PROJECT: TWELVE STOREY MIXED USE DEVELOPMENT WITH ONE BASEMENT

PACKAGE: STRUCTURAL, MEPF & AUXILLARY WORKS

RFI MONITORING LOG

ITEM QUERIES FIELD ANSWERS DATE OF RFI


BATCH 1
1 May we request copy of VRF Refrigerant Piping and Equipment Location Layout. Mechanical See equipment schedule and see location on the drawing 16-Sep-21
2 What are the duct size for the HRV? Mechanical See the callout on the drawings 16-Sep-21
3 Mechanical TEF 1&2-100mm diam, TEF-3 -150mm diam, for Garbage Collection Room- 16-Sep-21
What are the duct size for the TEF and Exhaust for Garbage collection room? 150mm diam.
4 Is the thermostat for VRF are wireless or hardwire? If hardwire, can you give us the location of the Mechanical Thermostat is Wired, Location as per Manufacturer recommendation. 16-Sep-21
thermostat?
5  Are the Lighting Layout for the Museum, Retails and Residential Units are excluded from our scope Electrical Lighting Layout to follow 16-Sep-21
of works? There are no lighting layout for the said areas
6 Can you provide us cross sectional elevation details of the building for our reference of height in Structural see attached plan 16-Sep-21
every floor?
7 May we request confirmation that clean agent (Novec) at electrical room is excluded in our scope of Fire Protection Yes, this is not included in your scope. This is for our specialty contractor 16-Sep-21
works.
8  May we request confirmation that the pre-action system at Museum, and 2nd floor area are excluded Fire Protection This is OFCI. Part of your scope of works. 16-Sep-21
in our scope of works
9 Do you have cross sectional details for the pump room piping layout or a blow-up detail? the Plumbing Refer to P-20 16-Sep-21
drawings are small

BATCH 2
10 Please confirm the following below list if it is included in our scope; Not indicated on our BOQ: Fire Protection 20-Sep-21
1.a. Novec 1230 Clean Agent on Electronics, UPS, etc. rooms Fire Protection Out of Scope, this is for our Specialty Vendor. 20-Sep-21
1.b. Pre-action Assemblies on Museum art Areas and sensitive areas Fire Protection Part of OFCI 20-Sep-21
1.c. Wet Chemical System for Kitchen Suppression System Fire Protection Not included. By Tenant 20-Sep-21
11 Kindly provide us elevation for our schematic diagram Fire Protection FP-20 has Floor Elevation at Right side 20-Sep-21
12 Please confirm if we are going to use Victaulic Flexible Hose pipes for drops of Sprinkler Heads Fire Protection We will not use Flexible Hose. 20-Sep-21
13 Kindly provide the refrigerant pipe connections for the variable type air conditioning units. Mechanical Connection per Manufacturer. 20-Sep-21
14 Kindly provide the size of the grille for the Smoke Exhaust Duct (typical to all floors). Mechanical 700mm x450mm 20-Sep-21
Mechanical 20-Sep-21

15 Mechanical For Residential use: 150mm diam PVC Pipe, For Retail as specified on the 20-Sep-21
drawing.
Kindly confirm which will govern for the Kitchen Exhaust Duct
20-Sep-21

Mechanical

16 Mechanical TEF 1&2-100mm diam, TEF-3 -150mm diam, for Garbage Collection Room- 20-Sep-21
150mm diam.
Kindly provide the size of the Toilet Exhaust Ducts and their corresponding wall caps.
17 Mechanical TEF 1&2-100mm diam, TEF-3 -150mm diam, for Garbage Collection Room- 20-Sep-21
Kindly provide the size of the flexible duct for the kitchen exhaust and toilet exhaust ducts 150mm diam. For KED - 150mm diam PVC (For Residential, For Retail as
specified on the drawing).

BATCH 3
 
18 Kindly provide the size and details for EAF 1. (Sheet no.: M 03) Mechanical
22-Sep-21

19 Kindly provide the duct and grille size for EAF 3. (Sheet no.: M 03) Mechanical 22-Sep-21
EAF is wall mounted Fan for the Pump Room. For Garbage collection room 22-Sep-21
fan, EAF 4, same as residential Garbage Room fans. Exhaust duct of 150mm
diam with 150mm grille. Verify sleeve requirement with structural.

20 Kindly provide the size and details for FA 1. (Sheet no.: M 04) Mechanical 22-Sep-21
Capacity is indicated on the equipment schedule. For the dimension, it is 22-Sep-21
brand dependent. Different brand may have different sizes. Follow
equipment schedule for capacity to determine the dimension base on brand
catalog. Refer to the specification on the brand.

21 Kindly provide the duct sizes for the following ducts: (Sheet no.: M 05) Mechanical 22-Sep-21
Mechanical Duting and fans for By Tenant. Fans, duct indicated on the plans are for 22-Sep-21
electrical considerations only and reference for future tenants on locations.
Please consider only here the quotation for Fresh Air Grille installation.

Mechanical Duting and fans for By Tenant. Fans, duct indicated on the plans are for 22-Sep-21
electrical considerations only and reference for future tenants on locations.
Please consider only here the quotation for Fresh Air Grille installation.

Mechanical Duting and fans for By Tenant. Fans, duct indicated on the plans are for 22-Sep-21
electrical considerations only and reference for future tenants on locations.
Please consider only here the quotation for Fresh Air Grille installation.

Mechanical Duting and fans for By Tenant. Fans, duct indicated on the plans are for 22-Sep-21
electrical considerations only and reference for future tenants on locations.
Please consider only here the quotation for Fresh Air Grille installation.

Mechanical Duting and fans for By Tenant. Fans, duct indicated on the plans are for 22-Sep-21
electrical considerations only and reference for future tenants on locations.
Please consider only here the quotation for Fresh Air Grille installation.

22 Kindly provide the sizes of the following marked objects. (Sheet no.: M 07 & M08) Mechanical 22-Sep-21
Mechanical 22-Sep-21

23 Kindly confirm if this louver is part of our scope. (Sheet no.: M 03) Mechanical 22-Sep-21
Mechanical Not included this is by Others. 22-Sep-21

24 kindly check the Mechanical plan as there is no Refrigerant layout (copper pipe sizes and route) for Mechanical For Issuance of Bid Bulliten, Oct. 02, 2021 22-Sep-21
the VRF units
25 Fire Protection See on the issued Specifications 22-Sep-21
Kindly confirm type of connections to be used for all areas if butt weld including risers. Do we need to provide
flange for pipe risers connection?
26 Please provide complete pipe sizes for Waterline (potable and non-potable). Plumbing For Issuance of Bid Bulliten, Oct. 01, 2021 24-Sep-21
27 Please provide Isometric lay-out of Toilet. Plumbing For Issuance of Bid Bulliten, Oct. 01, 2021 24-Sep-21
28 Please confirm if there will be revised Residential load schedules. Circuit Numbers reflected in layout are not Electrical 24-Sep-21
matched with the description of the load sched. Please see photo for reference
Electrical 24-Sep-21

Electrical 24-Sep-21

29 Please provide schematic/single line for MTS of Residential Units. Electrical 24-Sep-21
30 Please provide Emergency Panel. Electrical 24-Sep-21
31 Please confirm if MC-3 Panel is included since Unit Panels is also reflected in Meter Center at Basement 3. Electrical 24-Sep-21
Electrical 24-Sep-21

Electrical 24-Sep-21

32 Electrical 24-Sep-21
If MC-3 is included, please confirm if it is fed from 250AT Plug-In which is not reflected in SLD and layout.
BATCH 4
33 Mechanical For Issuance of Bid Bulliten, Oct. 02, 2021 23-Sep-21
May we request the refrigerant piping layout of FCU's interconnected to ACCU's and schematic
diagram if available? As per drawings, no reflected copper piping.
34 Mechanical OFCI, Included. 23-Sep-21
On your Bid Bulletin No. 2, item no. 4 your responded connection per manufacturer,  we want to
clarify that the refrigerant piping works for VRF will be scope of client choice manufacturer?
35 Mechanical For Issuance of Bid Bulliten, Oct. 02, 2021 23-Sep-21
Manufacturer will provide the final refrigerant pipe sizing however, we need to see the pipe layout to
determine the connection of FCU to ACCU as well as the routing of the pipes. Kindly provide as
requested.
23-Sep-21

BATCH 5
36 Kindly provide the tag for the pieces of equipment shown. Mechanical 22-Oct-21
Both are ACU 6V.

37 Mechanical 22-Oct-21
Kindly provide the copper pipe connections for the Variable type Air Conditioning Units. (These examples only
represent few units in the plan.)
These ara by Tenant. Exclude in your proposal. (Note: as per sir max, this
should be included in the cost proposal)

38 Please verify locations for the branch circuits for PPELEV and PPBP, these are not reflected in layout. Electrical For Issuance of Bid Bulletin 22-Oct-21
39 Please verify exact location for the FCUs and HRV at Residential Units Electrical Refer to Mechanical Plan M-9 to M-18 22-Oct-21
40 Please verify exact loactions of the EF at Genset/Transformer Vault Room Electrical For Issuance of Bid Bulletin 22-Oct-21

41 Please verify exact locations of ACCU at Admin, Security Office and Fire Command Office Electrical Refer to Mechanical Plan M-4 22-Oct-21
42 Please confirm if pullboxes should be provided for MC-COM circuits Electrical Yes provide pullboxes above ceiling inside the unit/retail area 22-Oct-21
RONALD
FREDDIE
NEL

C/O BIDDER STATUS ISSUETO BIDDERS

RONALD Ervil Innovation COMPLETED BB1/ Sept. 20, 2021


RONALD Ervil Innovation COMPLETED BB1/ Sept. 20, 2021
RONALD Ervil Innovation BB1/ Sept. 20, 2021
COMPLETED
RONALD Ervil Innovation BB1/ Sept. 20, 2021
COMPLETED
FREDDIE Ervil Innovation
PENDING
NEL Ervil Innovation BB1/ Sept. 20, 2021
COMPLETED
RONALD Ervil Innovation BB1/ Sept. 20, 2021
COMPLETED
RONALD Ervil Innovation BB1/ Sept. 20, 2021
COMPLETED
RONALD Ervil Innovation BB1/ Sept. 20, 2021
COMPLETED

RONALD QUEST-AIR COMPLETED BB2/ Sept. 23, 2021


RONALD QUEST-AIR COMPLETED BB2/ Sept. 23, 2021
RONALD QUEST-AIR COMPLETED BB2/ Sept. 23, 2021
RONALD QUEST-AIR COMPLETED BB2/ Sept. 23, 2021
RONALD QUEST-AIR COMPLETED BB2/ Sept. 23, 2021
RONALD QUEST-AIR COMPLETED BB2/ Sept. 23, 2021
RONALD QUEST-AIR COMPLETED BB2/ Sept. 23, 2021
RONALD QUEST-AIR COMPLETED BB2/ Sept. 23, 2021
RONALD QUEST-AIR BB2/ Sept. 23, 2021

COMPLETED
RONALD QUEST-AIR BB2/ Sept. 23, 2021
COMPLETED
RONALD QUEST-AIR BB2/ Sept. 23, 2021

COMPLETED
RONALD QUEST-AIR BB2/ Sept. 23, 2021
COMPLETED
RONALD QUEST-AIR BB2/ Sept. 23, 2021

COMPLETED

QUEST-AIR
RONALD QUEST-AIR

PENDING
RONALD QUEST-AIR PENDING
RONALD QUEST-AIR

PENDING
RONALD QUEST-AIR PENDING
RONALD QUEST-AIR

PENDING
RONALD QUEST-AIR PENDING
RONALD QUEST-AIR

COMPLETED
RONALD QUEST-AIR

COMPLETED
RONALD QUEST-AIR

COMPLETED
RONALD QUEST-AIR

COMPLETED
RONALD QUEST-AIR

COMPLETED
RONALD QUEST-AIR PENDING
RONALD QUEST-AIR

PENDING
RONALD QUEST-AIR COMPLETED
RONALD QUEST-AIR

COMPLETED
RONALD Ervil Innovation
PENDING
RONALD QUEST-AIR
PENDING
RONALD QUEST-AIR PENDING
RONALD QUEST-AIR PENDING
FREDDIE QUEST-AIR
PENDING
FREDDIE QUEST-AIR

PENDING
FREDDIE QUEST-AIR

PENDING
FREDDIE QUEST-AIR PENDING
FREDDIE QUEST-AIR PENDING
FREDDIE QUEST-AIR PENDING
FREDDIE QUEST-AIR

PENDING
FREDDIE QUEST-AIR

PENDING
FREDDIE QUEST-AIR
PENDING

RONALD 5-Top Builders &


Industrial Sale Corp
COMPLETED
RONALD

COMPLETED
RONALD

COMPLETED
RONALD

COMPLETED
RONALD QUEST-AIR COMPLETED Issue Bid Bulletin 7

RONALD QUEST-AIR
PENDING

FREDDIE QUEST-AIR PENDING


FREDDIE QUEST-AIR COMPLETED Issue Bid Bulletin 7
FREDDIE QUEST-AIR Issue Bid Bulletin 7
COMPLETED
FREDDIE QUEST-AIR COMPLETED Issue Bid Bulletin 7
FREDDIE QUEST-AIR COMPLETED Issue Bid Bulletin 7