You are on page 1of 2

ABT3 – CONSTRUCTION DRAWINGS IN WOOD, STEEL AND CONCRETE

(A 2-STOREY RESIDENTIAL STRUCTURE)

MAJOR PLATE

DESIGN PROBLEM:

A WELL-KNOWN BANK MANAGER JUST PURCHASED A RESIDENTIAL LOT IN ONE OF THE PRESTIGE
SUBDIVISION, A RELATIVELY FLAT TYPE OF LOT, THRU NORTH A 12.00M WIDTH FACING THE 8.00M ROAD
AND 21.00M DEPTH, HAVING A TOTAL AREA OF 252.00 SQUARE METER.

HE IS PLANNING TO LOOK FOR AN ARCHITECT TO BUILD HIS RESIDENCE. ONE OF HIS REQUIREMENTS IS
ATLEAST A TWO-TIER RESIDENCE THAT WILL SUFFICE FOR HIS FAMILY NEEDS.

HE HAS TWO DAUGHTERS, BOTH IN GRADE SCHOOL AND HE ALSO OWNED A TWO TYPES OF VEHICLES.
THRU THIS, HE IS PREPARED WHATEVER MAY BE THE CONSTRUCTION COST TO FINISH THE ENTIRE
PROJECT, IN BUILDING HIS FUTURE HOME IN AN ELEGANT WAY OF DESIGN OR AESTHETIC VALUE THAT
WILL SUIT HIS PROFESSION AND HIS ENTIRE FAMILY.

UTILIZING THE FRONT OF THE HOUSE IS ALSO ONE OF HIS REQUIREMENTS, BY HAVING A BETTER
LANDSCAPE.

DESIGN APPROACH AND WORKING DRAWING REQUIREMENTS:

1. ARCHITECTURAL
a.) PERSPECTIVE ACS
b.) SITE DEVELOPMENT PLAN 1:100M
c.) LOCATION PLAN NTS

d.) GROUND FLOOR PLAN 1:100M


e.) SECOND FLOOR PLAN 1:100M
f.) ROOF PLAN 1:100M
g.) REFLECTED CEILING PLANS 1:100M
h.) TRANSVERSE/CROSS SECTION 1:100M
i.) LONGITUDINAL SECTION 1:100M
j.) FRONT ELEVATION 1:100M
k.) RIGHT-SIDE ELEVATION 1:100M
l.) REAR ELEVATION 1:100M
m.) LEFT-SIDE ELEVATION 1:100M

n.) SCHEDULE OF DOORS AND WINDOWS 1:20/1:30M


o.) CEILING DETAILS AND SPOT DETAILS 1:20/1:30M
p.) DETAIL OF TOILET & BATH 1:20/1:30M
q.) DETAIL OF STAIRS 1:20/1:30M
r.) SPOT DETAIL OF STAIR 1:10M

s.) DETAIL OF KITCHEN 1:20/1:30M


t.) BAY SECTION 1:30M

2. STRUCTURAL
a.) FOUNDATION PLAN 1:100M
b.) SECOND FLOOR FRAMING PLAN 1:100M
c.) ROOF FRAMING PLAN, (using timber trusses and diagonal strut) 1:100M
d.) TRUSS DIAGRAM 1:80/1:40M

e.) TRUSS DETAIL 1:20/1:25M


f.) GUTTER DETAIL 1:30M
g.) COLUMN/FOOTING DETAIL 1:20M
h.) WALL FOOTING DETAIL 1:20M
i.) FOOTING-TIE BEAM DETAIL 1:20M
j.) SECOND FLOOR BEAM DETAIL 1:20M
k.) ROOF BEAM DETAIL 1:20M
l.) SLAB DETAIL 1:20M
m.) DETAIL OF STAIR (showing steel connection on conc,) 1:30M

3. PLUMBING
a.) COLD WATER LINE LAYOUT 1:100M
b.) SANITARY LINE LAYOUT 1:100M
c.) PLUMBING ISOMETERIC 1:100M
1.) Cold water line layout
2.) Sanitary line layout
d.) SEPTIC TANK DETAIL 1:30M
e.) CATCH BASIN DETAIL 1:10M
f.) PLUMBING NOTE
g.) PLUMBING LEGEND

4. ELECTRICAL
a.) LIGHTING LAYOUT 1:100M
b.) POWER LAYOUT 1:100M
c.) SCHEDULE OF LOADS AND COMPUTATION
d.) RISER DIAGRAM NTS
e.) ELECTRICAL NOTES
f.) ELECTRICAL LEGEND

ALL WORKING DRAWINGS SHALL BE IN 20” X 30” TRACING PAPER, USING PENCIL AND INK.

CONSIDER AS PER REQUIREMENT FROM THE NATIONAL BUILDING CODE (PD 1096), FIRE CODE
OF THE PHILIPPINES (RA 9514), PLUMBING CODE OF THE PHILIPPINES, NSCP (NATIONAL
STRUCTURAL CODE of the PHILIPPINES) and ELECTRICAL CODE OF THE PHILIPPINES.

AR. ABIGAIL D. ENCARNACION, UAP

You might also like