● ARCHITECT-MOSHE SAFDIE ● “HABITAT 67 WAS CONSTRUCTED FROM 354 IDENTICAL

● DESIGNED-IN 1961 AND COMPLETELY PREFABRICATED MODULES (REFERRED


● BUILT IN-1967-1969 TO AS “BOXES”) STACKED IN VARIOUS COMBINATIONS
● FLOOR AREA-22157 M2 AND CONNECTED BY STEEL CABLES.
● BUILT-UP AREA-30420 M2 ● THE APARTMENTS VARY IN SHAPE AND SIZE, SINCE THEY SITE PLAN:
● LOCATION-CITÉ DU HAVRE, MONTREAL, QC, ARE FORMED BY A GROUP OF ONE TO FOUR OF THE 600
CANADA SQUARE-FOOT “BOXES” IN DIFFERENT CONFIGURATIONS.
● SAFDIE STATED THAT “HABITAT ‘67 IS ● EACH APARTMENT IS REACHED THROUGH A SERIES OF
REALLY TWO IDEAS IN ONE. ONE IS ABOUT PEDESTRIAN STREETS AND BRIDGES, ALONG WITH THREE
PREFABRICATION, AND THE OTHER IS VERTICAL CORES OF ELEVATORS FOR THE TOP FLOORS.
ABOUT RETHINKING ● SERVICE AND PARKING FACILITIES ARE SEPARATED FROM
APARTMENT-BUILDING DESIGN IN THE THE TENANT’S CIRCULATION ROUTES, LOCATED ON THE AFFORDABILITY
NEW PARADIGM.” GROUND FLOOR
● THE ON-SITE PREFABRICATION SYSTEM SHOULD
HAVE REDUCED THE COST OF PRODUCTION, AN
INTEGRAL PART OF SAFDIE’S VISION FOR
CREATING AN AFFORDABLE HOUSING COMPLEX.
● UNFORTUNATELY, DUE TO THE REDUCTION OF THE
PROJECT’S MASS SCALE, COSTS WERE MUCH
HIGHER THAN EXPECTED.
● HOWEVER, THOUGH HABITAT FAILED TO STRIKE A
NEW WAVE OF PREFABRICATION, IT SUCCEEDED IN
INITIAL APPROACH: CREATING A NEW HOUSING TYPOLOGY THAT IS
● “HABITAT 67, DESIGNED BY THE BOTH EFFECTIVE AND SITE ADAPTABLE
ISRAELI-CANADIAN ARCHITECT MOSHE
PLANNING:
SAFDIE AT THE WORLD EXPOSITION OF
1967, WAS ORIGINALLY INTENDED AS AN
EXPERIMENTAL SOLUTION FOR
HIGH-QUALITY HOUSING IN DENSE ● THE PREFABRICATION PROCESS OF THE 90-TON BOXES
URBAN ENVIRONMENTS. TOOK PLACE ON-SITE.
● SAFDIE EXPLORED THE POSSIBILITIES OF ● THE BASIC MODULAR SHAPE WAS MOLDED IN A
PREFABRICATED MODULAR UNITS TO REINFORCED STEEL CAGE, WHICH MEASURED 38 X 17
REDUCE HOUSING COSTS AND ALLOW FEET. ONCE CURED, THE CONCRETE BOX WAS
FOR A NEW HOUSING TYPOLOGY THAT TRANSFERRED TO AN ASSEMBLY LINE FOR THE
COULD INTEGRATE THE QUALITIES OF A INSERTION OF ELECTRICAL AND MECHANICAL SYSTEMS,
SUBURBAN HOME INTO AN URBAN AS WELL AS INSULATION AND WINDOWS.
HIGH-RISE. ● TO FINALIZE THE PRODUCTION, MODULAR KITCHENS
AND BATHROOMS WERE INSTALLED, AND FINALLY A
CRANE LIFTED EACH UNIT TO ITS DESIGNATED POSITION.

● BY STACKING CONCRETE “BOXES” IN VARIANT


GEOMETRICAL CONFIGURATIONS, SAFDIE WAS
ABLE TO BREAK THE TRADITIONAL FORM OF
ORTHOGONAL HIGH RISES,
● LOCATING EACH BOX A STEP BACK FROM ITS ● THE DEVELOPMENT WAS DESIGNED TO INTEGRATE THE BENEFITS OF SUBURBAN
IMMEDIATE NEIGHBOR. THIS INGENIOUS METHOD HOMES—NAMELY GARDENS, FRESH AIR, PRIVACY, AND MULTI LEVELLED
PROVIDED EACH APARTMENT WITH A ROOF ENVIRONMENTS—WITH THE ECONOMICS AND DENSITY OF A MODERN URBAN
GARDEN, A CONSTANT FLOW OF FRESH AIR AND A APARTMENT BUILDING.
MAXIMUM OF NATURAL LIGHT: ● IT WAS BELIEVED TO ILLUSTRATE THE NEW LIFESTYLE PEOPLE WOULD LIVE IN
● QUALITIES WHICH WERE UNPRECEDENTED FOR A INCREASINGLY CROWDED CITIES AROUND THE WORLD. SAFDIE'S GOAL FOR THE
TWELVE STORY APARTMENT COMPLEX. HABITAT 67 PROJECT TO BE AFFORDABLE HOUSING LARGELY FAILED: DEMAND FOR THE BUILDING'S
THUS PIONEERED THE INTEGRATION OF TWO UNITS HAS MADE THEM MORE EXPENSIVE THAN ORIGINALLY ENVISIONED.
HOUSING TYPOLOGIES—THE SUBURBAN GARDEN ● IN ADDITION, THE EXISTING STRUCTURE WAS ORIGINALLY MEANT TO ONLY BE THE
HOME AND THE ECONOMICAL HIGH-RISE FIRST PHASE OF A MUCH LARGER COMPLEX, BUT THE HIGH PER-UNIT COST OF
APARTMENT BUILDING. APPROXIMATELY C$140,000 (C$22,120,000 FOR ALL 158) PREVENTED THAT POSSIBILITY.
DESIGN ELEMENTS