTION 1 – INTRODUCTION
OLD ENGINE OVERHAULED ENGINE
GAS PRODUCER NAME PLATE
PT NAME PLATE
ACCESSORY DRIVE NAME
PLATE
PACKAGE RUNNINING HRS
PACKAGE NO. OF STARTS
ENGINE RUNNING HRS
ENGINE NO. OF STARTS

SECTION 2 – SUMMARY OF VISIT


Conclusion
Recommendation

SECTION 3 – ACTION ITEMS


Punch list

SECTION 4 – DAILY REPORT


Day to day work

SECTION 5 – SOFTWARE CHANGE RECORD


- PACKAGE SN1:
REFERENCE SHOULD BE MADE TO SOLAR TECHNICAL LETTER 5.13.2/100
PROCESSOR NAME INITIAL:
PROCESSOR NAME FINAL:
PLC EDITS MADE:
DISPLAY EDITS MADE:
HMI HISTORY FILE UPDATED: YES / NO
BACKUP DISKS MADE: YES / NO
CUSTOMER DISKS HANDED TO:
OTHER NOTES:
- PACKAGE SN2:

SECTION 6 – ATTACHMENTS, APPLICABLE DOCUMENTS


photos, Vibration spectrum, Stripcharts

Solar Turbines Europe S.A. 3/3