You are on page 1of 67

1

Background
BETS Consulting Services Ltd. is one of the leading consulting firms in Bangladesh. It started its
journey in the year 1979 as Bangladesh Engineering and Technological Services Ltd. (BETS). In the
year 2005 it renamed as BETS Consulting Services Ltd. (BETS).
BETS enjoys unique reputation in its fight against poverty, hunger and poor social context, where
BETS is a proud development partner providing appropriate and sustainable solutions for infrastructure
development through innovative technologies, affordable ideas, capacity building, proper policy-
making, suitable institutional reforms and community participation.
Ever since its establishment in 1979, BETS has developed into a premier consultancy organisation
providing services from the stage of conceptualisation to planning, design and detailed engineering of
diverse discipline projects. Focusing on the need of clients, BETS has expanded its activities in
diversified fields to develop areas of complementary expertise and strengthen firm’s capabilities.
Collective professional achievements include a large number of assignments spread all over
Bangladesh and of late in Tajikistan, Kazakhstan, Uzbekistan, Azerbaijan, Georgia, Afghanistan,
Pakistan, Cambodia, Nepal, Albania, Somaliland, Tanzania, Vietnam, Papua New Guinea, Sudan and
Yemen.
The firm has a highly experienced team of about 450 experts and professionals in different fields.
BETS professional achievements include a large number of assignments spread all over Bangladesh
and abroad. BETS is staffed by eminent, experienced and qualified professionals. The professional
staff of BETS comprises Engineers of various disciplines, Project Management and Quality Assurance
Experts, Educationists, Designers, Agriculturists, Irrigation Specialists, Hydrologists, Energy
Specialists, Community & Institutional Development Specialists, Financial Analysts, Sociologists,
Economists, Socio-economists, IT Specialists, Environmentalists, Architects, Planners, etc. BETS also
has an active panel of associate consultants and advisors with rich experience in various fields and
known in their fields of expertise. They cover a wide range of disciplines and specialities. This has in
effect led to an integrated approach to planning, particularly for projects, which have multi-disciplinary
ramifications.
BETS has worked at both national and international levels for public as well as private sector clients
and has successfully participated many projects funded by most of the international funding agencies
like the WB, IDA, ADB, IDB, SFD, DFID, JICA, JBIC and other funding agencies and therefore is
familiar with their procedures.
BETS is an ISO 9001-2015 certified company and maintains quality management system standard. As
an ISO Certified Company, we mainly put emphasis on effective planning, operation and quality
management system processes. With quality assurance, the company is better equipped and prepared
to deliver at an even higher level.
Our clients range across the public and private sectors at home and abroad. They include govt., semi-
govt., local government, autonomous bodies, international, multi and bilateral funding agencies. We
help our clients to realize their objectives by developing and delivering practical solutions, adding value
to their services through application of our experience, innovative thinking and state-of-the-art
technology.
BETS has achieved an enviable record of success with an involvement in about 585 projects at home
and abroad. This level of experience was made possible by the application of highly specialized
expertise and total impartiality. This serves as a testimony to the reputation and trust gained over more
than 42 years of uncompromising effort.
BETS is proud to have been favoured with the trust and confidence by its many clients. BETS offers on
all projects international standard of creative thinking backed by diverse range of applicable
engineering technologies. Working to realize the dreams and hopes of people to improve their living
standards, BETS excels at concepts that continue to serve their purpose as key building blocks in the
expanding economic infrastructure.

2
Trainings and transfer of technology has become one of the integral project components for most of the
projects undertaken by BETS. Over the time BETS has established a sound track record in the design
and implementation of training programs with particular focus on development of technical expertise
geared towards Continuing Professional Development (CPD), Institutional Capacity Building and
Human Resources Development (HRD).
The firm is registered with World Bank (32355), Asian Development Bank (000464) and Islamic
Development Bank (B310). As an independent consulting firm, BETS has no commercial, manufacturing
or contracting interest. The firm complies with the requirements for membership in the International
Federation of Consulting Engineers (FIDIC) and Federation of Consultants from Islamic Countries (FCIC).

General Information
Name of the Firm : BETS Consulting Services Ltd.

Acronym : BETS

Year of Establishment : 1979

Age of the Firm : 42 years


Type of Organization : Private Limited Company and registered under Joint Stock
Companies Act, 1913
Company Registration No. : C-7240/99 of 1979 – 80 dated August 14, 1979
(Renamed by Joint Stock Company vide Issue No. 25996 dated 5th
April 2005)
ISO 9001: 2015 Certificate No. : BAN450927
Tax Identification Number : TIN No. 238813160238, Taxes Circle-155, Taxes Zone-08
[Previous TIN: 2452000609]
VAT Registration No. : 18141055205 (Area Code : 180304)
BIN No. : 002315308-0101
Trade License : Trade License No. 03-084824, Ward No.19, Issue No. 424,
Issue Date 01/08/2018 under Dhaka North City Corporation
Mailing Address : House No. 10, Road No. 135, Gulshan-1, Dhaka-1212, Bangladesh
Telephone Numbers : +8802222289923, 02222261530, 02222261532
Telex/Fax Number : (880 2) 9889967
E-Mail : bets@betsbd.com; shabur@betsbd.com
Web : www.betsbd.com
Contact Person : Dr. Abdus Shabur, Managing Director
Tel: 88 02222261534
Fax: 880-2-9889967
Email: bets@betsbd.com; shabur@betsbd.com

3
Management
The overall management of BETS rests on a Board of Management. All the Directors and General
Managers under Board of Management have proven qualification and experience with high level of
management capabilities. The management is familiar with the relevant development sectors of
national and international levels. The Board of Management convenes regularly to discuss policy
issues, project management and future course of activities.
Moreover, each and every Director/General Manager meets regularly with the senior division
professionals in order to identify and remove bottlenecks of the Department and discuss status of
different on-going projects and other relevant issues.
BETS management provides backstopping services to the projects including Quality Assurance,
Contractual Negotiations, Financial Management, Travel/Medical, Database Development, Project
Accounting, Report Production, etc.
In addition to that a fully developed Management Information System (MIS) is functional to generate
and provide required management information like status of ongoing projects, developing projects,
staff resources, inventories of documents, CVs, etc. The MIS is continuously updated to meet the
management requirement and to facilitate decision-making.

BOARD OF MANAGEMENT
Managing Director
Dr. Abdus Shabur
M.Sc.(Ground Water Engg.), Azerbaijan State University, Baku, Azerbaijan, 1982
Ph.D.(Hydrogeology), Azerbaijan State University, Baku, Azerbaijan, 1988

Director, Finance
Ms. Ishita Kabir
Bachelor in Economics, Monash University,
Melbourne, Australia, 2005

KEY MANAGEMENT PERSONNEL


In-charge, Water Supply, Sanitation & Environment (WSE) General Manager, Infrastructure, Power & Energy (IPE)
Mir Towfiq Hussain Kazi Mizanur Rahman
Masters in Engineering (Civil- Environment) Course M.Sc. in Civil Engineering in 1996 from Kuban States
completed Thesis on going, Ahsanullah University of Technological University in Russia
Science & Technology (AUST), Dhaka, Enrolling. (Specialization: Industrial and Civil Engineering)
Masters of Business Administration (Executive), Major in MBA from Bangladesh Open University, 2008
Supply Chain Management (SCM), University of Asia
Pacific Dhaka, Bangladesh, 2013.
B. Sc. in Civil Engineering, Ahsanullah University of
Science & Technology (AUST), Dhaka, 2005.
General Manager, Education & Social Science (ESS) In-charge, Water Resources &
Md. Badiuzzaman Agriculture (WRA)
M.Sc. in Applied Mathematics, Dhaka University, 1977 Ratan Paul Choudhury (M.Arc)
Post Graduate Diploma in Development Planning from MBA (Management of Organization), Saint Petersburg
National Academy for Planning and Development, 2014 State Polytechnic University, Russia, 2004;
M. Arch, 2000, Saint Petersburg State University of
Architecture & Civil Engineering, Russia
Advisor, Gas & Energy Sector Department
Delawar Bakht, P.Eng.
B.Sc. Engg. (Civil), BUET, Dhaka, 1968
M. Engg. (Civil), BUET, Dhaka, 1998
Completed works under Ph.D program with Environmental
Engineering Division at BUET

4
BETS Organizational Structure

BETS

Board of Management
Advisory Panel
Legal Tax Financial

Managing Director

General Manager General Manager General Manager General Manager


Water Supply, Water Resources Infrastructure, Education & Social
Sanitation &
& Agriculture Power & Energy Science
Environment
(WSE) (WRA) (IPE) (ESS)

 Water Supply  Flood Control  Rural & Urban  Socio-economic


 Sanitation Infrastructure
 Drainage & studies
 Sewerage & Irrigation  Roads and  Institutional
Drainage Bridge Development
 Land
 Environment Reclamation  Building  Education
 ETP, CDM  Hydrology &  Power and  Financial
 Solid Waste Hydrogeology Energy Management &
Management  Waterways &  Land Banking
Port Management  Information
 Railway Technology
 Agriculture
 MIS, GIS

OTHER KEY UNITS


Project Development &
Bidding Unit

Admin. & General


Services
Research, Development &
Applications
Accounts & Audit

GIS & CAD

5
Field of Activities
WATER SUPPLY, SEWAGE AND SANITATION ENERGY, ELECTRICAL & MECHANICAL ENGINEERING
 Sanitation Structures, e.g. Pumping Stations, Water  Energy Planning
Treatment Plants etc.  Power Sector Planning & Strategy
 Urban and Rural Water Supply  Gas Sector Planning & Strategy
 Environmental Sanitation  Power transmission
 Water Supply System Planning and Engineering  Power distribution
 Sewerage System & Sewage Treatment  Illumination & building electrification
 Industrial Water & Waste Management  Telecommunication & telemetry systems
 Water Pollution Control  Infrastructure development
 Solid and Municipal Waste Management  Ventilation & air-conditioning
ENVIRONMENTAL ASSESSMENT  Plumbing, fire fighting & Lifting
 Environmental Assessment including IEE & EIA  Maintenance management
 Environmental Management Plan (EMP) ARCHITECTURE
 Environmental Monitoring Services (EMS)  High-rise Building
 Resettlement Action Plan (RAP)  Urban and Physical Planning
WATER RESOURCE MANAGEMENT AND AGRICULTURE  Housing
 Water Resource Management  Commercial Complex
 Irrigation, Drainage, Flood Control & Land Reclamation  Universities / Institutions
 Embankment Protection  Hospitals
 Ground Water Modelling  Banks
 Ground Water Management  Industrial Complex
 Hydrology and Hydrogeology STRUCTURAL & CIVIL ENGINEERING
 Simulation modelling  Buildings
 Agriculture and Rural Development  Public, Residential & Commercial Structures e.g.
INFRASTRUCTURE DEVELOPMENT Theatres, Town Halls, Hotels, Hospitals etc.
 Urban & Rural Infrastructure Development like Road,  Industrial Plant Buildings and Structures
Bridge, Culverts, Drainage, Growth Centres, Power, AGRO-INDUSTRIES
Water & Sanitation System  Agro-processing
 Preparation of Master Plan  Agro-industries
 Hill Tracts Regional Development Plan  Agro-management
 Hand Tube-well & Village Water Supply RIVER AND PORT
 Hand Tube-well Screening for Arsenic Contamination  Surface Water Modelling
BASELINE SURVEY, ECONOMIC AND SOCIAL STUDIES &  Jetties and Ports
INSTITUTIONAL STRENGTHENING  Ferry and Approach Roads
 Baseline Survey  River Morphology
 Socioeconomic Survey, Data Collection  River Engineering & Training
 Socioeconomic Studies INFORMATION TECHNOLOGY (IT)
 Social Impact Assessment and Monitoring  Computer Services
 Impact Evaluation Studies  System Study
 Focus Group Discussion  Data Processing
 Stakeholder Identification  MIS & GIS
 Monitoring and Evaluation  Computer Aided Design
 Capacity Building  Procurement Monitoring System (PMS) Design
 Institution Strengthening TRAINING AND EDUCATION
 Community Development  Curricula Development
URBAN AND RURAL PLANNING  Design and programming
 Community and Regional Planning  Program Implementation
 Urban Planning and Design  Institutional Strengthening
 Housing Development  Human Resource Development
 Stadium and Sports Ground  Formal Education
TRANSPORTATION  Classroom Training
 Transport Planning & Economics  On the Job Training
 Traffic Surveys and Operations PROJECT MANAGEMENT
 Roads and Highways  Organization
 Transportation System Engineering  Coordination
 Transport Physical Planning  Cost Planning
 Cost Monitoring
 Railway
 Project Scheduling
 Time Schedule Control
 Quality Control

6
Key Personnel
In terms of manpower strength, BETS has now over 450 members of engineers, professionals and
support staff of various discipline, majority of whom are highly qualified, experienced, skilled with wide
knowledge of relevant modern technologies. They form a coordinated team to use the advanced
technical resources available to them, thus ensuring that projects of whatever nature are studied,
designed and constructed which best suit the requirements of the clients and incorporate the most up-
to-date technology and method available at that time.
Besides its full time staff, BETS has contractual arrangement with several specialized firms and
individual experts who work as associates in specific projects under BETS’ overall management.

Professionals by Discipline
 Water Supply, Sewage and Sanitation Engineer  Geo-technical Engineer
 Water Treatment Plant Specialist  Civil Engineer (Construction)
 Drainage & Irrigation Engineer  Education Specialist
 Planning and Design Engineer  Management Specialist Environmental Specialist
 Environmental Specialist  Energy Specialist
 Water Resources Management Specialist  WID Development/Gender Specialist
 Hydraulic and River Engineer  Finance & Accounting Management Specialist
 Hydrologist/Hydro-geologist/Eng.  NGO Specialist
 System Analyst/Data Management  Monitoring & Evaluation Specialist
Expert/Programmer  Legal Specialist
 Training Specialist  Survey Specialist/Land Acquisition Specialist
 Institutional Development Specialist  Agricultural Engineer/ Agronomist, Fishery
 Survey Specialist Spec./Livestock Specialist
 Socio-economist  Petroleum Engineer
 Sociologist/Rural Credit Specialist  Chemical Engineer
 Communication Specialist  Environmental Engineer
 Road / Bridge Engineer  Electrical and Mechanical Engineers
 Structural Engineer  Architect/Planner
 GIS Specialist  Junior Engineer
 Geologist

Support Staff by Discipline


 Surveyors / Estimators
 Administrative Officer/Accountant
 Diploma Engineer
 Computer Operator
 Draftsman
 Junior Officer / Enumerators
 Driver
 Office Assistants / Peon
 Night Guard
 Cleaner
 Photocopy Operators

7
Staff Abilities
Project
Surveys Studies Design & Planning Implementation
Management

 Hydraulic  Land-use  Concept Design  Supervision of  Objectives


Investigations Planning Construction
 Preliminary Design  Conflict Analyses
 Hydrological  Sector Planning  Supervision of
Surveys  Final Design Installations  Public Relations
 Demand Studies
 Hydrological  GIS Development  Documentation  Official
Assessments  Feasibility Authorization
Studies  Quantity Survey  Payment Certificates Procedure
 Geotechnics
 Economic  Cost Estimate  Final Inspection and  Financial Planning
 Geology Evaluations Certificate of
 Tender Documents Completion  Monitoring
 Topography  Financial
Analysis  Bid Evaluation  Contract Documents  Work and Time
 Baseline Survey Schedules
 Master Planning  Recommendation
 Traffic  Cost, Time and
 Environmental  Budgets Quality Control
 Inventories Assessments
 Coordination
 Emission  Socio-economy
Surveys  Training
 Forecasts
 Flora and Fauna

8
Major Clients
BETS has a long working relationship based on confidence and cooperation with major international and
national agencies / organizations and institutions. Among others these are:
International
 Asian Development Bank (ADB)  Afghan Association Coordination Unit
(AACA)Australian Youth Ambassadors for
 The World Bank (WB)
Development Program, Australia
 United Nations Fund for Population Activities (UNFPA)
 Japan International Cooperation Agency (JICA)
 United Nations Development Program (UNDP)
 Occidental, Bangladesh
 United Nations Children’s Fund (UNICEF)
 Chevron / UNOCAL, Bangladesh
 Department For International Development (DFID)
 Shell Hydrocarbons Holdings B.V.
 International Fund for Agricultural Development (IFAD)
 Mott MacDonald (UK)
 Ministry of Water Management & Amelioration, Tajikistan
 Mott Ewbank Preece (UK)
 Ministry of Transport, Tajikistan
 Cairn Energy Plc.
 Islamic Development Bank (IDB)
 Okland Oil Company
 Ministry of Education, Tajikistan
 Nippon Koei Co. Ltd. of Japan
 Tajik Power Board (Barki Tajik), Tajikistan
 Japan Engineering Co.
 Ministry of Urban Development and Housing,
 Ontario Centre for Environmental Technology
Afghanistan
Advancement (OCETA), Canada

National
 Dhaka Water Supply and Sewerage Authority (DWASA)  Flood Plan Co-ordination Organization
 Chittagong Water Supply & Sewerage Authority (CWASA)  Bangladesh Tobacco Company Ltd. (BTC)
 Khulna Water Supply and Sewerage Authority (KWASA)  Bangladesh Road Transport Corporation (BRTC)
 Local Government Engineering Department (LGED)  Bangladesh Tea Board (BTB)

 Chittagong Port Authority and Mongla Port Authority  Directorate of Family Planning, GoB
 Royal Danish Embassy, Dhaka
 Department of Public Health Engineering (DPHE)
 Bureau of Manpower Employment & Training
 Bangladesh Water Development Board (BWDB)
 Bangladesh Telegraph & Telephone Board (BTTB)
 Water Resources Planning Organization (WARPO)
 Monirampur Pourashava Authority
 Bangladesh Power Development Board (BPDB)
 Power Grid Company of Bangladesh (PGCB)
 Rural Electrification Board (REB)
 Biman Bangladesh (BB)
 Department of Agricultural Extension (DAE)  Bangladesh Railway (BR)
 Bangladesh Agricultural Development Corporation (BADC)
 Ministry of Environment and Forest (MoEF)
 Roads & Highways Department (RHD)
 Ministry of Chittagong Hill Tracts Affairs (MCHTA)
 CARE-Bangladesh
 Ministry of Textile, Dhaka
 Ministry of Shipping (MoS)
 Titas Gas Transmission & Distribution Co. Ltd.
 Bangladesh Inland Transport Authority (BIWTA) (TGTDCL)
 Ministry of Land (MoL)  Gas Transmission Company Ltd. (GTCL)
 Department of Environment (DoE)  Bangladesh Petroleum Exploration & Production
 Civil Aviation Authority of Bangladesh (CAAB) Company Ltd. (BAPEX)
 The Unit for Policy Implementation (UPI)
 Dhaka City Corporation (DCC)
 Rajdhani Unnayan Kartipakkha (RAJUK)
 Directorate of Land Records & Surveys (DLRS)
 Directorate of Primary Education
 Petrobangla & its Operating Companies
 Ministry of Food
 Bangladesh Fertilizers and Agrochemicals Ltd.  BGMEA
 Tullow Bangladesh Ltd.  Lafarge Surma Cement

9
Major Funding Agencies
BETS worked in the projects funded by the following major funding agencies:
 The World Bank (WB)  United States Agency for International Development
(USAID)
 Asian Development Bank (ADB)
 International Fund for Agricultural Development (IFAD)
 Islamic Development Bank (IDB)
 Canadian International Development Agency (CIDA)
 Japan International Cooperation Agency (JICA)
 Saudi Fund for Development (SFD)
 United Nations Children's Fund (UNICEF)
 Australian Government agency responsible for managing
 United Nations Development Programme (UNDP)
Australia's overseas aid program (AUSAID)
 Kreditanstalt für Wiederaufbau (KfW)
 The Overseas Economic Cooperation Fund (OECF)
 Duch Ministry of Foreign Affairs (DGIS)
 Commission of the European Communities (CEC)
 World Health Organization (WHO)
 The Norwegian Agency for Development Cooperation
 Ministry of Foreign Affairs of Denmark (DANIDA) (NORAD)
 The International Development Association (IDA)  Official Development Assistance (ODA), Japan
 The Department for International Development (DFID)  European Economic Community (EEC)
 European Union (EU)

International Associates
BETS has worked in association with more than 50 international consulting firms, the list of which is
presented below:
 Adskill (Malaysia)  Lahmeyer International (Germany)
 Arcadis, Euroconsult (The Netherlands)  Lanka Engineering Services (Sri Lanka)
 AUSTRAINING International Pty Ltd. (Australia)  Lechner & Partners (Germany)
 BCEOM (France)  Louis Berger (USA)
 Binnie & Partners Consulting Engineering (UK)  Martech International Inc. (USA)
 BKH (The Netherlands)  MI Environmental Services (USA)
 Booz, Allen & Hamilton, USA & Singapore  Mott MacDoland (UK)
 Camp Dresser & McKee International (USA)  Nathan Associates, USA
 CNR (France)  North West Hydraulics (Canada)
 Coode & Partners (UK)  OPCV (Australia)
 Coode Blizard (UK)  Pricewaterhouse Coopers (Canada)
 Corporate Solutions Ltd. (UK)  Rhein-Ruhr (Germany)
 Lumina Geophysical L.L.C., USA  Royal Haskoning (The Netherlands)
 UGA SEISMIC SA, Argentina  SATEC Development (France)
 GEUS, Geological Survey of Denmark and Greenland,  SEBA Messtechnic (Austria)
Denmark  Shawining Lavalin Inc. (Canada)
 Ramboll Group A/S, Denmark  Sir William Halcrow & Partners Ltd. (UK)
 Danish Hydraulic Institute (DHI) (Denmark)  Sloner Associates Inc. (USA)
 Danish Trading Co. (Pvt) Ltd. (Sri Lanka)  Span Consultants Pvt. Ltd. (India)
 Delft Hydraulics (The Netherlands)  Span Travers Morgan Intl. Ltd. (India)
 DEMAS (The Netherlands)  Thames Water International (UK)
 Department of Education Training and Employment  WS Atkins International Ltd. (UK)
(Australia)
 NEXENT, USA
 DHV (The Netherlands)
 RRI Beller GMBH Consulting Engineers, Germany
 Department of Land Administration (DOLA), Australia  Korea Consultants International Co. Ltd. (KCI)
 Ernst & Young International, New York, USA  Kocks Consult GmbH, Germany
 French Engineering (France)  Wood Mackenzie Ltd. UK.
 GKW Consult (Germany)  Mega Engineering Ltd., Canada
 HPC Hamburg Port, Consulting GMBH (Germany)  TG Engineering Inc., Canada
 International Development Institute for Organization  Northstar Drillstem Testers Inc., Calgary
and Management, USA  Consulting Engineering Services Pvt (India) Ltd. (CES),
 IWACO B.V (The Netherlands) India
 Scott Wilson, India

10
 Hi-Tech International, USA  Fichtner Water & Transportation GmbH, Stuttgart
 SMART Engineering Team, Afghanistan  FINNISH ENVIRONMENT INSTITUTE, Finland
 FINNROAD LTD, Finland
 NESPAK, Pakistan
 Full Bright Consultancy, Nepal
 JPZ, Malaysia  German Water and Energy GMBH, Germany
 SAMES (Pvt.) Ltd., Italy Aarvee Associates Architects  GFA Management GmbH
Engineers & Consultants Pvt. Ltd., India
 GFA MANAGEMENT GMBH, Germany
 ABT Associates, INC., USA  GHD PTY LTD, Australia
 ACE-Agrar Consulting GmbH Einbeck, Germany  GHK (HONG KONG) LTD.,
 ACIL Australia Pty. Ltd., Australia  Gibb Limited, UK
 ACRES INTERNATIONAL, Canada  Gitec Consult GmbH, Germany,
 AFC Consultants International GmbH, Germany
 Green City India
 Agribusiness International Pty. Ltd, Australia  Hagler Bailly, USA
 Agriconsulting S.P.A, Italy
 HALCROW, UK
 ALMEC Corporation, Japan  Haskoning BV Consulting Engineers, Netherlands
 Amberg Consulting Engineers Ltd., Switzerland  Hassall and Associates Pty. Ltd., Australia
 Ambidji Group Pty Ltd (THE), Australia  Hatch Associates Ltd., Canada
 Aquanet BV, The Netherlands  Hifab, Sweden
 ARD Inc. (Associates in Rural Development), U.S.A
 HYDRO - YEMEN, Yemen
 Asia Pacific Engineering Consultants J.V Co., Vietnam  HYDROPLAN Ingenieur-Gesellschaft mbH, Germany
 ASPI Consulting Engineers, Inc., Azerbaijan
 Hydrosult Inc, Canada
 Associated Consulting Engineers-ACE (Pvt.) Ltd., SA  I.T. Transport Limited, U.K
 Australian Water Technology (AWT), Australia  IDEA Consultants, Inc., Japan
 Bceom Societe Francaise Dingenierie, France  Indochine Engineering Vietnam Ltd,
 Beijing IWHR Corporation (BIC), China  INDUS ASSOCIATED CONSULTANTS (PVT) LTD.,
 Benchmark International Group Pty. Ltd., Australia Pakistan
 BKH Consulting Engineers, Netherlands  Intercontinental Consultants & Technocrats Pvt. Ltd. -
 Black & Veatch, USA TRANSPORTATION, India
 BRGM, France  Intercontinental Consultants and Technocrats Pvt. Ltd,
 BRL Ingenierie, France India
 CAI Consulting (formerly MNT Consulting), Kyrgyz  INTERNATIONAL RESOURCES GROUP, LTD., USA
 Camp Dresser & Mckee International Inc., USA  IOS PARTNERS, INC., U.S.A
 Canora Asia Inc., Canada  ITECO Engineering Ltd., Switzerland
 Cardno MBK International Pty. Ltd., Australia  ITECO Nepal (P) Ltd., Nepal
 Carl Bro Group, Denmark  IWACO (Consultant for Water & Environment)
 Chakra Infrastructure Consultants Private Limited, India  Jaako Poyry Group, Finland
 Chemonics International, INC., USA  Japan Overseas Consultants (JOC), Japan
 CNR (Compagnie Nationale du Rhone), France  Joyce Engineering, Inc., USA
 Connell Wagner Pty Ltd, Australia  Jurutera Perunding Zaaba Sdn. Bhd., Malaysia
 CONSIA, Denmark  Kampsax AB, Sweden
 Consulting Engineers, Architects and Planners, India  KAMPSAX INTERNATIONAL A/S, Denmark
 Cowater International Inc., Canada  KATAHIRA & ENGINEERS INTERNATIONAL, Japan
 COWI Consulting Engineers and Planners AS,  Kellogg Brown & Root Pty Ltd. , Australia
Denmark  KEO International Consultant, Kuwait
 CPCS UPHAM CORPORATION, U.S.A  Kiso Jiban Consultants, Japan
 CRE Group Ltd., UK  KOCKS Consult GMBH, Germany
 Cumming Cockburn Ltd. (Water Resources Group),  KOMEX International Ltd. Canada
Canada  Lahmeyer International GMBH, Germany
 Dainichi Consultant Inc., Japan  LANDELL MILLS LIMITED, UNITED KINGDOM
 Dames & Moore, Inc., USA  LEA INTERNATIONAL LTD., CANADA
 Dangroup International, Denmark  LEADING EDGE AVIATION SDN.BHD., Malaysia
 Danish Road Directorate, Denmark  Les Consultants LBCD Inc., Canada
 Darul Handus, Lebanon  Lincoln International, NZ
 DDFC Group of Companies,  Louis Berger International Inc.,
 DEMAS Dredging Consultants BV, Netherlands  Mandala Agricultural Development Corporation,
 Dessau-Soprin International, Inc., Canada  MARTECH International, Inc.,
 DEVTEC Nepal Pvt. Ltd., Nepal  MBH, S.D.C CONSULTING CO., LTD, Cambodia
 DHV, Netherlands  Melbourne Enterprises International Ltd., Australia
 DOHWA Consulting Engineers Co. Ltd, Korea  Montgomery Watson,
 Dorsch Consult Ingenieurgesellschaft Mbh, Germany  Mott Macdonald, U.K
 Duerden &Keane Consultants Inc., Canada  N K Buildcon Pvt. Limited, India
 Ecology & Environment, USA

11
 EGIS Consulting, Australia  National Engineering Services Pakistan (pvt.) Limited,
 Engcon Limited, Canada Pakistan
 ENGCONSULT LTD., Canada  Netherlands Economic Institute (NEI), The Netherlands
 ENTEC UK LTD., UK  Sheladia Associates, Inc. USA
 Environment & Resource Technology Ltd., Scotland  SHIMIZU CORPORATION, JAPAN
 Environment Resource Management (ERM), United  Sinclair Knight Merz Pty. Ltd., Australia
Kingdom  SMEC INTERNATIONAL PTY LTD, Australia
 Environmental Services, Australia  SNC Lavalin Int. Inc., Canada
 Environmental Technologic Consultant Co., Ltd., Japan  SOFRECO, France
 Epos Health Consultants GMBH, Germany  SOGREAH CONSULTANTS, France
 Ernest & Young, India  Span Consultants Pvt. Ltd., India
 ESSEM CONSULTANTS, India  Stanley Consultants Inc., USA
 EVS Environment Consultants Ltd., Canada  STATKRAFT GRONER AS, NORWAY
 Nippon Koei Co. Ltd., Japan  Trident Techlabs Pvt. Ltd., India
 NJS Consultants Co. Ltd., Japan  TAMS Consultants Inc, USA
 NOVATEC CONSULTANTS INC., Canada  Tata Consultancy Services (TCS),
 OPERATIONS RESEARCH GROUP (ORG), India  Thames Water, UK
 Pacific Consultants International, Japan  The ARA Consulting Group Inc., Canada
 Plancenter LTD., UNITED STATES  The Arvind Mills Ltd, India
 PADECO Co. Ltd.  The Louis Berger Group, USA
 Posford Duvivier, United Kingdom, U.K  The Royal Tropical Institute, The Netherlands
 Poyry GKW, Germany  The S.M. Group International Inc., Canada
 PriceWaterhouseCoopers  UBI Consulting, Uzbekistan
 PROWA BLACK & VEATCH GMBH, Germany  ULG Northumbrian Ltd., U.K
 Ramboll, Hannemann and Hojlund A/S, Denmark  UNITED STATES, U.S.A
 RESEARCH TRIANGLE INSTITUTE, USA  URBAS, Swiss Consortium
 RESOURCE FUTURES INTERNATIONAL, Canada  VKI, The Netherlands, Netherlands
 Rhein Ruhr Ingenieur- Gessellschaft  W.S. Atkins Ltd., UK, U.K
 SMART Engineering Team, Ltd. (SET), Afghanistan  WAPCOS, India
 S.D.C CONSULTING CO., LTD, Cambodia  Water &Power Consultancy Services Limited, India
 SAI Consulting Engineers Pvt. Ltd., India  WESTON, USA
 Scott Wilson Kirkpatrick & Co Ltd. U.K  Winrock International Institute for Agricultural
 SEATEC Group, Development, USA
 SENES Consultants Limited, Canada  World Aquaculture, France
 SETEC Engineering GMBH & Co., KG,  WS Atkins Ltd., UK
 Shah Consult International (P.) Ltd., Nepal WSP INTERNATIONAL
 Shah Technical Consultants Private Limited, India
 Sheladia Associates & Consultants (India) Pvt. Ltd.,
India

Registration with International Funding


Agencies & Professional Organisations
BETS is a registered with the following National and International Funding Agencies:
 The World Bank (32355)
 Asian Development Bank (000464)
 Islamic Development Bank (B 310)
 United Nations Global Marketplace (UNGM) (518781)
 Federation of Consultants from Islamic Countries (FCIC) – Registration No. 612)
 The Dhaka Chamber of Commerce & Industry (DCCI) (3379),
 Bangladesh Association of Consulting Engineers (BACE) (02/05, 02/04/05)
 Bangladesh Association of Software and Information Services (BASIS) (G-027)
 Department of Environment (DOE), Bangladesh
 Bangladesh Survey Organization
 Economic Relations Division (ED), Bangladesh (Enlisted No. 84023)

12
Experience Profile
INTERNATIONAL PROJECTS
Construction and Equipping of Schools Project in Tajikistan; Loan No. 8/595
Saudi Fund for Development Kingdom of Saudi Arabia

School no. 61 at Village Vose School no. 51 at Village Mehnatobod School no. 15 at village Khurramzamin
of Vose District of Vose District of Farkhor District

School No. 14 in Centre of School No. 57 at village Zulmobod of School No. 04 at village Tutkavul
Mir Said Ali Hamadoni District Yavan District of Nurek City

School No. 16 at village Rohi-Nav School No. 09 at village Sangtuda School No. 23 at Jamoat Zarbdor
Of Dusti District of Dangara District at Kulob District

School No. 01 in the Centre School at Bahor village School No. 08 at Khurramzamin Ismail S
of Shamsuddin Shohin District of N Hisrav District of Dangara District

School No. 14 at village Komsomol School No. 61 at village Mogiyon School No. 32 at village Kurut
of Bokhtar District of Penjikent City of Ayni District

13
Construction of Social Infrastructure Secondary School Reconstruction School at Archa in Farkhor district under
Facilities of IDPS in Azerbaijan Project, Tajikistan Construction & Equipping Number of
Secondary Schools Project, Tajikistan

Dangara Valley Irrigation Project, Tajikistan Irrigation Rehabilitation Project, Tajikistan

Andkhoy-Aquina (34 km) Road, Doshi-Pol E Khomri (51 km) Construction of Road between Jabul
Road, Jabul Saraj – Sourbi (50 km) Road, Fayzabad – Mini Hydro Power Plants in Rural
Eshkashim (43 Km) Road, Baharak – Eshkashim Road Saraj – Sourbi (51 km) Areas, Tajikistan
(114KM) Road Project, Afghanistan

CAREC Transport Corridor I Buna Bridge (Multispan Bridge) National Testing Center,
Investment Program, Kazakhstan Albania Dushanbe, Tajikistan

14
MAJOR OVERSEAS PROJECTS
Sl. Funding
Country Project Client / Executing Agency Period
No. Agency

TAJIKISTAN
1) Construction and Equipping Number of Project Implementation Unit Saudi Fund for
Secondary Schools Project, Phese-IV (PIU), Ministry of Education and Development 2018-2021
(SFD Financing, Loan No. 10/695) Science, Republic of Tajikistan (SFD)

2) Construction and Equipment For PIU, Ministry of Education and


Schools Project, Phase-III, Tajikistan Science, Republic of Tajikistan SFD 2015-2017
(SFD Financing, Loan No. 5/481)

3) Construction and Equipment For PIU, Ministry of Education and


Schools Project, Phase- II, Tajikistan Science, Republic of Tajikistan SFD 2009-2014

4) Construction and Equipment For PIU, Ministry of Education and


Schools Project, Phase-I, Tajikistan Science, Republic of Tajikistan SFD 2007-2009

5) TAJ Water Resources Management in


Agency for Land Reclamation
Pyanj River Basin-5 Project
and Irrigation (ALRI) of the ADB 2017-2021
Implementation and Monitoring
Republic of Tajikistan
Consulting Services for ALRI
6) Kurgan-Tyube Solid Waste - Project
SUE Khojagii Manziliyu
Implementation Support, Engineering
Kommunali in Kurgan-Tyube EBRD 2015-2018
Design Services and Contract
City, Tajikistan
Supervision, Tajikistan
7) Technical Support for Development of
Feasibility Report for Flood Controlling State Institute Project
Measures on Flood Channel Tebalaisai Management Unit Ferghana
IDA 2015-2016
Above the City of Kulyab for its Valley Water Resources
Protection (Contract No. PAMPII-QCBS- Management Project, Tajikistan
001), Tajikistan
8) Grant 0352-TAJ: Building Climate
Resilience in the Pyanj River Basin
Asian
Implementation Support to State unitary State Unitary Enterprise
Development 2015-2018
enterprise for housing and communal "Khojagii Manzilii Kommunali"
Bank (ADB)
services (KMK), Rural Water Supply
Tajikistan
9) Additional Financing for Municipal
AF MIDP, Tajikistan
Infrastructure Development Project (AF IDA 2013-2015
MIDP
10) Development of a comprehensive
framework for the introduction of River
State Institution Project
Basin Management to Tajikistan and
Management Unit Ferghana Valley European
Support to Local Authorities in the 2011
Water Resources Management Community
Project Area, Responsible for the
Project, Tajikistan
Operation and Management of
Irrigation and Drainage Schemes
11) Design and Detailed Engineering for
Ministry of Education, Republic of
the National Testing Center in IDA 2011-2013
Tajikistan
Dushanbe
12) Executive Body of the State EBRD
Dushanbe Solid Waste Management (European Bank for
Power of the City of Dushanbe, 2010-2014
Project Reconstruction &
Tajikistan Development)

13) Consultancy services on Strengthening Tax Committee


Human Capital and Institutional The Government of the Republic IDA 2009
Capacity of Tax Committee of Tajikistan
14) Khatlon Province Flood Risk Ministry of Water Resources and
Management Project [ADB LOAN NO. Land Reclamation (MWRLR), ADB 2008-2012
40046] Tajikistan
15) Consultancy Services for Management,
Ministry of Water Resources and
Design, Monitoring and Supervision of
Land Reclamation (MWRLR), ADB 2006-2012
Irrigation Rehabilitation Project
Tajikistan
ADB LOAN NO. 2124-TAJ (SF)

15
Sl. Funding
Country Project Client / Executing Agency Period
No. Agency
16) Design of Works and Installations for
Rehabilitation of Irrigation and Drainage
Project Management Unit
Systems and Strengthening of Reservoir IDA 2008-2009
(PMU), FVWRMP , Tajikistan
Embankments under Ferghana Valley
Water Resources Management Project
17) Consultancy Services for Developing a
Comprehensive Bankable Document, Ministry of Water Management
Detailed Engineering Design and & Amelioration, Republic of IDB 1999-2000
Tender Documents for the Dangara Tajikistan
Valley Project
18) Training Program on “Micro Credit” for PMU, Farm Privatization Support
WB 2005
Tajik Participants Project, Tajikistan
19) Detailed Design, Bidding Documents Dushanbe Water Supply PMU, IDB 2007-2010
and Supervision of Works under Dushanbe, Tajikistan
Dushanbe Water Supply Project
20) Water Distribution System Leak
PMU, Municipal Infrastructure
Detection Program under Municipal WB 2007-2009
Development Project, Tajikistan
Infrastructure Development Project
21) Preparation of Service Delivery
PMU, Municipal Infrastructure
Development Program and WB 2007-2009
Development Project, Tajikistan
Management Improvement Program
22) Construction of Mini Hydro Power
Ministry of Energy, Tajikistan IDB 2005-2007
Plants in Rural Areas of Tajikistan

23) Foreign Investment and


“Assistance in Formulating Courses
International Financial Institutions
Based on Banking Services” under IDB 2005-2006
Department, National Bank of
Capacity Building Technical Assistance
Tajikistan (NBT) , Tajikistan
24) Consultancy Services for Completion
of Construction and Provision of Ministry of Education, Republic 2004-2006
SFD
Equipment for Three Secondary of Tajikistan
Schools in Tajikistan
25) Institutional and Policy Support to the
Transport Sector, Tajikistan Ministry of Transport, Republic
ADB 2004
of Tajikistan

26) Reconstruction and Completion of


Comprehensive Secondary Schools Ministry of Education, Republic
IDB 2000-2003
Project of Tajikistan

27) TA 3601-TAJ Introduction of


Barki Tojik (Tajik Electricity
International Accounting Standards at ADB 2001-2002
Board), Republic of Tajikistan
Barki Tojik
28) Strengthening Embankment along Ministry of Water Resources &
Oct - Nov
Pyanj River under Irrigation Land Reclamation (MWRLR), ADB
2006
Rehabilitation Project Tajikistan
29) ADB Loan No. 2053-TAJ (SF):
Ministry of Education, Republic
Education Sector Reform Project ADB 2006-2009
of Tajikistan

30) Dushanbe-Kyrgyz Border Road


Ministry of Transport, Republic
Rehabilitation Project (Phase-II) ADB 2005
of Tajikistan

31) Ministry of Water Management


Construction Supervision of Dangara
& Amelioration, Republic of IDB 2002-2005
Valley Irrigation Project (Phase-1)
Tajikistan

AFGANISTAN
32) TA-9396 AFG: Second Support for
Infrastructure Investments and Policy -
ADB ADB 2020
Social Safeguard Capacity Development
Expert (51173-001)
33) Conducting Feasibility Study of the
Khush Tepa Irrigation Scheme and AECOM USAID 2018-2019
Power Generation (KTISPG) in Kunduz

16
Sl. Funding
Country Project Client / Executing Agency Period
No. Agency
Balkh and Jawazjan Provinces of
Afghanistan for Projects in Support of
USAID/AECOM's SWIM Project Activities
34) Conducting the Component-I of the
Khush Tepa Irrigation Project
Feasibility-II in Kunduz, Balkh and
Jawazjan Provinces of Afghanistan for DT Global/ MAIL USAID 2020-2021
Projects in Support of USAID/DT
Global's SWIM Project Activities
(Sub-consultancy)
35) Dahla Dam Project ("Arghandab
Ministry of Energy and Water
Irrigation Rehabilitation Project") in CIDA 2009-12
(MEW), Afghanistan
Afghanistan (Sub-consultancy)
36) Afghanistan Reconstruction and
Detailed Survey and Design of Small
Development Services (ARDS) Govt. of Sep 2010-
and Medium Dams and Related
under Ministry of Energy & Water, Afghanistan Apr 2011
Structures (Sub-consultancy)
Afghanistan
37) Ministry of Urban Development Affairs Sub-Contractor Agreement for
(MUDA) and Afghan Urban Water Northern Provinces Afghanistan Govt. of
2010-12
Supply & Sewerage Corporation Urban Water Supply Programme Afghanistan
(AUWSSC) II, Afghanistan
38) Construction Supervision of Fayzabad- Ministry of Public Works, Govt. of
2012-14
Behrak Road Project Afghanistan Afghanistan
39) Supervision Consultancy for
ARDS under Ministry of Public Oct 2010-
Construction of Road between Jabul ABD
Works, Afghanistan Sep 2016
Saraj – Sourbi (50 KM) [Jabul – Nijrab]
40) Capacity Building to Ministry of Public
Works - Transport Network Ministry of Public Works, Jan 2014-
ADB
Development Investment Program, Afghanistan Jan 2015
Tranche 1
41) Golbahar Storage Dam Project, Social
Ministry of Energy and Water
Survey, Environmental Assessment and MEW 2008-09
(MEW), Afghanistan
Economic Feasibility Study
42) Farah Rud Irrigation and Hydropower Ministry of Energy and Water, Govt. of
2006-07
Project Afghanistan Afghanistan

43) Feasibility Study of Kelagai Storage


Ministry of Energy & Water, Govt. of
Dam Project’ 2007-08
Afghanistan Afghanistan

44) Feasibility Study for Small and Medium


Ministry of Energy & Water, Govt. of
Dams Project 2006-08
Afghanistan Afghanistan

45) Extension of the Water Supply System Ministry of Urban Development


KfW-Entwick-
of Kabul (Water Supply Kabul-II), and Housing (MUDH) of the 2005-10
lungsbank
Afghanistan Government of Afghanistan
46) Re-establishment & Operation of Water
Afghan Association Coordination
Supply and Sanitation Services in IDA 2003-11
Unit (AACA) , Afghanistan
Selected Provincial Towns
47) Detailed Engineering Design,
Procurement Assistance, Project The Ministry of Public Works
Management and Construction (MPW) of Islamic Republic of IDB 2007-2013
Supervision Consultancy Services of Afghanistan
Andkhoy-Aquina Road, Con-II
48) Consultancy Services for Detailed The Ministry of Public Works IDB 2007-2009
Engineering Design, Procurement (MPW) of Islamic Republic of
Assistance, Project Management and Afghanistan
Construction Supervision of Doshi-Pol E
Khomri Road, Con-I

17
Sl. Funding
Country Project Client / Executing Agency Period
No. Agency

UZBEKISTAN
49) Construction of Modern Rural Houses
(Phase 1) Technical Review of the
Constructed Houses and Associated
Infrastructures (access and internal
“Qishloq Qurilish Invest” LLC IDB 2017
roads, access and internal water supply
system) in Samarkand, Tashkent and
Fergana Regions Istisn’a Agreement
(UZB-0075), Uzbekistan
50) Project Preparatory Consultant for the
Sustainable Hydropower Project (Sub- ADB ADB 2017-2018
consultancy), Uzbekistan

AZERBAIJAN
51) TA-9945 AZE: Preparing Irrigation and
Drainage System Development in Asian Development Bank (ADB)
ADB 2020-2021
Nakhchivan Autonomous Republic –
Consulting Firm
52) Accurate Engineering Surveying,
Designing, Supervision and Monitoring Social Fund for Development of
under the Project “Construction of IDPs (SFDI), Azerbaijan IDB 2006-09
Social Infrastructure Facilities for IDPs
in Azerbaijan”

VIETNAM
53) Vietnam Dam Rehabilitation and
DRSIP, Ministry of Agriculture
Safety Improvement Project (DRSIP) -
and Rural Development, IDA 2019-2022
Project Implementation Consultant
Vietnam
(PIC)
54) Emergency Rehabilitation of Calamity
The government of Socialist
Damage Project Vietnam ADB 2009
Republic of Vietnam
(Sub-consultancy)
55) ADB TA 6478-REG: Preparing the
Second Northern GMS Transport
ADB/DCI, Vietnam ADB 2009
Network Improvement Project
(Sub-consultancy)

NEPAL
56) Melamchi Water Supply Project -
Design and Construction Supervision
Government of
Consulting Services during Melamchi Water Supply Board 2015-2017
Nepal
Construction for Headworks and
Melamchi Diversion Tunnel, Nepal

PAPUA NEW GUINEA


57) Consulting Services for Construction Asian
Korea Engineering Consultants
Supervision Lae Tidal Basin Project, Development 2012-14
Corp. (KECC), Korea Bank (ADB)
Phase-I , Papua New Guinea

TANZANIA
58) Provision of Construction Supervision
Consultancy Services for Urban
Infrastructure Development in Mbeya
City under The Tanzania Strategic International
City Director, Mbeya City
Development 2011-14
Cities Project (TSCP) Council, Mbeya, Tanzania Association (IDA)

18
Sl. Funding
Country Project Client / Executing Agency Period
No. Agency

GEORGIA
59) Construction Management and Supervision
Services for Rehabilitation Works for IDP
Housing for Six (6) Former Hospital Municipal Development
USAID 2014
Buildings and Partial Rehabilitation Works Fund (MDF) of Georgia
for Twenty two (22) Collective Centers for
IDP Durable Housing

KAZAKHSTAN
60) CAREC Transport Corridor I (Taraz- Committee for Roads, Ministry
Korday Section) Investment Program; Dec 2009
of Transport and ADB
CSP-1 Project Management Consultant May 2013
Communications, Kazakhstan

YEMEN
61) Consultancy Services for Major Works
in Wadi Ahwar under 'Irrigation Ministry of Agriculture and
Improvement Project' (Sub- IDA 2008
Irrigation, Yemen
consultancy)

SOMALILAND
62) Private Sector Development
Reengagement Phase II, Consulting Hargeisa Municipality, Republic
World Bank 2012-13
Services Solid Waste Management, of Somaliland
Somaliland

PAKISTAN
63) Feasibility Study of Turkmenistan-
Afghanistan-Pakistan Natural Gas Govt. of Pakistan ADB 2004
Pipeline Project II, ADB TA-6153-REG

ALBANIA
64) Structural Configuration of Buna Bridge
General Roads Directorate,
and Cost Comparison Between Early
Ministry of Transport and
Designed Multispan Bridge and IDB 2005-06
Telecommunications, Tirana,
Proposed New Bridge Schemes with
Republic of Albania
Movable Span in Albania

CAMBODIA
65) A diagnostic assessment of the
Cambodian Payment and Settlement
System, and the project to upgrade
Information Technology in the National National Bank of Cambodia ADB 2007
Bank of Cambodia (TA 4835-CAM:
Preparing the Financial Sector
Development Program)

SUDAN
66) Consultant Services for Design & Institutional Capacity Building
Supervision of Emergency Water Supply for Improvement Access to
AfDB 2018-2021
Rehabilitation Works & Construction of Water & Sanitation in Port
Septage Treatment Plant Sudan (ICBIAWS/PS)

19
MAJOR LOCAL PROJECTS

Water Supply, Sanitation, Sewerage & Drainag e


Millions of people have safe water as a result of BETS water supply & sanitation
projects. BETS has carried out more than 125
water supply & sanitation projects PROMINENT PROJECT
 Wastewater Management Facilities for Gazipur City Corporation
 Technical Audit (Technical, Fiduciary & Safeguard) Consultant of SupRB,
LGED
 Technical Support Unit & Related Services under Bangladesh Municipal
Water Supply and Sanitation Project (30 Pourashavas, Pac # S-14)
 Supervision and Technical Support of Cox's Bazar District's Ukhia and
Tecknaf Upazilla's Water Supply and Sanitation Activities' Emergency
Assistance Project, DPHE, Dhaka
 Groundwater Survey for the Data Collection Survey for Water Resource
of Southern Chattogram Region, Bangladesh
 Engineering Design & Construction Supervision of Establishment of
Sewerage System in Chattogram Metropolitan (Phase-1), CWASA
 Design & Supervision of Water Supply Systems & Environmental
Management in 32 Pourashavas, DPHE
 Installation of Surface Water Treatment Plant of Mongla Port Authority
 Reviewing of the Design, Construction Supervision of EPC/Turnkey
Contract & Contract Management for 500 MLD Capacity of Dasherkandi
Sewage Treatment Plant Project.
 Feasibility Study and Design for Improvement for Improved Latrine in
Extremely Hard to Reach Areas under National Sanitation Project
(Phase-III), DPHE
 Khulna Water Supply Project of KWASA funded by ADB
 Technical Assistance & Supervision of 40 Pourashavas & Growth Centre
Water Supply & Environmental Sanitation Project (Phase-II)
 Design, Construction Supervision and Related Services, KWSP2
 Business Case & Transaction Implementation for the Centralized Effluent
Treatment Plant for the Mirsarai-2A Economic Zone
 Establishing Water Safety Plan (WSP) in Water Supplies of Sylhet City
Corporation.
 BRAC WASH Low Cost Sanitation under WASTE
 Feasibility Study, Design and Construction Supervision of Modunaghat
Water Treatment Plant and related Transmission Pumping Facilities
EXPERTISE  Installation of Surface Water Treatment Plant at CPA Premises,
Chittagong Port Authority
 Design and Supervision Consultancy Services for Khulna Water Supply
Water Supply and Sanitation is one of the sectors where BETS Project (ADB Component)
has proven capability and expertise. It is uniquely qualified in  Consultancy Services for 37 District Towns Water Supply Project of
providing large scale water supply and sanitation services. The DPHE
 Strengthening Resilience of Urban Water, Drainage and Sanitation
firm has provided services on feasibility studies, management Sector to Climate Change in Coastal Towns
and operational support, detailed design, system evaluations,  Preparation of Design & Estimation of Sewerage & Storm Water Network
of Jahurul Islam City (Aftabnagar)
strategy study, policy formulation etc., in water supply, water  TA & Supervision of the IDB Assisted Water Supply & Sanitation Project
treatment, sewage management, pollution control, urban and in Cyclone Prone Coastal Areas of Bangladesh of DPHE
rural sanitation, water conveyance, pumping and water  Detail Design & Construction Supervision for Development of Water
Supply System in Khulna City under KWASA
distribution fields including institutional and human resources  Water Supply System Expansion and Rehabilitation of Narayangonj
development. BETS has specific capability in leak detection, Town
waste prevention, unaccounted for water management and  Design and Management Consultancy (DMC) of Dhaka Water Supply
Sector Development Project
improved sanitation. The tally is high by any standard: over 125  Saidabad Water Treatment Plant Project Phase II
success stories in water supply, sewerage and sanitation  Karnafuli Water Supply Project funded by JBIC
 Sylhet-Barisal Water Supply & Sanitation Project of DPHE
projects.  Conducting Detailed Engineering Design and Construction Supervision of
Water Supply and Environmental Sanitation Project in Mongla
CONSULTING SERVICES Pourashava, Mongla, Bagerhat
 Review and Revisions of the Sector Development Programme (SDP) for
the Water and Sanitation Sub-sector in Bangladesh, PSU, Local
Planning Government Division
 Master Plan, Feasibility Study  Dhaka Integrated Environment & Water Resources Management Project
 Water Resource Development (DIEWRMP), DWASA
 Leakage/UFW (Uncounted for water) Control  Formulation of National Guidelines on Water Safety Framework (WSF) in
Bangladesh, DPHE
 Water Quality Control  Feasibility Study for Khulna Water Supply Improvement Project in the
 Pollution Control People's Republic of Bangladesh, NJS
 Strategy Study  Mohara & Kalurghat WTP Rehabilitation of CWASA
 Policy Formulation  Pourashava & Thana Water Supply and Sanitation Project of DPHE
 Dhaka Water Supply Project
 The Project for Advancing NRW Reduction Initiative of Chittagong WASA
Facilities Design & Construction Management funded by JICA
 Intake System  Feasibility Study and Preparation of Project Proposal on Rural Piped
 Treatment Process Water Supply Scheme
 Transmission and Distribution System  Sample Survey for Region-Wise Drinking Water Supply Coverage
 Removal of Water Logging in Dhaka City
 Automated System
 18 District Town Water Supply & Sanitation Project
 Hydraulic/Surge Analysis  Improved Sanitation Services Project
 Project Management / Construction Supervision  Leak Detection and Waste Prevention Program
 Testing & Commissioning  Feasibility Study of Banderban Pourashava Water Supply Municipal
Services Project

20
Water Resources Management / Development
BETS has improved sustainable water resources management for last 42 years
and has carried out more than 110 water resources management & development
projects PROMINENT PROJECT
 Char Development and Settlement Project Bridging
 Detail Designs (DD) of Subprojects under SSSWRDP
 Small Scale Water Resources Development Project
(Phase-2), LGED, JICA funded
 Inland Waterway Dredging Feasibility Study Bangladesh
Trade and Transport Facilitation Studies RETF Project
 Irrigation Management Operator (IMO) for Muhuri Irrigation
Project (MIP), BWDB
 The Inventory Survey of Hydraulic Structures of Water
Resources Development along the Manu River in
Moulvibazar O&M Division, BWDB
 Management, Design & Supervision and Other Related
Services for Haor Flood Management and Livelihood
Improvement Project, BWDB (JICA funded)
 JICA Project for Capacity Development of Management for
Sustainable Water Related Infrastructure in The People's
Republic of Bangladesh
 Integrated Planning for Sustainable Water Management
(IPSWAM) - Blue Gold Program
 Field Survey, Investigation and Feasibility Study (FISIS) of
5 (five) Nos. Rubber Dam
 Preparatory Survey on Upper Meghna River Basin
Watershed Management Improvement Project
 Innovations for More Food with Less Water - Task 2:
Country and Project-Specific Recommendations and Pilot
Initiatives (4572-001) -(Sub-consultancy Agreement with
Lahmeyer International)
 JICA Data Collection Survey on Water Resources
Management in Haor Area of Bangladesh, JICA
 ADB TA-8074 REG: Applying Remote Sensing Technology
in River Basin Management
 Data Collection under the Project "Support to JICA Study
Team for Water Resources Development Poject in Meghna
EXPERTISE Basin"
 Feasibility Study for Capacity-Building Project for
BETS is a leading firm in Bangladesh in Water Resources Sustainable Development of Water-Related Infrastructure
Development/ Management. This sector has assembled expertise over Part-2 & Part-3
 Feasibility Study of Capital Dredging and Sustainable River
a wide spectrum of disciplines starting from topographic/cadastral Management in Bangladesh of BWDB;
surveys, geo-technical & geo-physical investigations, planning & design  Char Development and Settlement Project-IV (CDSP lV)
of irrigation, flood control & drainage systems and structures, dam funded by BWDB, LGED & DoF
 Investigation & Feasibility Study of Rubber Dam under
design and safety, barrages, weirs, siphons, super passages, spillways, Construction of Rubber Dams in Small & Medium Rivers
canals, lift irrigation and plumping stations, command area for Increasing of Food Production Project
 Feasibility Study for Sureswar Flood Control, Drainage &
development, evaluation and monitoring studies, cost-benefit studies, Irrigation Project (Main Consultant)
economic analysis, social costs & benefits, project management,  Feasibility Study for Integrated Water Management Project
of Gungiajuri Haor Area
contract administration, etc. of specific mention is its involvement in  Feasibility Study and Detailed Engineering for Ganges
the preparation of prestigious National Water Management Plan. BETS Barrage
 Flood Damage Rehabilitation -2007 Works Under WMIP
was involved in SSWRDP, CEIP, FSDD, CPP/FAP 20, 9B, 3, 24, 6, 21 &  Estuary Development Program (EDP)
22 Components of Flood Action Plan (FAP) Projects out of 26  Detail Engineering Design for Kurigram Irrigation Project
(North Unit) of BWDB
components undertaken by Bangladesh after the severe flood in 1988.  Inventory Survey Related to Water Resources
Development in Greater Mymensingh
CONSULTING SERVICES  Pre-feasibility Study for Drainage Improvement of Dhaka-
Narayangonj-Demra (DND) Irrigation Project
 Command Area Development Project-II
 Feasibility Study for Integrated Water Resources
Management of Chalan Beel Area including Halti
Planning Design and Management Development Project
  Char Development and Settlement Project
 Water Resources Development and River/Urban Drainage Facility
 National Water Management Plan
Management Planning Design  BWDB Systems Rehabilitation Project
 Design of Irrigation, Flood Control  Compartmentalization Pilot Project (CPP/FAP 20) – Ph-I
 River Basin Management Planning
& Drainage System  Small Scale Flood Control Drainage & Irrigation Project
 Irrigation, Flood Control and Drainage  Project Management /  Gorai River Restoration Project
System Planning Construction Supervision of Water  North-East Regional Water Management Project (FAP-6)
 Erosion/Sediment Control Planning  Bank Protection & River Training/AFPM Pilot Project (FAP
Resources Facilities 21/22)
 River Training & Urban Drainage Planning  Training Program for the River Survey Project FAP-24
 North Central Regional Study (FAP 3)
Modelling  Meghna River Bank Protection Short Term Study (FAP9B)
 Flood Damage Restoration Project
 Hydrologic, Hydraulic and  Feasibility Study, Detail Design and Construction
Water Quality Study Supervision of Shrimp and Aquaculture Component
 Feasibility Study, Detailed Design & Construction
 Mathematical Modelling Supervision of Fish-Pass and Fish-Friendly Structures-
 GIS Modelling Phase-II under Fourth Fisheries Project
 Feasibility Study of Baral Basin Development Project

21
Environmental Assessment & Management
BETS has successfully completed 83 environmental assessment & management projects
PROMINENT PROJECT
 IEE for Karnaphuli River Study Project under "Details Hydrologic
& Hydraulic Study in the Karnaphuli River", HR Wallingford,
Consultant of CPA
 Environmental Impact Assessment (EIA) & Resettlement Action
Plan (RAP) under JICA Preparatory Survey for the Matarbari
Port Development in Bangladesh
 Strategic Environmental Assessment (SEA) under JICA Data
Collection Survey on the Matarbari Port Development in
Bangladesh
 Conducting Environmental and Social Impact Assessment
(ESIA) of Kaliakoir High Tech Park, BTL
 Regulatory Review for Liquefied Natural Gas Floating Storage
and Regasification Unit and import terminal infrastructure,
Moheshkhali Island, Bangladesh
 Detailed Techno Feasibility Study and Conceptual Master
Planning at Payra Port (Einvironmental and Social Assessment)
 Consulting Services for Engagement of Environment Monitoring
Consultant for Investment Promotion and Financing Facility
(IPFF) Project, Bangladesh Bank
 Environmental Impact Assessment (EIA) and Abbreviated
Resettlement Action Plan (ARAP) Studies for Selected Gas
Transmission Pipeline Projects of GTCL under the Preparatory
Survey on the Natural Gas Efficiency Project
 Environmental Impact Assessment (EIA) for HILIP Project Areas
Compaising 28 Haor Upzilas of 5 Districts, LGED
 Environmental Management Plan (EMP) Study for 10 (Ten)
EXPERTISE Existing Plans of Sylhet Gas Fields Limited.
 Environmental Impact Assessment (EIA) in favour of Offshore
During the last 42 years, BETS has achieved extensive experience in LNG Floating Storage and Regasification Unit (FSRU) Terminal
permanently moored at Island / Finger Jetty Activities Project at
conducting Initial Environmental Examination (IEE), Environmental Maheshkhali area under Cox's Bazar District
Impact Assessment (EIA), Environmental Management Plan (EMP),  Environmental Impact Assessment (EIA) study along the
and Environmental Monitoring Services (EMS). BETS services cover a selected route of the proposed Gas transmission pipeline from
wide variety of environmental facets (water, air, waste, etc.). Jalalabad to Danua via Bibiyana
 EIA study along the selected route of the proposed Gas
BETS offers all types of environmental assessment & environmental transmission pipeline from Moheshkhali to Anowara
management including basic investigation to identify environmental  Agro-Environmental Impact Assessment (AEIA) and
problems, analysis of causes, elaborating solutions for monitoring and Determination of Water Logged Area of South of the Padma
improvement of the environment, and implementation services River (Faridpur, Rajbai and Gopalgonj Districts)
 Onshore Surveys (FEED & PMC for Installation of a SPM and
required in projects of different sectors. Services also cover Pipeline System) of Eastern Refinery Ltd.
institutional building and human resources development as important  Offshore & Onshore EIA studies for installation of a Single Point
components of environmental management. Mooring & Pipeline System of Eastern Refinery Ltd.
BETS strength is to achieve Sustainable Development with healthy  Conduct EIA Study for (a) 5000 BPD capacity Condensate
Fractionation Plant with Catalytic Reforming Unit and (b) 1500
social development that assures environmental protection and BPD capacity Catalytic Reforming Unit CRU at Rashidpur to
improvement. With BETS strong infrastructural development convert Petrol into Octane at Kamaichera, near Railway Station
expertise, professional knowledge in both environment and at Upazilla-Bahubol, District-Hobigonj, SGFL
development is harmonized to provide high-quality environmental  Environmental Impact Assessment of Sundalpur Gas/Oil
Exploration.
management services.  Environmental Monitoring Services of TBL at Bangora, Comilla.
 IEE, EIA and RP for construction of Bakhrabad-Siddhirgang
CONSULTING SERVICES High Pressure Natural Gas Transmission Pipeline including
installation of stations and other related facilities
General  Environmental Management Plan (EMP) Study for Drilling of
o Multi-sector environmental impact assessment Wells at Kailashtilla Gas Fields Well no 3 & 4
o Development of environmental monitoring system  Monitoring of Environmental and Social Performance of Lafarge
o Environmental Management Systems Surma Cement
Environmental Appraisal  Environmental Management Framework (Package DS-5)
o Initial Environmental Examination (IEE)  Conducting EIA for Gopalnagar to Bangora Gas Gathering
o Environmental Impact Assessment (EIA) Pipeline
 Bangladesh Environmental Technology, Verification-Support to
o Environmental Management Plan (EMP) Arsenic Mitigation (BETV-SAM) Project
o Environmental Monitoring Services (EMS)  Rendering Services for Data collection for the JBIC
o Resettlement Action Plan (RAP) Environmental Profile Study in the Republic of Bangladesh
Water Environmental Management  Environmental Impact Assessment (EIA) for Construction of Gas
o Water pollution control planning Distribution Network at Rajshahi City and its Adjoining Areas.
o Development of water quality monitoring program  IEE, EIA, RP report on West Bank of Jamuna Bridge- Nalka-
Atmospheric Environmental Management Hatikamrul- Bonpara- Ishwardi- Bheramara Gas Transmission
Pipeline Project and Bonpara-Rajshahi Gas Transmission
o Air pollution control planning Pipeline Project
Solid Waste Management  Conduct IEE and EIA of Central Effluent Treatment Plant
o Domestic, Industrial and Hazardous Waste (CETP) and other Industrial Installations in the Proposed
Ecosystem Management Tannery Estate, Dhaka
o Coastal and Marine Environmental Planning  EIA for Moulavi Bazar Development (Gas Field)
o Land use Zoning  IEE, EIA, SIA and Baseline Study (BLS) of Blocks 5 & 10
 Environment and Social Impact Assessment of Bangabandhu
o Forest Environmental Planning Bridge Approach Road Gas Pipeline Project
o Reforestation  EIA for Installation of a Gas Process Plant, Condensate
o Ecosystem Reforestation Fractionation Plant and Gas Pipeline Project at Fenchuganj Gas
Field
 EIA & SIA for Construction of Gas Pipeline and other
Installations under Dhaka Clean Fuel Project

22
Agriculture and Rural Development
BETS has carried out more than 30 Agricultural and Rural Development projects
PROMINENT PROJECT
 Consulting Services for Impact Assessment of
Integrated Agricultural Productivity Project (IAPP)
 Consultancy Services for Design, Management
and Supervision of the Enhancing Quality Seed
Supply Project, MoA through BADC
 National Agricultural Technology Project
(NATP):Phase-1, Concurrent Monitoring &
Evaluation
 Mid-Term Evaluation of the Agricultural Extension
Component, ASPS-II
 Assessment of Impact of Smallholder Livestock
Development Project (SLDP 2) in Five Southern
Districts, Bangladesh
 Technical Assistance under Market Infrastructure
Development Project in Charland Region
(MIDPCR)
 Preparation / Updating of Upazila Towns Master
Plan under Upazila Town Infrastructure
Development Project
 Expansion of Irrigation through Utilization of
Surface Water by Double Lifting (1st Phase)
 Evaluation of Participating NGO of Agriculture
Diversification and Intensification Project
EXPERTISE  Strengthening of Livestock Information Services
(SLIS), Mid Term Review Mission
BETS has developed agricultural projects for rural villages and also  JICA Study for Rural Development Focusing on
the wider spectrum covering both upstream improvement activities Flood Proofing (Survey on Agriculture and Water
(such as watershed conservation and management, reforestation) and use), 2001
downstream protection activities (such as flood control). BETS  Netrakona Integrated Agricultural Production and
integrates agriculture and rural development to help clients effectively Water Management Project (Component : On-farm
manage their natural resources and improve food production on a research)
sustainable basis, alleviate poverty and improve overall welfare of  A special study on Potentials and Constraints of
rural population. BETS is also involved in empowerment and training Oilseeds Production in Netrokona
of rural population through people participatory projects which aim to  Khulna - Jessore Drainage Rehabilitation Project
build and strengthen relationships between rural organizations and (Component : Agricultural Development)
the local and central government, establish shared understanding and  Conducting Survey for Collection of Field Level
encouraging stakeholders to participate in the planning of resource data for NOPOEST and LIFE Projects
development.  O&M Strengthening of the Second Bhola Irrigation
Project
BETS projects cover a wide range of disciplines including agriculture,
 A Study on the Impact of Polder Rehabilitation on
animal husbandry, forestry, irrigation & drainage, rural water supply, the NIAPWMP
agricultural training & education. BETS professionals have in-depth  Feasibility Study of the Second Bhola Irrigation
knowledge and wide experience in many areas including Agricultural Project
Engineering, Agronomy, Irrigation and Drainage, Soil Conservation and  Conducting Participatory Rural Appraisal (PRA) in
Improvement, On-farm development, Integrated Rural Development, Integrated Agriculture Development Project in
Agricultural Processing, Agro Forestry, Watershed Management, Greater Sylhet District Including Orange and
Environmental Conservation and Protection and Socio-economy. Pineapple Development

CONSULTING SERV ICES


Integrated Agricultural Development Institutional Strengthening
Infrastructure Development  Planning, financial management, training,
etc.
 Irrigation & drainage network, farm roads, etc.
 Rural water supply Forestry and Watershed
Sector Strengthening Management
 Reforestation of degraded lands, forest
 Food crops, fruits and vegetables, livestock,
management
fisheries, etc.
 Land development, watershed conservation
Food Production Improvement and management
 Seed storage, post harvest
Environmental Studies & EIA

23
Energy and Power
BETS has carried out more than 30 Energy and Power Sector Projects
PROMINENT PROJECT
 Hiring of Drill Stem Testing (DST) & Surface Testing
Services (Lot-1) and DST Services Supporting Spares
for (Lot-2) Zakiganj #1 Exploratory Well of Rupkalpa #2
Drilling Project of BAPEX under Cash Foreign
Exchange.
 Feasibility Study of 40MW Solar Power Plant in Kushtia,
SREDA
 Replacement of Existing Distribution System by
Underground Distribution Network System, DPDC
 Design, development & installation of multi-platform GIS
based application for the management of distribution
network of DESCO for technical, financial and
managerial benefits
 Consultancy Services for Preparation of a Master Plan
for the Rural Electrification (RE) Program in Bangladesh
for BREB
 GIS (Geographical Information System) Based
Distribution Network System and Preparation of a 20
Years Master Plan for DPDC
 Gas Market Assessment – Bangladesh, ICF
 ADB TA-8839 BAN: Study on Energy Security
 Execution Survey of Natural Condition for Preparatory
Survey on Chittagong Area Coal Fired Power Plant
Development Project under TEPSCO
EXPERTISE  Rehabilitation and Expansion of Existing Supervisory
Control and Data Acquisition (SCADA) System of
BETS is steadily consolidating its expertise in the energy and power National Gas Grid under GTCL (Component B of
sector and has already emerged as one of the well-known local Bheramara Combined Cycle Power Plant Development
Project)
consultancy firms. BETS has carried out feasibility study, design and  Installation of Natural Gas Compressor Stations at
supervision, environmental and social assessment of number of Ashuganj and Elenga
power and energy sector projects. BETS has completed Detailed  Drill Stem Testing-Group: A (drilling of one new well at
Feasibility Study & Environment Impact Assessment of Haripur Bakhrabad gas field). Group: A (Workover /
150MW CCPP Project of Bangladesh Power Development Board Recompletion of Two Nos. Existing Well at Bakhrabad
gas field)
(BPDB); Corporatization of Ashuganj Power Station Project of BPDB.  Drill Stem Testing & Production Testing Services for
BETS in association with Nippon Koei Co. Ltd. of Japan has Kailashtilla Gas Field Well # 5&6
completed the project of 230 KV Transmission Line and Substations  Construction of 230KV Transmission Lines and Sub-
under West Zone Power System Development Project of PGCB. stations under West Zone Power System Development
BETS in association with NEXANT has carried out the power sector Project
 Detailed Feasibility Study & Environment Impact
master plan of power Cell (GoB) under an ADB financed Project. At Assessment of Haripur 150MW CCPP Project
present BETS is involved in “a) Replacement of Existing Distribution  TA No. 4379-BAN: Power Sector Development Program
System by Underground Distribution Network System, DPDC; b) II
Design, development & installation of multi-platform GIS based  Study on the Present Power Supply Situation and its
application for the management of distribution network of DESCO Impacts on the Readymade Garment Sector financed
by GTZ
for technical, financial and managerial benefits. c) Preparation of a  Preparation/Development of Gas Sector Master Plan
Master Plan for the Rural Electrification (RE) Program in Bangladesh and Strategy for Bangladesh
for BREB d) GIS (Geographical Information System) Based  Improved Performance of Bangladesh’s Energy Sector
Distribution Network System and Preparation of a 20 Years Master (Individual Contract)
Plan for DPDC”.  Topographical and Bathymetric Surveys and
Geotechnical Investigations of the Project Site for 450
In the Gas Sector, BETS in association with Wood Mackenzie of MW Combined Cycle Power Plant at Sirajganj
UK has just completed Gas Sector Master Plan and Strategy 2025  Corporation of Ashuganj Power Station (ADB Technical
for Petrobangla under a World Bank-financed Project. Further, Assistance Project), Phase-I & II
 Improved Performance of Bangladesh Energy Sector
recently BETS has successfully completed the DST-1 & DST-2 of  Meter Reading & Other Operational Activities of Sales &
Kailashtila Well # 5 SGFL in association with Northstar Drillstem Distribution Division 1,2,3 under BPDB, Khulna
Testers Inc. Canada. BETS was involved in Fourth Natural Gas  Identification, Verification, Valuation & Recording of
Development Project, Safety and Efficiency Improvement Project Fixed Assets and Inventories (Stocks and Stores); and
in Bangladesh Gas Sector, Development of an Environment and Suggesting the modalities of making Regional
Accounting Office (RAO), Chittagong Electric Supply,
Safety Management System of Petrobangla. Agrabad & Sikalbaha Power Station, A Viable Profit
Centre under BPDB
Consultancy Services  Resettlement Action Plan (RAP) for Hasnabad-Amin
 Energy Planning Bazar (Savar)-Tongi (50 km) and Haripur-Meghnaghat
 Power transmission (10 km) 230 kV Transmission line project under Dhaka
Power System upgrade project.
 Power distribution  Fourth Natural Gas Development Project
 Gas Sector Development  Safety and Efficiency Improvement in Bangladesh Gas
 Illumination & building electrification Sector
 Tele-communication & telemetry systems  The Maddhapara Hard Rock Mining Project
 Environmental Impact Assessment  Drillstem Testing for drilling & Workover Wells of SGFL
 Infrastructure development
 Ventilation & air-conditioning
 Plumbing, fire fighting & Lifting
 Maintenance management

24
Economic & Socio-economic Studies
BETS has carried out more than 30 Projects in Economic and Social Studies, Human
Resources Development & Institutional Strengthening
PROMINENT PROJECT
 Consulting Services for Capacity Development of
LGIs and LGED under DIMAPPP (LGED/S-04)
 Consultancy Service for ‘Bangladesh: Options for
Institutional and Regulatory Reforms in the Electricity
Sector’
 Gender Action Plan Implementation Services (for
Solar Photovoltaic Pumping for Agricultural Irrigation)
 Grant-0584 BAN: Power System Efficiency
Improvement (Off-Grid Solar Photovoltaic Pumping
Systems Component) - Consulting Services for
Gender Action Plan Implementation Services (37113-
014) in Bangladesh, funded by ADB
 Consultancy Services for Carrying Out Feasibility
Study and Preliminary Design for Construction of
Dhaka Subway, BBA
 Mid-Term Outcome Survey including Result and
Impact Management System (RIMS) Study under
Coastal Climate Resilient Infrastructure Project
 Conducting Evaluation Study on the Completed
Project titled "Secondary Towns Integrated Flood
Protection (Phase-2)" Project-BWDB part, IMED, MoP
 Baseline Study for Impact Assessment of Small Scale
Water Resources Development Project in Greater
Mymensingh, Sylhet and Faridpur Areas of JICA
 Monitoring & Evaluation-Base Line Survey, Mid-term
Evaluation & End of Project Evaluation (S-9), Avian
Influenza Preparedness and Response Project
 Contract for the Conduct of participatory Rural
Appraisal (PRA) of Sub-Projects.
EXPERTISE  Baseline Survey of Urban Partnerships for Poverty
Reduction Project (UPPRP), UNDP
BETS has impressive record of experience in conducting  Impact Evaluation Study of "Financial Services for the
Poorest Project"
baseline surveys, agro-socio-economic surveys, community need  Assessment of Impact of Smallholder Livestock
assessment through PRA, planning, monitoring and evaluation of Development Project (SLDP 2) in Five Southern
Districts, Bangladesh
surveys and studies. BETS provides services in social  Support for Rural Livelihoods Programme in
development, economic development, affordability studies, Bangladesh
 Performance and Financial Audit Services (PFAS) on
socio-economic household survey, collation and analysis of Emergency Flood Damage Rehabilitation Project
socio-economic data, socio-economic status report, framing  Consulting Services for Assessment of Procurement
Management Capacity and Its Institutionalization
socio-economic models, institutional strengthening, healthcare  Research study on “The informal sector of
employment in Bangladesh, and how this sector could
education, human resources development, institutional building be mobilized to eliminate worst forms of child labour
and increase job opportunities”
CONSUL TING SERVICES  Consulting Services for Assessment of Procurement
Management Capacity and Its Institutionalization
and entrepreneurship.  Socio-economic Monitoring and Impact Evaluation of
Rural Electrification and Renewable Energy Program
 Baseline Survey in Bangladesh
 Second Small Scale Water Resources Development
 Socio-economic Survey, Data Collection Sector Project for Forming, Establishing functioning
 Socio-economic Studies WMCAs and Assist LCS Activities
 Conducting Survey for Collection of Field Level data
 Social Impact Assessment and Monitoring for NOPOEST and LIFE Projects
 Impact Evaluation Studies  Study on Multipurpose Cyclone Shelter Project in
Feni, Cox’s Bazar, Chittagong
 Focus Group Discussion  Consultancy Services to Conduct “Socio-economic
 Stakeholder Identification Baseline Survey” for the BUILD Component under the
 Monitoring and Evaluation Integrated Food Security Program (IFSP) of CARE-
Bangladesh
 Capacity Building  Baseline Survey /Participatory Rural Appraisal (PRA)/
 Institution Strengthening for Agricultural Development Support to Adivashi and
Char land Areas for SAIP of DAE
 Community Development  Social Impact Assessment of Block 15 (Sandwip) &
 Human Resources Development Stakeholder Identification of Block 5 & 10 (Bhola &
Sundarban)
 Tarail - Pachuria Flood Control, Drainage and
Irrigation Project, Phase-I
 The Third Rural Infrastructure Development Project
(Institutional Support)
 Khulna - Jessore Drainage Rehabilitation Project
(Beneficiary Participation)

25
Architecture and Building
Over the past 42 years, BETS has performed as Architectural Consultants in over 30
Projects
PROMINENT PROJECT
 Design and Engineering Services for the Renovation
(BMRE) of Ashuganj Wheat Silo, Ashuganj,
Bhahmanbaria (package SD-41) under Modern Food
Storage Facilities Project
 Supervision of Civil Works for the modernization of the
TTCs, SD-24 Phase II (Bangladesh & German
Technical Training Centre at Dhaka)
 Technical Evaluation of GIZ Office Premises
 Design, Supervision & Monitoring Consultancy for Field
Infrastructure under Climate Resilient Participatory
Afforestation and Reforestation Project of Bangladesh
Forest Department, Funded by WB
 Sustainable Urban Primary Health SDP II of ADB
 Design and Site Supervision Services for Fael Khair
School-Cum-Cyclone Shelters Program for the Victims
of the Cyclone SIDR funded by IDB
 Construction of a Concrete Grain Silo at Mongla Port
with Facilities (50,000 MT Capacity)
 Construction Supervision Consultants (CSC) Services
for Construction of Core Family Shelter Phase-II, UNDP
 Outline Design Study on the Project for Construction of
Multipurpose Cyclone Shelter in SIDR affected area
 Construction Supervision for DNCC Warehouse under
the Programme for Improvement of Solid Waste
Management in Dhaka City Toward Low Carbon
Society in the People's Republic of Bangladesh
EXPERTISE  Topographic Survey and Subsoil Investigation for
Construction of Multipurpose Cyclone Shelters in the
BETS distinguishes itself in the area of architectural design by its SIDR Affected Area
revitalization of vernacular architecture. This use of local cultural  Shopping, Commercial & Islamic Centre at Chawk
Bazar
designs that harmonize with the client’s heritage and environment
has performed the key role in bridging the elements of consulting  Preparation of Plan, designs, estimates, supervision
and soil testing of civil works at different places of
works: namely planning, engineering, and architecture. We also coastal area division
make full use of local materials to boost local pride and  Style Aspire, An Apartment Complex
participation in our projects and thus maximize project benefits at  Planning, Detail Design, Cost Estimating &
the most reasonable cost. Construction Supervision of BETS Centre
 Repair/renovation of Clinic building and construction of
Architectural Sector is the traditional stronghold of BETS, from the MO/FWV quarter at 18 MCWCs
age traditional design; our emphasis is now on art-of-the day  Supervision of Construction of Dholaikhal Pump Station
technology, having established the required facilities. BETS (Credit TA VI, 2393 BD)
provides consultancy services for planning & design of office  Feasibility Study and Preliminary Design of City View
Apartment cum Shopping Centre
buildings, public buildings, commercial & retail, institutional
 Assessment of Repair/Renovation of 8 Maternal and
complexes, industrial buildings, etc. Child Welfare Centres (MCWC)
 Preparation of Master Plan, Detail Design &
Construction Supervision of Telephone & Telegraph
Exchange Building
 Detail Design and Construction Supervision of Biman
Poultry Complex, Phase-I&II

26
Road / Bridge and Railways & Other Infrastructure
Development Projects
Infrastructure development is one of the major PROMINENT PROJECT
 Construction Supervision Consultant of Development of Kurigram
sectors, where BETS is consolidating its (Dasherhat) Nageshwari-Bhurungamari-Sonahat Land Port up to
National Highway Project, RHD
experience. During the past years BETS has  Project Readiness Services Towards Integrated Urban Development
(Sector) Project under Third Urban Governance and Infrastructure
Improvement (Sector) Project (UGIIP-III)
played a pivotal role in both rural & urban  Consultancy Services for Review of Pavement Bridge, Culvert Design
and Supervision of Construction works for widening the Barayerhat-
infrastructure development Heanko-Ramgarh Road under Chattogram Road Division
 Preparing a Comprehensive Feasibility Study Report of Proposed
Bangabandhu Sheikh Mujib Safari Park, DoF, Lathitila, Moulvibazar
 Export Competitiveness for Jobs Project - Market Prioritization,
Engineering Design and Supervision of Cluster Infrastructure (PIFIC)
 Feasibility Study and Conceptual Design of Proposed Bus Terminal and
Depot, DTCA
 Preparation of Tourism Master Plan of Bangladesh, Bangladesh
Tourism Board
 Widening of Approach Road and Development of Other Essential
Infrastructure of Bangabandhu Sheikh Mujib Safari Park, Gazipur (1st
Revised) Project, BFD
 Full time supervision, design review & as-build drawing preparation etc.
for Improvement of damaged Roads, Drainage, Footpath and Road
Safety of Different Zones under DNCC
 Transaction Advisory Services for Design and Supervision of works at
Mirsarai EZ, Bangabandhu Sheikh Mujib Shilpanagar under
Bangladesh Economic Zones Development Project (Phase-1), BEZA
 Feasibility Study of Ramgarh as Well as Detail Design of Ramgarh,
Bhomra and Benapole Land Ports project, BLPA
 ADB TA-9408 BAN: Updating the Road Master Plan
 Feasibility Study and Preliminary Design for Construction of Dhaka
Subway, Bangladesh - Transportation Surveys Management, BBA
 Engagement of Architects, Design Engineers and Support Staffs for
Designing and Design Review of Station & Buildings Package under
Padma Bridge Rail Link Project in Bangladesh, Bangladesh Railway
 Project Implementation Consultancy Services for SASEC Road
Connectivity Project II: Improvement of Elenga-Hatikamrul-Rangpur
Road to a 4-Lane Highway, RHD
EXPERTISE  Feasibility Study and Detail Design for Construction of Dhaka-
Chittagong via Comilla/Laksam High Speed Railway
BETS has been an integral part of infrastructure development  Consultancy Services for Carrying Out Feasibility Study and Preliminary
Design for Construction of Dhaka Subway, BBA
and significantly contributed to the advancement of  Pre-Feasibility Study of Bogra and Natore Economic Zone under BEZA
infrastructure development technologies in Bangladesh.  Management Design and Supervision (MDS) Consultancy Services
(Package No. UGIIP-III-AF/MDS/02)
Road/Bridge & Railways comprise a comprehensive system of  Detailed Feasibility Study for Construction of Common Utility Tunnel in
the Primary Roads of Dhaka South City Corporation Area (App. 6 Km)
facilities to fulfill the essential factors in the national and  The Logistic Condition Survey at Land Ports for The Data Collection
international traffic and trade patterns. Consultants of BETS Survey on Matarbari Port Development, JICA Project Team
 Preparing Information Technology Parks for Employment and
have undertaken the preparation of master plan, modelling, Innovation, ADB
designing, and assessment. BETS consultants have undertaken  Screening and Feasibility Study of Route Options Connecting
Chittagong, Bangladesh and NE Border Area, and Survey, Detail
projects in this sector, including organizational reform, Design of Road Connecting Thegamukh and Highway to Chittagong
 Preparation of Action Area Plan for Gazipur City Corporation
preparation of master plan, modelling, designing and  Preparing Urban Governance & Infrastructure Improvement of LGED
assessment. BETS also provides services on traffic management  Coordinating & Consulting Services for Planning and Design on Access
Road for Preparatory Survey on Chittagong Area Coal Fired Power
and engineering, transport planning, regional planning, railways Plant Development Project in Bangladesh
route location, facility design, etc.  TA 7840-BAN: Road Safety Improvement Project
 Preparation of Master Plan for Kishoreganj Paurashava Under District
Towns Infrastructure Development Project under LGED
CONSULTING SERVICES  Preparation of Municipal Development Programs (Western Part:
Rajshahi, Rangpur, Khulna and Barisal Divisions)
 Design and Construction  Transport System  Climate Resilient Infrastructure Improvement in Coastal Zone Project-
1", ADB
 Urban and Rural Roads Planning  FS for construction of Bridge at ferry location at (a) Labukhali-Dumki-
 Highways Bogra-Dashmina-Golachipa-Amragachi Road (Z8806) (b) Barishal -
 Urban road, rail, public Jhalokathi - Bhandaria-Pirojpur Road (R-870) over the river Kocha & (c)
 Bridges/Culverts transport planning Rahmatpur-Babuganj-Muladi-Hizlakok Road (Z8034)
 Hydraulic Structures  Traffic management planning  Development of the BRT and Corridor Restructuring Implementation
Study and Preliminary Design work for the Uttara - Mohakhali - Ramna
 Improvement & Rehabilitation  Railway - Sadarghat Corridor
 Dhaka bus network and regulatory reform implementation study and
 Operation and Management  Organizational Reform design work funded by World Bank
 Institutional Strengthening and  Preparation of Master Plan for Pourashavas under Upazila Towns
 Environmental Studies Infrastructure Development Project
Capacity Building  Traffic Count Survey (Haor Area), Funded by JICA
 Rail tariff regulation policy  Supervision of 7 Nos. of Bridge Construction Work of Purbachal New
Town Project, RAJUK
 JBIC Special Assistance for Project Implementation (SAPI) for Dhaka-
Chittagong Railway Development Project
 JBIC Special Assistance for Project Formation for Dhaka-Chittagong
Trunk Railway Transportation Capacity Enhancement Project
 Rehabilitation and Privatization of Eight Ferry Services in Patuakhali
and Barguna
 Organizational Reform of Bangladesh Railways (P-III), ADB
 Regional Traffic Enhancement Project, Bangladesh Railway, ADB
 Urban Governance and Infrastructure Improvement Project –
Governance Project Development (GDP) Component
 Supporting Urban Governance Reform, ADB
 The Third Rural Infrastructure Development Project
 Preparation of Master Plan for Monirampur Pourashava
 Preparation of Detailed Area Plan DND North & Airport-Demra bypass
Area, RAJUK

27
Information Technology
BETS information technologies and services have assisted many
clients in home and abroad to develop their IT infrastructure assets
PROMINENT PROJECT
 ICT Roadmap for the Power Sector in Bangladesh,
Power Cell

 Development of Food Grain Movement Manual,


Least Cost Route, Stock in Transit, Movement
Programming Software and Reviewing of Godown
and Transit Loss

 TA-7604 BAN: Supporting Governance


Management Project for Directorate of Land
Records and Surveys (DLRS) under ADB

 Digital Information System Project under


Bangladesh Bureau of Statistics

 Developing a National Management Information


System (MIS) for Water Supply and Sanitation in
Bangladesh under LGRD
 Management Information Acquisition under the
Project Solid Waste Management in Dhaka City

 Consulting Services on Preparation of Annual MIS


EXPERTISE
Report for 2000-01 & 2001-02 and Development of
IT as a management tool enables very efficient and effective Database for Textile Sub-sector from 1972-73 to
development, operation, maintenance, and monitoring of 2001-02
resources development, etc. BETS IT expertise enhances  Installation of Local Area Network (LAN) Facilities in
conventional development projects with most advanced high-tech Petrobangla Head Office
innovational elements. BETS analyses effectiveness of available  Computer Based Khatian & Map Printing System
tools in information management and recommends the client for Modernisation Project (Pilot-1)
customizing system and applications to uniquely address the  Computer Based Khatian & Map Printing System
issues. BETS has acquired and developed computer software and Modernization Project (Pilot-2)
built up library of technical programs developed in-house. The
 Digital Data Network of Bangladesh Telegraph &
same is being steadily expanded to cover different aspects in field Telephone Board (BTTB)
of water resources, sewerage and drainage, environmental
 Installation of NMIC Software at 55 district offices of
engineering, energy and power, telecommunication, GIS and
the DAE & Related Training
project management.
 Database Management System Software for
BETS expertise includes Strategy and Project Planning, IT Facility National Minor Irrigation Census (NMIC)
Development and System and Application Development. Whatever
the nature and magnitude of the development requirements, BETS
creates ways for IT development to be expandable, self-
sustainable and standardized.

28
CAD, GIS & MODELLING
Adaptation of new and latest emerging technologies has given GIS & CAD
Unit of BETS a distinct edge over others
PROMINENT PROJECT
 GIS Based Property and Infrastructure
Asset Management Systems (GIS-PIAMS)
Consultancy Services under MGSP (S-06)
 Development of Web Based GIS
Application System for Land Use Map of
Chittagong Metropolitan Master Plan Area
 Management Information Acquisition under
the Project Solid Waste Management in
Dhaka City
 Consulting Services on Preparation of
Annual MIS Report for 2000-01 & 2001-02
and Development of Database for Textile
Sub-sector from 1972-73 to 2001-02
 Installation of Local Area Network (LAN)
Facilities in Petrobangla Head Office
 Computer Based Digital Mapping and
Khatian Printing System (Pilot-1) and
EXPERTISE Hardware Maintenance Project
 Database Management System Software
GIS & CAD Unit of BETS has always explored new opportunities to for National Minor Irrigation Census (NMIC)
enhance the quality and quantity of services to wider customer base  Preparation of GIS Based Ecological Maps
with diverse technological needs.  Establishment of X, Y, Z Coordinates in
The technology perfected is also available for export. Technical Companyganj Area, Comilla
challenges overcome in complicated projects have enthused confidence  Installation of NMIC Software at 55 district
in the company to see and take up international assignments on a firm offices of the DAE & Related Training
foundation. Modern tools, such as Computer Aided Design (CAD),  Preparation of Point Elevation Digital
Geographic Information System and Computer Modeling & Simulations Coverage Maps for Cyclone Shelter
are used with traditional ease to the satisfaction of clients. BETS Preparatory Study
maintains a fully equipped GIS facility. BETS has also developed special
expertise in application of CAD, GIS hand Modeling and has completed number of projects in these fields.
Digital Theodolite, Electronic Distance Measuring Machines (EDM), Total Stations, Differential Global
Positioning System (DGPS) etc., are utilized by GIS, RS & CAD Unit of BETS to provide data collection for
survey data and soil exploration services by a team of expert surveyors and Engineers.
GIS & CAD Unit of BETS has always explored new opportunities to enhance the quality and quantity of
services to wider customer base with diverse technological needs. The technology perfected is also
available for export. Technical challenges overcome in complicated projects have enthused confidence in
the company to see and take up international assignments on a firm foundation.

29
Training and Education
Trainings and transfer of technology has become one of the integral project components for
most of the projects undertaken by BETS. BETS education services covers curriculum
development, information technology support, policy formulation and planning of education
system

EXPERTISE

Over time BETS has established a sound track record in the design and implementation of training
programs with particular focus on development of technical expertise geared towards Continuing
Professional Development (CPD), Institutional Capacity Building and Human Resources Development
(HRD). The major objectives of the training are to raise professional knowledge, skill and improve the
competencies of personnel working in industrial, commercial and service organizations in the public and
private sectors; to promote effective transfer of technology through dissemination and exchange of
technical knowledge with support from international institutions and organizations; to connect via Internet
to worldwide resource centres; to organize and facilitate local and international seminars and conferences
for creating awareness among the participants on contemporary issues; to initiate research to find out
cost effective solutions to the problems affecting the society in order to ease the suffering of the common
men and adopt appropriate technology for innovations contributing to better life and living conditions of
the people; to undertake publications for disseminating knowledge and creating awareness among the
readers for promoting human resources development, social upliftment and management improvement.
BETS is steadily consolidating its expertise in education and human resource development and has already
emerged as one of the well-known local consultancy firms.

CONSULTING SERVICES
Training:
 Community Development Education:
 Health and Population  Demand forecast on students and estimation of
 Environmental Management Training appropriate capacity
 Computer Systems and Data Processing  Design, construction supervision, equipment
 Institution Building and strengthening installation and maintenance
 Infrastructure Development  Development of curriculum if universities and
 Management and Development Administration institutions
 Flood Control, Drainage and Irrigation  Software and hardware support services
 Irrigation and Water Management  Introduction of IT into educational tools and
 Water Supply and Sewerage facilities
 Social Services and NGO Activities
 Women and Youth Development
 Community Development
 Public Health and Sanitation
 Rural and Agricultural Development
 Technology Transfer, Product Development and Marketing

30
Major Projects
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
WATER SUPPLY AND SANITATION
1. Tajikistan State Unitary Enterprise Grant 0352-TAJ: Building Climate 2015-2018 Asian
"Khojagii Manzilii Resilience in the Pyanj River Basin Development
Kommunali" Implementation Support to State unitary Bank (ADB)
enterprise for housing and communal
services (KMK), Rural Water Supply
2. Tajikistan Executive Body of the Dushanbe Solid Waste Management 2010-2014 EBRD (European
State Power of the City Project Bank for Reconstruc-
of Dushanbe tion & Development)
3. Tajikistan SUE Khojagii Manziliyu Kurgan-Tyube Solid Waste - Project 2015-2018 EBRD
Kommunali in Kurgan- Implementation Support, Engineering
Tyube City, Tajikistan Design Services and Contract
Supervision, Tajikistan
4. Tajikistan Dushanbe Water Supply Detailed Design, Bidding Documents and 2007-2010 Islamic Dev. Bank
PMU, Dushanbe Supervision of Works under Dushanbe (IDB)
Water Supply Project
5. Tajikistan Municipal Infrastructure
Additional Financing for Municipal
Development Project (AF 2013-2015 IDA
Infrastructure Development Project
MIDP)
6. Tajikistan PMU, Municipal Water Distribution System Leak Detection 2007-09 World Bank (WB)
Infrastructure Program under Municipal Infrastructure
Development Project Development Project
7. Afghanistan Ministry of Urban Extension of the Water Supply System of 2005-2010 KfW-Entwick-
Development and Kabul (Water Supply Kabul-II), Afghanistan lungsbank
Housing (MUDH)
8. Afghanistan Sub-Contractor Ministry of Urban Development Affairs 2010-2012 Govt. of
Agreement for Northern (MUDA) and Afghan Urban Water Supply & Afghanistan
Provinces Afghanistan Sewerage Corporation (AUWSSC)
Urban Water Supply
Programme II
9. Afghanistan Afghan Association Re-establishment & Operation of Water 2003-11 International
Coordination Unit (AACA) Supply and Sanitation Services in Selected Development
Provincial Towns Association (IDA)
10. Somaliland Hargeisa Municipality , Private Sector Development Reengagement 2012-13 World Bank
Republic of Somaliland Phase II, Consulting Services Solid Waste
Management, Somaliland
11. Sudan Institutional Capacity Consultant Services for Design & 2018-2021 AfDB
Building for Improvement Supervision of Emergency Water Supply
Access to Water & Rehabilitation Works & Construction of
Sanitation in Port Sudan Septage Treatment Plant
12. Vietnam The government of Emergency Rehabilitation of Calamity 2009 ADB
Socialist, Vietnam Damage Project Vietnam (Sub-consultancy)
13. Bangladesh IFC-World Bank Wastewater Management Facilities for 2021-2022 IFC-World Bank
Gazipur City Corporation
14. Bangladesh LGED Technical Audit (Technical, Fiduciary & 2021-2023 IDA
Safeguard) Consultant under Program for
Supporting Rural Bridges (SupRB)
15. Bangladesh Department of Public Technical Support Unit and Related 2020-2023 IDA
Health Engineering Services under Bangladesh Municipal
(DPHE) Water Supply and Sanitation Project (30
Pourashavas, Package No: S-14)
16. Bangladesh DPHE Supervision and Technical Support of Cox's 2020-2022 ADB
Bazar District's Ukhia and Tecknaf
Upazilla's Water Supply and Sanitation
Activities' Emergency Assistance Project,
DPHE, Dhaka (Sub-consultancy)
17. Bangladesh Chattogram Water Supply Engineering Design and Construction 2019-2023 GOB
and Sewerage Authority Supervision of Project for Establishment
(CWASA) of Sewerage System in Chattogram
Metropolitan (Phase-1)
18. Bangladesh Department of Public Design and Supervision of Water Supply 2019-2021 GOB
Health Engineering Systems & Environmental Management
(DPHE) (Drainage, Faecal Sludge and Solid Waste
Management) in 32 Pourashavas, Dhaka

31
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
19. Bangladesh Mongla Port Authority Installation of Surface Water Treatment 2019-2020 GOB
Plant of Mongla Port Authority
20. Bangladesh Dhaka WASA Consultancy Services for Reviewing of the 2017-2020 China EXIM Bank
Design, Construction Supervision of
EPC/Turnkey Contract & Contract
Management for 500 MLD Capacity of
Dasherkandi Sewage Treatment Plant
Project.
21. Bangladesh JICA Groundwater Survey for the Data Collection 2020 JICA
Survey for Water Resource of Southern
Chattogram Region, Bangladesh
22. Bangladesh Bangladesh Economic Business Case and Transaction 2018-19 World Bank
Zones Authority (BEZA) Implementation for the Centralized Effluent
Treatment Plant (CETP) for the Mirsarai-2A
Economic Zone
23. Bangladesh DPHE Feasibility Study and Design for 2017-18 GoB
Improvement for Improved Latrine in
Extremely Hard to Reach Areas under
National Sanitation Project (Phase-III)
24. Bangladesh Chittagong Water Supply Design, Construction Supervision and 2014-21 JICA
& Sewerage Authority Related Services under Karnaphuli Water
(CWASA) Supply Project-Phase-2 (KWSP2)
25. Bangladesh KWASA TA-7872 BAN: Khulna Water Supply 2016 ADB
Project (42171-013)
26. Bangladesh ADB ADB TA 7820 BAN: Khulna Sewerage 11/2015- ADB
Master Plan- 2015-2016 02/2016
27. Bangladesh CWASA Feasibility Study, Design and Construction 2013-16 IDA
Supervision of Modunaghat Water
Treatment Plant and related Transmission
Pumping Facilities
28. Bangladesh DPHE Technical Assistance and Supervision of 2015-2017 GoB
40 Pourashavas and Growth Centre Water
Supply & Environmental Sanitation Project
(Phase-II)
29. Bangladesh Hyundai Rotem Engineering Services Relating to Well 2015 Hyundai Rotem
Field Construction Project at Tetulzhora-
Bhakurta Area of Savar Upazilla in Dhaka,
Bangladesh (Sub-Consultancy)
30. Bangladesh Khulna Water Supply Design and Supervision Consultancy 2012-17 ADB
and Sewerage Authority Services for Khulna Water Supply Project
(KWASA) (ADB Component)
31. Bangladesh Eastern Housing Limited Preparation of Design & Estimation of 2018 Eastern Housing
Sewerage & Storm Water Network of Limited
Jahurul Islam City (Aftabnagar)
32. Bangladesh Chittagong Port Authority Installation of Surface Water Treatment 2013-14 GoB
Plant at CPA Premises
33. Bangladesh Dhaka WASA Padma (Jashaldia) Water Treatment Plant 2014-19 China EXIM Bank
(Phase-1) Project (PJWTPP)
34. Bangladesh WASTE BRAC WASH Low Cost Sanitation 2013-14 IRC
35. Bangladesh World Health Establishing Water Safety Plan (WSP) in 2014-15 World Health
Organization Water Supplies of Sylhet City Corporation. Organization
36. Bangladesh TULLOW Bangladesh Ltd. Provision of LQ Water Sampling & 2012-13 TULLOW
Microbiological Analysis Services.
37. Bangladesh TULLOW Bangladesh Ltd. Provision of EQS Sampling & Analysis 2012 TULLOW
Services
38. Bangladesh TULLOW Bangladesh Ltd. Provision of Black & Grey Water Sample 2012 TULLOW
Analysis Services
39. Bangladesh TULLOW Bangladesh Ltd. Provision of Radiation Monitoring Services 2012 TULLOW
40. Bangladesh NJS Consultants Co. Ltd The Preparatory Survey on Chittagong 2012 JICA
Water Supply Improvement Project
(Ground Level Survey & Social Survey).
41. Bangladesh DPHE Technical Assistance and Supervision of 2012-15 IDB
the IDB Assisted Water Supply and

32
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
Sanitation Project in Cyclone Prone
Coastal Areas of Bangladesh
42. Bangladesh DPHE Consultancy Services for 37 District 2012-14 GoB
Towns Water Supply Project
43. Bangladesh Khulna Water Supply Detail Design and Construction 01/2011- GoB
and Sewerage Authority Supervision for Development of Water 12/2012
(KWASA) Supply System in Khulna City
44. Bangladesh World Bank Data Collection Survey on Water Supply 2012 World Bank
Sector in Local Municipalities in Bangladesh Group
45. Bangladesh Tokyo Engineering Data Collection Survey on Water Supply 2012 JICA
Consultants (TEC) Co. Ltd. Sector in Local Municipalities in Bangladesh
46. Bangladesh Dhaka WASA Technical Assistance to Provide 2010-2014 DANIDA
Supervision Services of the Project
Implementation for Saidabad Water
Treatment Plant Project Phase II
47. Bangladesh Dhaka WASA Design and Management Consultancy 2009-2014 Asian
(DMC) of Dhaka Water Supply Sector Development
Development Project (DWSSDP) Bank (ADB)
48. Bangladesh Dhaka WASA Consultancy Services to Provide Technical 2011-2014 International
Assistance to PMU, DWSSP of DWASA Development
(PACKAGE # S-17A) Association (IDA)
49. Bangladesh TULLOW Bangladesh Ltd. Sludge Sample Analysis and Reporting 2011 TULLOW
Services
50. Bangladesh NJS Consultants Co, Ltd. Advancing NRW Reduction Initiative of 2011-13 JICA
Chittagong WASA (PANI)
51. Bangladesh Dhaka WASA Water Supply System Expansion and 2010-2012 GoB
Rehabilitation of Narayangonj Town.
52. Bangladesh Chittagong WASA GIS Mapping of Distribution Network for 2010-2012 JICA
The Project for Advancing Non Revenue
Water (NRW) Reduction Initiative of
Chittagong WASA
53. Bangladesh Chittagong WASA Field Verification and Underground Utility 2010-2011 JICA
Survey of Distribution Network for The
Project for Advancing NRW Reduction
Initiative of Chittagong WASA
54. Bangladesh Chittagong WASA Test Excavation and Supplemental 2010-2011 JICA
Topographic Survey of Distribution Network
for The Project for Advancing NRW
Reduction Initiative of Chittagong WASA
55. Bangladesh Chittagong WASA Public Campaign Assistance for The 2010-2011 JICA
Project for Advancing NRW Reduction
Initiative of Chittagong WASA
56. Bangladesh Chittagong WASA Institutional Development Consultants 2010-2012 JICA
under Karnaphuli Water Supply Project
(KWSP)
57. Bangladesh DPHE Ground Water Management and TPP for 2010-2012 GoB
Survey, Investigation and Feasibility Study
in Upazilla and Growth Center Level
Pourasava having no Piped Water System
under Mathematical Modelling for Surface
Water Source Identification
58. Bangladesh LGSU Support Organization (SO) in Barisal 2008-2011 DANIDA-
Region under the Water Supply and HYSAWA
Sanitation Sector Support Program
59. Bangladesh DPHE Water Supply Sanitation and Drainage 2008-2012 GoB
Project in Sylhet and Barisal City
60. Bangladesh PSU, LGED Review and Revision of Sector 2009-2010 DANIDA
Development Program for Water Supply
and Sanitation Sub-sector in Bangladesh
61. Bangladesh Policy Support Unit (PSU), Review and Revisions of the Sector 2008-2010 GoB-Danida
Sector Policy Support for Development Programme (SDP) for the

33
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
the Water Supply and Water and Sanitation Sub-sector in
Sanitation Sector, LGD Bangladesh
62. Bangladesh Dhaka WASA Water Quality and Industrial Pollution 2009-2010 IDA
Monitoring System Program Design
Feasibility and Engineering Studies under
Dhaka Integrated Environmental and Water
Resources Management Project
63. Bangladesh PSU, LGED Formulation of National Guidelines on 2009-2010 DANIDA
Water Safety Framework (WSF) in
Bangladesh
64. Bangladesh NJS Consultants Co. Ltd. Preparation of Base Map of Khulna City for 2009 JICA
- KWASA Khulna Water Supply Improvement Project
65. Bangladesh NJS Consultants Co. Ltd. Water Quality Analysis of Khulna Water 2009-2010 JICA
- KWASA Supply Improvement Project
66. Bangladesh NJS Consultants Co. Ltd. Land use Survey, Social and 2010 JICA
- KWASA Environmental Study and Sub-soil
Investigation of Khulna Water Supply
Improvement Project
67. Bangladesh NJS Consultants Co. Ltd. Water Quality Analysis Phase-2 of Khulna 2010 JICA
- KWASA Water Supply Improvement Project
68. Bangladesh NJS Consultants Co. Ltd. Environmental and Social Considerations 2010 JICA
- KWASA Study for Khulna Water Supply
Improvement Project
69. Bangladesh NJS Consultants Co. Ltd. Survey Works for Water Distribution 2010 JICA
- KWASA Network for Khulna Water Supply
Improvement Project
70. Bangladesh LGSU National Consultant to Conduct a Study 2009-2010 DANIDA -
on Governance of Union Parishad (UP) in HYSAWA
HYSAWA Project Areas
71. Bangladesh Department of Social and Environmental Assessment 2009-2010 IDA
Environment (DOE)- (ESA) under Dhaka Integrated
DWASA Environmental and Water Resources
Management Project (DIEWRMP)
72. Bangladesh Chittagong Water Supply Engineering Consultancy Services for 2008-12 JICA
& Sewerage Authority Detailed Design, Construction,
(CWASA) Supervision and Related Services under
Karnaphuli Water Supply Project
73. Bangladesh CWASA Engineering Consulting Services for 2008-11 GoB
Mohara & Kalurghat Water Treatment
Plant Rehabilitation
74. Bangladesh CWASA Brief Cost Estimation and Hydraulic 2008 KOICA
Analysis of Pipe Network Water Supply of
Detailed Planned Area of Chittagong
75. Bangladesh Local Government Support Organization (SO) in Rajshahi 2008-10 DANIDA-
Support Unit (LGSU), District under the Water Supply and HYSAWA
DPHE Sanitation Sector Support Program
76. Bangladesh Department of Public Service and Design of Treatment Plant 2007-08 GoB
Health Engineering (Iron – Arsenic) at Hobiganj under
(DPHE) “Rehabilitation and Development of Water
Supply System in Pourashavas including
regeneration of Tubewell project
77. Bangladesh LGED/GHD, Australia Feasibility Study and Design of Sub- 2007 GoB
projects in three Selected Pourashavas
78. Bangladesh DPHE Detail Engineering Design and 2007-10 GoB
Construction Supervision of Water Supply
and Environmental Sanitation Project in
Mongla Pourashava
79. Bangladesh ADP / BAMWSP, Feasibility Study and Preparation of 2005 World Bank (WB)
DPHE Project Proposal on Rural Piped Water
Supply Scheme
80. Bangladesh Sukhi Paribar Sangstha Conducting Inception Report, Feasibility 2005-2009 IDA
(SPS), BAMWSP, DPHE Study and Project Proposal of Rural Piped

34
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
Water Supply Scheme in Shakrail and
Chandoir Village of Manikgonj Sadar
Upazila
81. Bangladesh DWASA Dhaka Water Supply Project (ADB TA No. 2006 ADB
4651 BAN)
82. Bangladesh Economisti Associati, Small Scale Private Service Provider in 2006 WB
Italy Water Supply and Electricity.
83. Bangladesh OCETA Execute the BETV-SAM (Bangladesh 2006 OCETA
Environmental Technology Varification-
Support to Arsenic Mitigation) Verification
Field Testing.
84. Bangladesh Eastern Housing Ltd. Design of drainage system of Eastern 2005 EHL
Housing Pallabi Phase II Land Project.
85. Bangladesh Unit for Policy Sample Survey for Region-Wise Drinking 2005 DANIDA
Implementation (UPI) Water Supply Coverage
86. Bangladesh DWASA Removal of Water Logging in Dhaka City 2004-05 GoB
87. Bangladesh LGED Feasibility Study of Banderban 2004-05 IDA
Pourashava Water Supply Municipal
Services Project : IDA Credit # 3177-BD
88. Bangladesh NJS Consultants, Japan Feasibility Study of Karnaphuli Water 2005 JICA
Supply Project
89. Bangladesh CWASA Karnafuli Water Supply Project (SAPROF 2005 JBIC
Study)
90. Bangladesh Department of Public Feasibility Study, Detail Design and 1998-04 GOB
Health Engineering Construction Supervision of Water Supply
(DPHE) and Sanitation Project at Gopalgonj,
Tungipara and three other Thanas
(Gopalgonj Pourashava and Thana Water
Supply & Sanitation Project)
91. Bangladesh PCI, Japan Waste Generation Amount and 2004 JICA
Composition Survey
92. Bangladesh PCI, Japan Recycling Market Study 2004 JICA
93. Bangladesh PCI, Japan Water Quality Analysis Survey 2004 JICA
94. Bangladesh The Royal Danish Rural and Arsenic Transition Component 2004 DANIDA
Embassy Description under the Second Phase
Water and Sanitation Sector Program
Support (WSSPS II) in Bangladesh
95. Bangladesh Unit for Policy Monitoring and Rapid Assessment of 2003 DFID
Implementation (UPI) Month-Long Sanitation Campaign in
Bangladesh
96. Bangladesh LGED Participatory and Partnership Approach 2000-03 IDA
(PPA) Consultancy for Municipal Services
Project
97. Bangladesh DWASA Identify and Diagnosing Problems Including 2003 GoB
the Recommendation of Remedial
Measurement for Smooth Operation and
Maintenance of Dholaikhal Pumping Station
after Determining Workability and Present
Condition
98. Bangladesh The Unit for Policy Monitoring and Rapid Assessment of 2003 DFID
Implementation (UPI) Month-long Sanitation Campaign in
Bangladesh
99. Bangladesh DPHE Formulation of Standard Design Criteria 2001-02 WHO
for Urban Water Supply & Sanitation in
Bangladesh
100. Bangladesh DPHE Design of Water Treatment Plants at 2001-02 GOB
Rajbari, Serajganj and Chandpur
Pourashava (Municipality)
101. Bangladesh Kukusai Kogyo Co. Ltd. Tubewell Screening, Map Preparation and 2002 JICA
Social Survey In Keshabpur Thana, Jessore

35
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
102. Bangladesh CWASA & DWASA Study of Organizational Capability of 2002 JBIC
CWASA & DWASA
103. Bangladesh DPHE User Level Survey, Institutional Review 2002 DFID
Phase-I, Water Supply and Sanitation
Sector
104. Bangladesh DPHE Study of the Groundwater Development of 2000-01 JICA
Deep Aquifers for Safe Drinking Water
Supply to Arsenic Affected Areas in
Western Bangladesh
105. Bangladesh DPHE Assessment of Groundwater Resources and 2000-01 DANIDA
Their Optimal Utilization and Protection in
the Coastal Belt of Bangladesh
106. Bangladesh DPHE Consultancy Services for Detailed Design & 1996-00 GoB
Construction Supervision of Water Supply
Project for Rajshahi Metropolitan City
107. Bangladesh DPHE Design of Overhead Water Tank and Iron 1999-00 GOB
Removal Plant under "23 Towns Water
Supply Project
108. Bangladesh DPHE Study and Detailed Design of Iron 2000 GOB
Removal Plant (Approx. Capacity
500M3/D) at Chittagong BIT
109. Bangladesh CWASA Feasibility Study of Karnafuli Water 2005 JBIC
Supply Project
110. Bangladesh DPHE IDB Assisted Water Supply and Sanitation 1999-00 IDB
Project in the Coastal Belt Areas
111. Bangladesh DPHE Rapid Assessment of Household Level 2000 DFID
Arsenic Mitigation Techniques
112. Bangladesh DWASA Management and Operational Support 1997-00 WB
(Twinning) Program
113. Bangladesh DPHE Consultancy Services for DPHE-DANIDA 2000 DANIDA
Water Supply and Sanitation Components
(CCU)
114. Bangladesh CWASA Extension and Expansion Project of 2000 JICA
Mohora Water Treatment Plant, CWASA
115. Bangladesh DPHE 18 District Town Water Supply & 1989-99 DGIS,
Sanitation Project Netherlands
116. Bangladesh DWASA Improved Sanitation Services Project 1997-99 WB
117. Bangladesh DPHE Redesign and Monitoring of Distribution 1999 GoB
System in Different Pourashava under
“Tube-well Regeneration and Water Supply
System Rehabilitation and Development in
20 Pourashavas”
118. Bangladesh UNICEF Review the Cost and Design of the Water 1998-99 UNICEF
and Sanitation Facilities of School
Sanitation Program
119. Bangladesh DPHE Evaluation of 350 Mini Tara Hand Pumps 1998-99 UNICEF
120. Bangladesh DWASA Detail Assessment of Damage caused and 1999 WB
Rehabilitation required in Water Supply
System of Dhaka WASA due to Recent
Devastating Flood.
121. Bangladesh DWASA Detail Assessment of Damage caused by 1999 WB
Recent Flood in the Sewer System of
DWASA due to Recent Devastating Flood
122. Bangladesh DPHE Monitoring the activities UNICEF assisted 1998-99 UNICEF
Water Supply and Sanitation Project
123. Bangladesh DWASA Strategy Study to Mobilize Finance and 1997-99 WB
Increase Efficiency in Dhaka Water Supply
and Sewerage Sector
124. Bangladesh Bangladesh Tobacco Effluent Treatment Plant of Bangladesh 1997-98 GOB
Company Ltd. (BTC) Tobacco Company Ltd., Dhaka Factory

36
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
125. Bangladesh DPHE Conducting an Consultancy Services for 1996-97 UNICEF
Independent Check on the Survey Tara
Hand pumps
126. Bangladesh DPHE Evaluation of the Performance of 50 Tara 1997 UNICEF
Pump Converted from Conventional Deep
Set Pump
127. Bangladesh DWASA Isolation of Zone-IV & V and Macro- 1996-97 WB
metering to Determine Available Water in
each Zone
128. Bangladesh DWASA Immediate Action Program (Training) to 1994-97 WB
Reduce Unaccounted for Water
129. Bangladesh DPHE Feasibility Study of Water Supply, 1994 GoB
Sanitation and Drainage Project for
Rajshahi Metropolitan City
130. Bangladesh CAAB Detailed Survey and Investigation for 1993 GOB
Improvement of the Residential Water
Supply System of CAAB, Dhaka
131. Bangladesh DWASA Leak Detection and Waste Prevention 1988-91 WB
Program
132. Bangladesh DPHE Study and Design of a Small Bore Sewer 1988-89 WB
Pilot Project at Mymensingh
133. Bangladesh DPHE Performance Improvement Water Supply 1988 DGIS
& Sanitation Project, Khulna
134. Bangladesh CAAB Detailed Design of Standby Water Supply 1986-87 GOB
System of Zia International Airport
WATER RESOURCES MANAGEMENT
135. Tajikistan Agency for Land TAJ Water Resources Management in 2017-2021 ADB
Reclamation and Irrigation Pyanj River Basin-5 Project
of the Republic of Implementation and Monitoring Consulting
Tajikistan (ALRI) Services for ALRI
136. Tajikistan State Institute Project Technical Support for Development of 2015-2016 IDA
Management Unit Feasibility Report for Flood Controlling
Ferghana Valley Water Measures on Flood Channel Tebalaisai
Resources Management Above the City of Kulyab for its Protection
Project, Tajikistan
137. Tajikistan State Institution Project Development of a comprehensive 2011 European Union
Management Unit framework for the introduction of River
Ferghana Valley Water Basin Management to Tajikistan and
Resources Management Support to Local Authorities in the Project
Project, Tajikistan Area, Responsible for the Operation and
Management of Irrigation and Drainage
Schemes
138. Tajikistan Ministry of Water Khatlon Province Flood Risk Management 2008-12 ADB
Resources and Land Project [ADB LOAN NO. 40046]
Reclamation (MWRLR)
139. Tajikistan MWRLR Strengthening Embankment along Pyanj 2006 ADB
River under Irrigation Rehabilitation
Project
140. Tajikistan MWRLR Consultancy Services for Management, 2006-12 ADB
Design, Monitoring and Supervision of
Irrigation Rehabilitation Project
ADB LOAN NO. 2124-TAJ (SF)
141. Tajikistan Project Management Unit Design of Works and Installations for 2008-09 IDA
(PMU), FVWRMP Rehabilitation of Irrigation and Drainage
Systems and for Strengthening of Reservoir
Embankments under Ferghana Valley
Water Resources Management Project
142. Tajikistan Ministry of Water Construction Supervision of Dangara 2002-05 IDB
Management & Valley Irrigation Project (Phase-1)
Amelioration
143. Tajikistan Ministry of Water Consultancy Services for Developing a 2000-01 IDB
Management & Comprehensive Bankable Document,

37
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
Amelioration Detailed Engineering Design and Tender
Documents for the Dangara Valley Project
144. Afghanistan AECOM Conducting Feasibility Study of the Khush 2018-2019 USAID
Tepa Irrigation Scheme and Power
Generation (KTISPG) in Kunduz Balkh
and Jawazjan Provinces of Afghanistan for
Projects in Support of USAID/AECOM's
SWIM Project Activities
145. Afghanistan DT Global/ MAIL Conducting the Component-I of the Khush 2020-2021 USAID
Tepa Irrigation Project Feasibility-II in
Kunduz, Balkh and Jawazjan Provinces of
Afghanistan for Projects in Support of
USAID/DT Global's SWIM Project
Activities (Sub-consultant)
146. Afghanistan Ministry of Energy & Water Dahla Dam Project ("Arghandab Irrigation 2009-12 CIDA
(MEW), Afghanistan Rehabilitation Project") in Afghanistan
(Sub-consultancy)
147. Afghanistan ARDS under Ministry of Detailed Survey and Design of Small and 2010-11 Govt. of
Energy & Water Medium Dams and Related Structures Afghanistan
(Sub-consultancy)
148. Afghanistan Ministry of Energy and Golbahar Storage Dam Project, Social 2008-09 MEW
Water (MEW), AFG Survey, Environmental Assessment and
Economic Feasibility Study
149. Afghanistan Ministry of Energy & Feasibility Study of Kelagai Storage Dam 2007-08 IDA
Water (MoEW) Project’
150. Afghanistan MoEW Feasibility Study for Small and Medium 2006-08 IDA
Dams Project
151. Vietnam DRSIP, Ministry of Vietnam Dam Rehabilitation and Safety 2019-2022 IDA
Agriculture and Rural Improvement Project (DRSIP) - Project
Development Implementation Consultant (PIC), Vietnam
152. Nepal Melamchi Water Supply Melamchi Water Supply Project - Design 2015-2017 Government of
Board and Construction Supervision Consulting Nepal
Services during Construction for
Headworks and Melamchi Diversion
Tunnel, Tunnel Contract MDS/DT/02
(Contract No.: MWSP/CS/01 (2015)
153. Uzbekistan ADB Project Preparatory Consultant for the 2017-2018 ADB
Sustainable Hydropower Project (Sub-
consultancy)
154. Azerbaijan Asian Development TA-9945 AZE: Preparing Irrigation and 2020-2021 ADB
Bank (ADB) Drainage System Development in
Nakhchivan Autonomous Republic –
Consulting Firm
155. Yemen Ministry of Agriculture Consultancy Services for Major Works in 2008 IDA
and Irrigation, Yemen Wadi Ahwar under 'Irrigation Improvement
Project' (Sub-consultancy)
156. Bangladesh BWDB through Govt. of Char Development and Settlement Project 2019-2022 GoN, IFAD
Netherlands (GoN) Bridging (CDSP-B)
157. Bangladesh LGED Small Scale Water Resources 2018-2023 JICA
Development Project (Phase-2)
158. Bangladesh BWDB Consultants Services for Third Party 2015-2021 IDA
Monitoring & Evaluation of Overall Project
Implementation under Coastal
Embankment Improvement Project,
Phase-1 (IDA Credit #5280-BD)
[Contract No. CEIP-1/C2/S3]
159. Bangladesh BWDB Irrigation Management Operator (IMO) for 2016-2021 ADB
Muhuri Irrigation Project (MIP)
160. Bangladesh LGED Feasibility Study and Detail Design of 2014-2015 ADB
PSSWRSP
161. Bangladesh BWDB Consultancy Services for Management, 2015-2022 JICA
Design & Supervision and Other Related
Services for Haor Flood Management and
Livelihood Improvement Project

38
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
162. Bangladesh BWDB and DAE Integrated Planning for Sustainable Water 2013-2019 Government of the
Management (IPSWAM) - Blue Gold Kingdom of the
Program Netherlands
163. Bangladesh LGED Detail Designs (DD) of Subprojects under 2019-2021 GoB
the Sustainable Small Scale Water
Resources Development Project
(SSSWRDP)
164. Bangladesh LGED Feasibility Study and Detailed Design 2010-2013 Government of
(FSDD) of Subprojects under the Japan
Participatory Small Scale Water
Resources Sector Project in Greater
Mymensingh, Sylhet and Faridpur Areas
165. Bangladesh The JICA Expert Team JICA Project for Capacity Development of 2013-16 JICA
Management for UGIISustainable Water
Related Infrastructure in The People's
Republic of Bangladesh
166. Bangladesh JICA Expert to BWDB The Inventory Survey of Hydraulic 2015 JICA
Structures of Water Resources
Development along the Manu River in
Moulvibazar O&M Division, BWDB
167. Bangladesh JICA Preparatory Survey on Upper Meghna 2013 JICA
River Basin Watershed Management
Improvement Project
168. Bangladesh JICA Upper Meghna Basin Study Project 2011 JICA
169. Bangladesh JICA Primary Compaction Test of Embankment 2015 JICA
Material in Khaliajuri
170. Bangladesh The JICA Expert Team Geotechnical Investigation and Cross- 2014 JICA
(IDEA Consultants) Section Survey for Stability Assessment of
Damaged Embankment
171. Bangladesh The JICA Expert Team Geotechnical Investigation and 2014 JICA
(IDEA Consultants) Topographic Survey for Detailed
Embankment Design of Pilot Project
172. Bangladesh ADB Innovations for More Food with Less 2013-14 BWDB
Water - Task 2: Country and Project-
Specific Recommendations and Pilot
Initiatives (4572-001) -(Sub-consultancy
Agreement with Lahmeyer International)
173. Bangladesh ADB TA-8074 REG: Applying Remote Sensing 2012-2014 ADB
Technology in River Basin Management
174. Bangladesh LGED Field Survey, Investigation and Feasibility 2013-2014 GoB
Study (FISIS) of 5 (five) Nos. Rubber Dam
175. Bangladesh The JICA Study Team JICA Data Collection Survey on Water 2013 JICA
(Nippon Koei Co. Ltd.) Resources Management in Haor Area of
Bangladesh
176. Bangladesh JICA Expert Feasibility Study for Capacity-Building 2012 JICA
Project for Sustainable Development of
Water-Related Infrastructure Part-3
177. Bangladesh JICA Expert Feasibility Study for Capacity-Building 2011-12 JICA
Project for Sustainable Development of
Water-Related Infrastructure Part-2
178. Bangladesh JICA Study Team Data Collection under the Project "Support 2011 JICA
to JICA Study Team for Water Resources
Development Poject in Meghna Basin"
(Sub-Consultancy)
179. Bangladesh JICA Expert Information Research on Water Resources 2013 JICA
for Low Water Control in Bangladesh
180. Bangladesh BWDB Feasibility Study of Capital Dredging and 2011-13 GoB
Sustainable River Management in
Bangladesh.
181. Bangladesh LGED Feasibility Study and Detailed Design 2011-12 ADB
(FSDD) of Subprojects under the
Participatory Small Scale Water Resources
Sector Project
182. Bangladesh BWDB, LGED & DoF Char Development and Settlement Project- 2011-21 Government of
IV (CDSP lV) Netherlands & IFAD

39
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
183. Bangladesh LGED Providing Investigation & Feasibility Study 2010-12 GoB
of Rubber Dam under Construction of
Rubber Dams in Small & Medium Rivers for
Increasing of Food Production Project
(Package-1)
184. Bangladesh JICA Feasibility Study for Capacity Building 2011 - 2013 JICA
Project for Sustainable Development of
WaterRelated Infrastructure Part-2 & 3
185. Bangladesh BWDB Feasibility Study for Sureswar Flood 2010 - 2011 GoB
Control, Drainage & Irrigation Project
186. Bangladesh BWDB Feasibility Study for Integrated Water Jun 2010- GoB
Management Project of Gungiajuri Haor Mar 2011
Area
187. Bangladesh BWDB Estuary Development Program (EDP) 2007-10 GoN (Govt. of
(under Dutch Assistance) Netherlands)
188. Bangladesh BWDB Feasibility Study and Detailed Engineering 2009-10 Government of
for Ganges Barrage Bangladesh (GoB)
189. Bangladesh BWDB Flood Damage Rehabilitation -2007 Works 2009-11 IDA
Under WMIP (Contract Package no :
BWDB:S-8.1)
190. Bangladesh BWDB Detail Engineering Design for Kurigram 2008-09 GoB
Irrigation Project (North Unit)
191. Bangladesh Local Government Inventory Survey Related to Water 2005 JICA
Engineering Department Resources Development in Greater
(LGED) Mymensingh
192. Bangladesh BWDB The Inventory Survey of Hydraulic 2016 JICA
Structures of Water Resources
Development Schemes in Cox's bazar O &
M Division BWDB
193. Bangladesh IDEA Consultants Inc., Pre-feasibility Study for Drainage 2007-08 IDEA Consultants
Japan Improvement of Dhaka-Narayangonj- Inc., Japan
Demra (DND) Irrigation Project
194. Bangladesh BWDB Command Area Development Project-II 2007-08 ADB
195. Bangladesh BWDB Feasibility Study for Integrated Water 2005-07 GoB
Resources Management of Chalan Beel
Area including Halti Development Project
196. Bangladesh Dutch Embassy Char Development and Settlement Project 2005-10 Dutch funded
197. Bangladesh Local Government Data Collection, Engineering Surveys, 2003 -07 ADB
Engineering Department Feasibility Studies and Detailed Design of
(LGED) Small Scale Water Resources Development
Sector Project (SSWRDSP)
198. Bangladesh BWDB Detail Design and Construction Supervision 2003-06 WB
(Phase-II) of Shrimp and Aquaculture
Component under Fourth Fisheries Project
199. Bangladesh BWDB FAP-21 Monitoring and BWDB Training 2003-05 KfW
Project
200. Bangladesh BWDB Consultancy services for updating / 2005 GOB
upgrading feasibility study of three sub-
project under group-A (Teesta irrigation
project (Phase-II); Kurigram irrigation
project (North Unit & South Unit)
201. Bangladesh LGED Master Plan on Small Scale Water 2001-05 JICA
Resources Development at Union and
Upazila Level
202. Bangladesh LGED District Water Resources Assessment 2004-05 ADB
under Second Small Scale Water
Resources Development Sector Project –
ADB Loan No. 181 BAN(SF) of LGED
203. Bangladesh BWDB Detailed Design & Construction Supervision 2003-04 IDA
of Fish-Pass and Fish-Friendly Structures-
Phase-II under Fourth Fisheries Project

40
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
204. Bangladesh CARE-Bangladesh Explore the Causes of Failure of a Wave 2004 CARE-
Protection Wall of FPP Bangladesh
205. Bangladesh BWDB Feasibility Study of Chandpur Comilla 2003-04 GoB
Integrated FCDI Project
206. Bangladesh Kokusai Kogyo Co., Topographical Survey for the Project on 2004 JICA
Japan Strengthening of Water Examination
System
207. Bangladesh JICA Topographical Survey & Hydrological 2004 JICA
Investigation (Ph-II) for Feasibility Study of
the Padma Bridge
208. Bangladesh JICA Geotechnical Investigation for the 2004 JICA
Feasibility Study of the Padma Bridge
209. Bangladesh Nippon Koei Co. Ltd., Natural Condition Survey (Hydrology & 2003 JICA
Japan Topography) for the Feasibility Study of
Padma Bridge (Phase-I)
210. Bangladesh Nippon Koei Co. of Japan Inventory Survey on Meteorological and 2002-03 JICA
Hydrological Observation System and
Electric Communication System under
feasibility Study for Improvement of Flood
Forecasting and Warning System
211. Bangladesh Nippon Koei Co. of Japan “Survey on Evacuation Condition and 2002-03 JICA
Awareness of Flood Victim” for the
Feasibility Study for Improvement of Flood
Forecasting and Warning Services in
Bangladesh
212. Bangladesh Nippon Koei Co. of Japan The Workshop on Improvement of Flood 2003 JICA
Forecasting and Warning System in
Bangladesh
213. Bangladesh CDSP Feasibility Study on the Development of the 2000-02 DGIS
Char Baggar Dona Area
214. Bangladesh GFA Terr Systems Sustainable Water Management in 2002 Netherlands Govt.
GmbH, Germany Chittagong Hill Tracts Region
215. Bangladesh WARPO National Water Management Plan 1998-01 WB
216. Bangladesh BWDB Feasibility Study (Phase-1) of Shrimp and 2001 WB
Coastal Aquaculture Project
217. Bangladesh BWDB Feasibility Study (Phase-I) of Fish-Pass and 2001 WB
Fish-Friendly Structures under Fourth
Fisheries Project
218. Bangladesh BWDB Study on Options for Ganges Dependent 2001 WB
Area (GDA) Project
219. Bangladesh DAE A Study on the Impact of Polder 2000 IFAD
Rehabilitation on the NIAPWMP
220. Bangladesh CARE, Bangladesh Development of Design Manual for 2000 USAID
Structural Flood Proofing Measures
221. Bangladesh BWDB Gorai River Restoration Project 1999-00 DGIS
222. Bangladesh WARPO North-East Regional Water Management 1991-00 CIDA
Project (FAP-6)
223. Bangladesh BWDB Feasibility Study for Re-Excavation of Betna 2000 GOB
River and Branch Khal
224. Bangladesh WARPO Ghutail Revetment Test Structure under 1999-00 KfW, Germany
FAP 21 - Bank Protection Project & AFD, France
225. Bangladesh BWDB Preparation of O&M Manual of Teesta 1998-99 GOB
Barrage and its Canal Head Regulator
226. Bangladesh WARPO Bank Protection and River Training/AFPM 1991-99 KfW, CCCE
Pilot Project (FAP 21/22)
227. Bangladesh BWDB Evaluation of Drainage and Flood Control- 1988-99 WB
II Project
228. Bangladesh WARPO Training Program for the River Survey 1998-99 EEC
Project FAP-24
229. Bangladesh WARPO Kalni Kushiyara Pilot Dredging Project 1994-99 CIDA
under North-East Regional Water
Management Project (FAP-6)
230. Bangladesh Ministry of Shipping Assessment and Verification of 1998 Flood 1998 IDA
BIWTA Damages of BIWTA and BIWTC
231. Bangladesh BWDB BWDB Systems Rehabilitation Project 1990-98 DGIS

41
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
232. Bangladesh BWDB Feasibility Study of Baral Basin 1996-97 GOB
Development Project
233. Bangladesh BWDB O&M Strengthening of the Second Bhola 1995-97 ADB
Irrigation Project
234. Bangladesh JICA Study of Narayanganj - Narsinghdi Flood 1996-97 OECF
Protection and Irrigation Project
235. Bangladesh WARPO Bahadurabad Revetment Test Structure 1995-97 KfW, Germany &
under FAP 21 - Bank Protection Project AFD, France
236. Bangladesh WARPO & BWDB Compartmentalization Pilot Project 1991-96 DGIS, Netherlands;
(CPP/FAP 20)-Phase I KFW, Germany
237. Bangladesh BWDB Second Small Scale Flood Control 1994-96 CIDA, IDA
Drainage and Irrigation (SSFCDI) Project
238. Bangladesh WARPO River Survey Project FAP24: Management 1993-96 EEC
Unit
239. Bangladesh BWDB Pre-feasibility Study of Second Small Scale 1988-93 CIDA, IDA
Flood Control Drainage and Irrigation
Project
240. Bangladesh BWDB Flood Damage Restoration Project 1987-93 WB
241. Bangladesh CPA & MPA Mathematical Model Study of Pashur-Sibsa 1990-92 DANIDA
River System and Karnaphuli River
Entrance
242. Bangladesh Flood Plan Co-ordination North Central Regional Study (FAP 3) 1991-92 CIDA
Organization
243. Bangladesh BWDB Meghna River Bank Protection Short Term 1990-92 WB
Study (FAP - 9B)
244. Bangladesh BWDB Feasibility Study of the Second Bhola 1991 ADB
Irrigation Project
245. Bangladesh BWDB Implementation of Revised Water Rate Act 1990-91 DGIS
Study, 1990
246. Bangladesh BWDB Small Scale Irrigation Sector Project 1988-90 EEC
(SSISP)
247. Bangladesh BWDB Operation & Maintenance Plan for EIP 1990 DGIS
Programme
248. Bangladesh BIWTA Reassessment of BIWTA Marine Workshop 1990 NORAD
249. Bangladesh BWDB Haor Development Project 1989 CIDA
250. Bangladesh BWDB Pre-feasibility Study for Flood Control in 1989 EEC, French
Bangladesh
251. Bangladesh BWDB Fourth Evaluation of EIPs Project 1988 DGIS, SIDA
252. Bangladesh LGED Small Catchment Rainfall Runoff Study 1986-87 ODA (UK)
ROAD / BRIDGE, RAILWAY SECTOR
253. Tajikistan Ministry of Transport, Institutional and Policy Support to the 2004 ADB
Republic of Tajikistan Transport Sector, Tajikistan
254. Tajikistan Ministry of Transport, Dushanbe-Kyrgyz Border Road 2005 ADB
Republic of Tajikistan Rehabilitation Project (Phase-II)
255. Afghanistan Ministry of Public Works, Construction Supervision of Fayzabad- Govt. of
Behrak Road Project 2012-14
Afghanistan Afghanistan
256. Afghanistan Capacity Building to Ministry of Public Asian
Ministry of Public Works,
Works - Transport Network Development 2014-15 Development
Afghanistan Investment Program, Tranche 1 Bank (ADB)
257. Afghanistan ARDS under Ministry of Supervision Consultancy for Construction of 2010-2016 ADB
Public Works Road between Jabul Saraj – Sourbi (50
KM) [Jabul – Nijrab]
258. Afghanistan The Ministry of Public Detailed Engineering Design, Procurement 2007-2013 IDB
Works (MPW) Assistance, Project Management and
Construction Supervision Consultancy
Services of Andkhoy-Aquina Road, Con-II
259. Afghanistan The Ministry of Public Consultancy Services for Detailed 2007-2016 IDB
Works (MPW) Engineering Design, Procurement
Assistance, Project Management and
Construction Supervision of Doshi-Pol E
Khomri Road , Con-I

42
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
260. Kazakhstan Committee for Roads, CAREC Transport Corridor I (Taraz-Korday 2009-2013 ADB
Ministry of Transport and Section) Investment Program; CSP-1
Communications Project Management Consultant
261. Albania IDB Structural Configuration of Buna Bridge and 2005-06 IDB
Cost Comparison Between Early Designed
Multispan Bridge and Proposed New Bridge
Schemes with Movable Span in Albania
262. Bangladesh Roads and Highways Construction Supervision Consultant of 2021-2023 GOB
Department (RHD) Development of Kurigram (Dasherhat)
Nageshwari-Bhurungamari-Sonahat Land
Port up to National Highway Project.
263. Bangladesh Roads and Highways Consultancy Services for Review of 2021-2024 GOB
Department (RHD) Pavement Bridge, Culvert Design and
Supervision of Construction works for
widening the Barayerhat-Heanko-Ramgarh
Road (R-151 & R-152) under Chattogram
Road Division
264. Bangladesh ADB TA-9408 BAN: Updating the Road Master 2019-21 ADB
Plan
265. Bangladesh Bangladesh Railway Engagement of Architects, Design 2019 China EXIM Bank
Engineers and Support Staffs for Designing
and Design Review of Station & Buildings
Package under Padma Bridge Rail Link
Project in Bangladesh
266. Bangladesh Bangladesh Railway Consultancy Services for Feasibility Study for 04/2019- GOB
Construction of Circular Rail Line around Dhaka 03/2020
City Project
267. Bangladesh Bangladesh Bridge Consultancy Services for Carrying Out 2019 GOB
Authority (BBA) through Feasibility Study and Preliminary Design for
TYPSA Construction of Dhaka Subway, Bangladesh
- Transportation Surveys Management
268. Bangladesh Roads and Highways Project Implementation Consultancy 2018-2022 ADB
Department (RHD) Services for SASEC Road Connectivity
Project II: Improvement of Elenga-
Hatikamrul-Rangpur Road to a 4-Lane
Highway
269. Bangladesh Bangladesh Railway Feasibility Study and Detail Design for 2018-2020 China EXIM Bank
Construction of Dhaka-Chittagong via
Comilla/Laksam High Speed Railway
270. Bangladesh Bangladesh Bridge Consultancy Services for Carrying Out 2018-2020 GoB
Authority (BBA) Feasibility Study and Preliminary Design
for Construction of Dhaka Subway Project
-- Geotechnical Site Investigation
Management
271. Bangladesh Bangladesh Bridge Geotechnical Site Investigation 2019-2020 GoB
Authority (BBA) Management.of Carrying Out Feasibility
Study and Preliminary Design for
Construction of Dhaka Subway, Bangladesh
272. Bangladesh Dhaka South City Detailed Feasibility Study for Construction 2016 Dhaka South City
Corporation of Common Utility Tunnel in the Primary Corporation
Roads of Dhaka South City Corporation
Area (App. 6 Km)
273. Bangladesh LGED Consultancy Services for Screening and 2015 GoB
Feasibility Study of Route Options
Connecting Chittagong, Bangladesh and
NE Border Area, and Survey, Detail Design
of Road Connecting Thegamukh and
Highway to Chittagong under Bangladesh
Trade and Transport Studies RETF Project
(BTTSRP), Contract Package No. MOS-S4.
274. Bangladesh Tokyo Electric Power Consulting Services for Planning and 2013 JICA

43
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
Services Co. Ltd Design on Access Road for Preparatory
(TEPSCO) Survey on Chittagong Area Coal Fired
Power Plant Development Project in
Bangladesh (JICA Study)
275. Bangladesh LGED Integrated Performance Audit Consultant 2014-18 World Bank
(IPAC) of Second Rural Transport
Improvement Project (RTIP-II)
276. Bangladesh Ministry of TA 7840-BAN: Road Safety Improvement 2013 ADB
Communication Programs
277. Bangladesh Bangladesh Bridge Feasibility Study (a) for construction of
Authority, Setu Bhaban, Bridge at ferry location at 70th km on
Dhaka Labukhali-Dumki-Bogra-Dashmina-
Golachipa-Amragachi Road (Z8806) (b)
for Construction of Bridge At ferry location
at 53rd km on Barishal - Jhalokathi - 2011-12 GoB
Bhandaria-Pirojpur Road (R-870) over the
river Kocha & (c) for construction of Bridge
at ferry location at 8th km on Rahmatpur-
Babuganj-Muladi-Hizlakok Road (Z8034)
278. Bangladesh Dhaka Transport Development of the BRT and Corridor
Coordination Board Restructuring Implementation Study and
(DTCB) Preliminary Design work for the Uttara - 2011-13 IDA
Mohakhali - Ramna - Sadarghat Corridor
in Dhaka.
279. Bangladesh Dhaka bus network and regulatory reform
DTCB 2011-13 World Bank
implementation study and design work
280. Bangladesh Asian Development Bank Greater Dhaka Sustainable Urban Jul’10-
ADB
(ADB) Transport Corridor TA Nº: 7415 Apr’11
281. Bangladesh Consulting Services for Supervision of 7
Rajdhani Unnayan
Nos. of Bridge Construction Work of 2009-2011 GoB
Kartripakkha (RAJUK)
Purbachal New Town Project
282. Bangladesh Local Government Carrying out Performance and Financial 2006-07 ADB
Engineering Department Auditing (FA) under ADB assisted
(LGED) "Emergency Flood Damage Rehabilitation
Project" 2004. (Part: A Rural Infrastructure
& Part E: Municipal Infrastructure)
283. Bangladesh Roads and Highway Carrying out Performance and Financial 2005-07 ADB
Department (RHD) Auditing (FA) under ADB assisted
"Emergency Flood Damage Rehabilitation
Project" 2004. (Part: B Roads) ADB
284. Bangladesh Bangladesh Railway JBIC Special Assistance for Project 2008 JBIC
Implementation (SAPI) for Dhaka-
Chittagong Railway Development Project
285. Bangladesh Bangladesh Railway JBIC Special Assistance for Project 2006 JBIC
Formation (SAPROF) for Dhaka-
Chittagongn Trunk Railway Transportation
Capacity Enhancement Project
286. Bangladesh Department (RHD) Rehabilitation and Privatization of Eight 2001-03 DANIDA
Ferry Services in Patuakhali and Barguna
287. Bangladesh Bangladesh Railway ADB TA : Organizational Reform of 2002-03 ADB
Bangladesh Railways (Phase-III)
288. Bangladesh RHD Carrying out Performance and Financial 2007-10 ADB
Auditing (FA) of 4 ADB Funded Road
Transport Project in Bangladesh.
289. Bangladesh Bangladesh Railway ADB TA : Regional Traffic Enhancement 2002 ADB
Project, Bangladesh Railway
LAND-USE PLANNING AND INFRASTRUCTURE DEVELOPMENT
290. Construction of Modern Rural Houses
(Phase 1) Technical Review of the
“Qishloq Qurilish Invest” Constructed Houses and Associated
Uzbekistan LLC Infrastructures (access and internal roads, 2017 IDB
access and internal water supply system)
in Samarkand, Tashkent and Fergana
Regions Istisn’a Agreement (UZB-0075)
291. City Director, Mbeya City International
Tanzania 2011-14
Council, Mbeya, Tanzania Provision of Construction Supervision Development

44
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
Consultancy Services for Urban Association (IDA)
Infrastructure Development in Mbeya City
under The Tanzania Strategic Cities
Project (TSCP)
292. Korea Engineering Consulting Services for Construction
Papua New
Consultants Corp. Supervision Lae Tidal Basin Project, 2012-14 ADB
Guinea
(KECC), Korea Phase-I
293. Consultancy Services for Project
Readiness Services Towards Integrated
Local Government Urban Development (Sector) Project
Bangladesh Engineering Department (IUDP) under Third Urban Governance 2021-2022 ADB
(LGED) and Infrastructure Improvement (Sector)
Project (UGIIP-III) (Package No: UGIIP-
III/PRS/IUDP/01/2020)
294. Preparing a Comprehensive Feasibility
Department of Forest Study Report of Proposed Bangabandhu
Bangladesh 2021 GOB
(DoF) Sheikh Mujib Safari Park, Lathitila,
Moulvibazar
295. Export Competitiveness for Jobs Project -
Ministry of Commerce of Market Prioritization, Engineering Design
Bangladesh 2020-2024 IDA
Bangladesh and Supervision of Cluster Infrastructure
(PIFIC)
296. Dhaka Transport Consultancy Services for Feasibility Study
Bangladesh Coordination Authority and Conceptual Design of Proposed Bus 2020-2021 GOB
(DTCA) Terminal and Depot
297. Bangladesh Tourism Preparation of Tourism Master Plan of
Bangladesh 2019-21 GOB
Board Bangladesh
298. Widening of approach road and
Bangladesh Forest development of other essential
Bangladesh 2019-2021 GoB
Department (BFD) infrastructure of Bangabandhu Sheikh
Mujib Safari Park, Gazipur, Bangladesh
299. Full-time supervision, design review & as-
built drawing preparation etc. for
Dhaka North City
Bangladesh Improvement of damaged Roads, 2019-2021 GoB
Corporation (DNCC)
Drainage, Footpath and Road Safety of
Different Zones under DNCC
300. Transaction Advisory Services for Design
and Supervision of works at Mirsarai EZ,
Bangladesh Economic
Bangladesh Bangabandhu Sheikh Mujib Shilpanagar 2019-2021 GoB
Zines Authority (BEZA)
under Bangladesh Economic Zones
Development Project (Phase-1), BEZA
301. Feasibility Study of Ramgarh as Well as
Bangladesh Land Port Detail Design of Ramgarh, Bhomra and
Bangladesh 2019-2020 IDA
Authority (BLPA) Benapole Land Ports project (Package
No.: BLPA/S-3, IDA Credit No. 6002-BD)
302. Management Design and Supervision
Bangladesh LGED (MDS) Consultancy Services (Package 2017-2021 ADB
No. UGIIP-III-AF/MDS/02)
303. City Region Economic Development
Investment Program (City Region
LGED
Bangladesh Development Project - II), CRDP - II for 2017-2020 ADB
Preparation, Design and Supervision
(PDS) Consultancy Services
304. The Logistic Condition Survey at Land
Ports for The Data Collection Survey on
Bangladesh JICA Project Team 2017 JICA
Matarbari Port Development in the
People's Republic of Bangladesh
305. TA-9160 BAN: Preparing Information
Bangladesh Hifab International AB Technology Parks for Employment and 2017 ADB
Innovation
306. Bangladesh Economic Pre-Feasibility Study of Bogra and Natore 2017-2018 GoB
Bangladesh
Zones Authority (BEZA) Economic Zone

45
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
307. Support to Capacity Building of
Bangladesh Economic Zones Authority
Bangladesh Economic
Bangladesh (under Private Sector Development 2016 World Bank
Zones Authority (BEZA)
Support Project) - (IDA Credit No. 4866-
BD, DFID Grant No. TF 099730)
308. Local Govt. Engineering TA 39295-032 BAN: Preparing Urban
Bangladesh Governance and Infrastructure 2013-2015 ADB
Department (LGED) Improvement (UGIIP-III)
309. Local Govt. Engineering Preparation of Action Area Plan for
Gazipur City Corporation under
Bangladesh Department (LGED) Preparation of Action Area Plan for 2015-2017 GoB
Narayangonj and Gazipur City Corporation
310. Conservator of Forests, Design, Estimate and Supervision of
Bangladesh Wildlife and Nature Construction for the Bangabandhu Sheikh 2013-2014 GoB
Conservation Circle Mujib Safari Park, Gazipur, Bangladesh
311. Preparation of Master Plan for Kishoreganj
Bangladesh LGED Paurashava Under District Towns 2013-2014 GoB
Infrastructure Development Project
312. Preparation of Municipal Development
Bangladesh LGED Programs (Western Part: Rajshahi, 2012 IDA
Rangpur, Khulna and Barisal Divisions)
313. Preparation of Master Plan for
Pourashavas under Upazila Towns Mar’2008-
Bangladesh LGED GoB
Infrastructure Development Project – Mar’2010
Package No.: 02 (Two) – Mymensingh
314. ADB's TA project "TA-7902-BAN: Climate
Bangladesh AECOM Asia Co. Ltd. Resilient Infrastructure Improvement in 2012 ADB
Coastal Zone Project-1"
315. Bangladesh JICA Traffic Count Survey (Haor Area) 2010-2011 JICA
316. Bangladesh LGED Sustainable Rural Infrastructure Apr-Aug,
ADB
Improvement Project 2010
317. Bangladesh LGED Technical Assistance under Market 2008-2013 GoB
Infrastructure Development Project in
Charland Region (MIDPCR)
318. Bangladesh RAJUK Preparation of Detailed Area Plan for 1999-2007 GoB
Airport-Demra Bypass and its influenced
Area (Location-6)
319. Bangladesh PKSF Impact Evaluation Study of "Financial 2007 GoB
Services for the Poorest Project"
320. Bangladesh Power Cell Generation Support Framework and 2007 Ministry of Power,
Financing Strategy to Implement Least Cost Energy
Inv
321. Bangladesh RAJUK Consultancy Services for Reviewing Land- 2006-2007 GOB
use Plan, Preparation of Various Detailed
Infrastructure and Utility Plans, Detailed
Design of Associated Elements for Jhilmil
Residential Town Project
322. Bangladesh RAJUK Consulting Services for Planning and 2006-2007 GOB
Designing of Various Infrastructural and
Utility Plans and Components with
Ancillary Works for Purbachal New Town
Project
323. Bangladesh Monirampur Pourashava Preparation of Landuse / Master Plan for 1998-1999 GoB
Authority Monirampur Pourashava
324. Bangladesh Bangladesh Railway Preparation of Land use Plan for the 1998-1999 GOB
Railway Land at Chittagong
325. Bangladesh LGED Urban Governance & Infrastructure 2004-2005 ADB
Improvement Project (UGIIP) – Governance
Project Development (GDP) Component
326. Bangladesh ADB Supporting Urban Governance Reform 2004-2005 ADB
(ADB TA No. 4005 BAN)
327. Bangladesh JICA Study Team Topographic and Bathymetric Survey of 2004 JICA
Padma River and River Bank and Approach

46
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
Road along The Proposed Alignment of the
Padma Bridge site at Mawa-Janjira and Sub-
Soil Investigation under Padma Bridge
Feasibility Project (Phase-II)
328. Bangladesh Rupali Bank Ltd. Enterprise Growth and Bank Strengthening 2004 ADB
Project, Financial Advisor for Rupali Bank
Limited, Component: Valuation of
Collaterals of Rupali Bank Ltd.
329. Bangladesh Ministry of Land/GOB Computerization of land record 1997-2002 GOB/MOL
management and administration Project
330. Bangladesh Rajdhani Unnayan Preparation of Detailed Area Plan, DND 1999-2001 GoB
Kartripakkha (RAJUK) North
331. Bangladesh RAJUK Preparation of Detailed Area Plan, Airport- 1999-2001 GoB
Demra bypass Area
332. Bangladesh Ministry of Chittagong Hill Chittagong Hill Tracts Regional 2000-2001 ADB
Tracts Affairs (MCHTA) Development Plan
333. Bangladesh ADB Poverty Impact Study and Land Acquisition 2000 ADB
and Resettlement Plan for the Proposed Gas
Sector Development Project, Bangladesh
334. Bangladesh Ministry of Land Land Administration Reform Project 1998-00 IDA & ADB
335. Bangladesh Char Development & Need Assessment and Preparation of 1999-00 The Netherlands
Settlement Project (CDSP) Proposal to Modernize Land Records and
Processes for Strengthening Capacity of
DC, TNO and AC (Land) Office, CDSP
336. Bangladesh DLRS Modernization of Land Administration 1997-98 ADB
Project (Phase-II)
337. Bangladesh Finance Division, Ministry Financial Advisor for Rupali Bank Ltd. under 2004-05 WB
of Finance, Govt. of Enterprise Growth and Bank Modernization
Bangladesh Project
PORT, HARBOUR AND INLAND WATER WAY
338. Bangladesh BIWTA Architectural Design and Social Impact 2018-2019 WB
Assessment Service for the Project titled
"Feasibility Study for Modernization of Port
Facilities for Khulna, Narshingdi, Barduna
and Development of Galachipa, Mongla,
Meghna, Sunamganj, Tekerghat, Ghorashal,
Kanchpur port, Mojuchowdhuryghat,
Daudkandi-Bausia River Port"
339. Bangladesh BIWTA Inland Waterway Dredging Feasibility 2016 World Bank
Study Bangladesh Trade and Transport
Facilitation Studies RETF Project (BIWTA
Component)
340. Bangladesh Power Cell Technical Advisory to carry out Site Study 2017 IFC
and Basis of Design for the proposed
Onshore LNG Import and Regasification
Terminal at Moheshkhali, Bangladesh
(Phase-I) (Sub-Consultancy)
341. Bangladesh Payra Port Authority Detailed Techno Feasibility Study and 2015 British Fund
Conceptual Master Planning at Payra Port
(Einvironmental and Social Assessment)
342. Bangladesh GTCL Environmental Impact Assessment (EIA) in 2012-13 GoB
favour of Offshore LNG Floating Storage
and Regasification Unit (FSRU) Terminal
permanently moored at Island / Finger Jetty
Activities Project at Maheshkhali area under
Cox's Bazar District
343. Bangladesh Eastern Refinery Ltd. Offshore & Onshore EIA Studies for 2011-12 IDA & GOB
Installation of A Single Point Mooring &
Pipeline System)
344. Bangladesh Chittagong Port Authority Construction of a Container Terminal at 2004-2005 CPA’s own fund.
(CPA) New Mooring, Chittagong, Bangladesh
345. Bangladesh Mongla Port Authority Environmental & Social Impact Assessment 2003-04 GoB
to Support Feasibility Study for
Improvement of Navigability of Mongla Port
346. Bangladesh BIWTA Master Plan for Inland Water Ways Study 1998-89 DGIS
347. Bangladesh Ministry of Shipping Assessment and Verification of 1998 1998 IDA
BIWTA, BIWTC Flood Damages of BIWTA and BIWTC

47
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
348. Bangladesh Ministry of Shipping Design and Coordination Consultancy for 1997-99 IDA
Implementation of the Third Inland Water
Transport Project
349. Bangladesh Royal Danish Embassy Review of Inland Water Transport Sector 1996 DANIDA
350. Bangladesh CPA & MPA Mathematical Model Study of Pashur-Sibsa 1990-92 DANIDA
River System and Karnaphuli River
Entrance
BUILDING
351. Tajikistan Project Implementation Construction and Equipping Number of Saudi Fund for
Unit (PIU), Ministry of Secondary Schools Project, Phese-IV 2018-2021 Development
Education and Science, (Loan No. 10/695) (SFD)
Republic of Tajikistan
352. Tajikistan PIU, Ministry of Construction and Equipment For Schools
Education and Science, Project, Phase-III, Tajikistan 2015-2017 SFD
Republic of Tajikistan (SFD Financing, Loan No. 5/481)
353. Tajikistan PIU, Ministry of Construction and Equipment For Schools
Education and Science, Project, Phase- II, Tajikistan 2009-2014 SFD
Republic of Tajikistan
354. Tajikistan PIU, Ministry of Construction and Equipment For Schools
Education and Science, Project, Phase-I, Tajikistan 2007-2009 SFD
Republic of Tajikistan
355. Tajikistan Ministry of Education, Design and Detailed Engineering for the 2011-13 IDA
Republic of Tajikistan National Testing Center in Dushanbe
356. Tajikistan Ministry of Education, Consultancy Services for Completion of 2004-06 SFD
Republic of Tajikistan Construction and Provision of Equipment
for Three Secondary Schools in Tajikistan
357. Tajikistan Ministry of Education, Reconstruction and Completion of 2000-03 IDB
Republic of Tajikistan Comprehensive Secondary Schools
Project
358. Azerbaijan Social Fund for Accurate Engineering Surveying, Designing, 2007-2009 IDB
Development of IDPs Supervision and Monitoring under the
(SFDI) Project “Construction of Social Infrastructure
Facilities for IDPs in Azerbaijan”
359. Georgia Municipal Development Construction Management and Supervision 2014 USAID
Fund (MDF) of Georgia Services for Rehabilitation Works for IDP
Housing for Six (6) Former Hospital
Buildings and Partial Rehabilitation Works
for Twenty two (22) Collective Centers for
IDP Durable Housing
360. Bangladesh Directorate of Food Design and Engineering Services for the 2020-2021 IDA
Renovation (BMRE) of Ashuganj Wheat
Silo, Ashuganj, Bhahmanbaria (Package
SD-41) under Modern Food Storage
Facilities Project
361. Bangladesh SEIP Project, Finance Consultancy Services for Supervision of 2020-2022 ADB
Division, Ministry of Civil Works for the modernization of the
Finance TTCs, SD-24 Phase II (Bangladesh &
German Technical Training Centre at
Dhaka)
362. Bangladesh IMC Worldwide Ltd. Design and Site Supervision Services for 2018-2020 IDB
the Fael Khair School-cum-Cyclone
Shelters Program for the Victims of the
Cyclone SIDR (Site Supervision Services in
respect of Supervision of Construction
Contract Package - 17) Contract No.: BD1-
0048
363. Bangladesh IMC Worldwide Ltd. Design and Site Supervision Services for 2017-2020 IDB
the Fael Khair School-cum-Cyclone
Shelters Program for the Victims of the
Cyclone SIDR (Survey & Design and
Supervision of Scouts Training Centre Cum
Cyclone Shelter and Survey & Design of 2
Replacement Shelters (Z3-669 & Z3-659) -
Ref. Project No.: BD1-0046
364. Bangladesh Bangladesh Forest Design, Supervision & Monitoring 2015-2017 World Bank
Department (BFD) Consultancy for Field Infrastructure under
Climate Resilient Participatory Afforestation
and Reforestation Project
365. Bangladesh Grontmij GmbH Technical Evaluation of GIZ Office Premises 2015 GiZ - German
Development Coorporation

48
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
366. Bangladesh Asian Development Bank Urban Primary Health Care Sector 2011-12 ADB
Development Project (ADB TA-7655)
367. Bangladesh Yachiyo Engineering Co., Construction Supervision for DCC 2009-10 JICS
Ltd (YEC), Japan Workshop, under the Programme for
Improvement of Solid Waste management
In Dhaka City Toward Low Carbon Society
in The People's Republic of Bangladesh
368. Bangladesh IMC Worldwide Ltd. Survey, Design and Documentation for 2016 IDB
School cum Cyclone Shelter - Z3-669 as
replacement of site Z2-407 under Package
13 and Scout Training Centre cum
Cyclone Shelter under Fael Khair Program
369. Bangladesh IDB Site Supervision Services for Fael Khair 2011-14 IDB
School-Cum-Cyclone Shelters Program for
the Victims of the Cyclone SIDR
370. Bangladesh IMC Worldwide Ltd. Site Supervision Services for The Fael 2014-16 IDB
Khair School-Cum-Cyclone Shelters
Program for the Victims of the Cyclone
SIDR (Supervision of Construction
Packages 11 & 12)
371. Bangladesh Yachiyo Engineering Co., Construction Supervision for DNCC 2013-14 JICA
Ltd (YEC), Japan Warehouse under the Programme for
Improvement of Solid Waste Management
in Dhaka City Toward Low Carbon Society
in the People's Republic of Bangladesh
372. Bangladesh Ministry of Food & Construction of a Concrete Grain Silo at 2011-16 Japan Debt
Disaster Management of Mongla Port with Facilities (50,000 MT Cancellation Fund
the GoB Capacity) (JDCF)
373. Bangladesh Japan International Co- Construction of Solid Waste Management 2008 JICA & Dhaka City
oparation Agency (JICA) (SWM) Office at Word No. 56, 63,69 & 76 Corporation (DCC)
374. Bangladesh Japan International Co- Construction and Renovation of Solid Waste 2009 JICA & DCC
oparation Agency (JICA) Management (SWM) Office at Word No.
5,7,9, 42 , 49,50,53
375. Bangladesh United Nations Civil Works Construction Supervision 2009-10 UNDP
Development Consultants (CSC) Services for
Programme (UNDP) Construction of Core Family shelter P-II
376. Bangladesh Yachiyo Engineering Co. The Programme for Construction of 2008 JICA
Ltd., Japan Multipurpose Cyclone Shelters In The Area
Affected By The Cyclone SIDR (Survey,
Investigation and Design)
377. Bangladesh Yachiyo Engineering Co. The Programme for Construction Of 2008 -2010 JICA
Ltd., Japan Multipurpose Cyclone Shelters in the Area
Affected by the Cyclone SIDR (Construction
Supervision & Defect Liability Inspection)
378. Bangladesh CBSMC Shopping, Commercial & Islamic Centre at 2002-03 CBSMC
Chawk Bazar
379. Bangladesh DOF Preparation of Plan, designs, estimates, 1998-00 IDA & ADB
supervision and soil testing of civil works at
different places of coastal area division
380. Bangladesh Style Apartment Ltd. Style Aspire, An Apartment Complex 1997-00 Style Apartment Ltd.
381. Bangladesh BETS Planning, Detail Design, Cost Estimating & 1995-99 BETS
Construction Supervision of BETS Centre
382. Bangladesh Directorate of Family Repair/renovation of Clinic building and 1997-99 UNFPA
Planning, GoB construction of MO/FWV quarter at 18
MCWCs
383. Bangladesh DCC Supervision of Construction of Dholaikhal 1996-97 WB
Pump Station (Credit TA VI, 2393 BD)
384. Bangladesh Style Apartment Ltd. Feasibility Study and Preliminary Design of 1996-97 City View
City View Apartment cum Shopping Centre Apartment Ltd.
385. Bangladesh Directorate of Family Assessment of Repair/Renovation of 8 1996 UNFPA
Planning Maternal and Child Welfare Centres (MCWC)
386. Bangladesh T & T Board Preparation of Master Plan, Detail Design & 1984-89 GOB
Construction Supervision of Telephone &
Telegraph Exchange Building
387. Bangladesh Biman Bangladesh Detail Design and Construction Supervision 1978-79 GOB
of Biman Poultry Complex, Phase-I&II

49
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
ENERGY AND POWER SECTOR
388. Tajikistan Ministry of Energy, Construction of Mini Hydro Power Plants 2005-07 IDB
Tajikistan in Rural Areas of Tajikistan
389. Afghanistan Ministry of Energy and Farah Rud Irrigation and Hydropower 2006-07 Govt. of
Water, Afghanistan Project Afghanistan
390. Pakistan Govt. of Pakistan Feasibility Study of Turkmenistan- 2004 ADB
Afghanistan-Pakistan Natural Gas Pipeline
Project II, ADB TA-6153-REG
391. Bangladesh Sustainable & Feasibility Study of 40MW Solar Power 2020 IFC
Renewable Energy Plant in Kushtia
Development Authority
392. Bangladesh Bangladesh Petroleum Hiring of Drill Stem Testing (DST) & 2020-2021 GOB
Exploration and Surface Testing Services (Lot-1) and DST
Production Company Services Supporting Spares for (Lot-2)
Limited (BAPEX) Zakiganj #1 Exploratory Well of Rupkalpa
#2 Drilling Project of BAPEX under Cash
Foreign Exchange
393. Bangladesh Dhaka Power Distribution Consultancy Services for Replacement of 2019-2020 GoB
Company Limited Existing Distribution System by
(DPDC) Underground Distribution Network System
394. Bangladesh Dhaka Electric Supply Design, development & installation of 2019-2024 GoB
Company Limited multi-platform GIS based application for
(DESCO) the management of distribution network of
DESCO for technical, financial and
managerial benefits
395. Bangladesh Dhaka Power Distribution GIS (Geographical Information System) 2017-2018 GoB
Company Limited Based Distribution Network System and
(DPDC) Preparation of a 20 Years Master Plan for
DPDC
396. Bangladesh Bangladesh Rural Consultancy Services for Preparation of a 2018-2019 IDA
Electrification Board Master Plan for the Rural Electrification
(BREB) (RE) Program in Bangladesh for BREB
397. Bangladesh BPDB ADB TA-8839 BAN: Study on Energy 2015-16 ADB
Security (48277-004)
398. Bangladesh ICF Consulting India Gas Market Assessment – Bangladesh 2017 ICF
Private Limited
Rehabilitation and Expansion of Existing
Supervisory Control and Data Acquisition
(SCADA) System of National Gas Grid
399. Bangladesh GTCL 2014-17 JICA
under GTCL (Component B of Bheramara
Combined Cycle Power Plant
Development Project)
Sylhet Gas Fields Ltd Drillstem Testing and Production Testing
Services with equipment for Drilling of 1
400. Bangladesh (SGFL) appraisal cum development oil/gas well 2014-15 GoB
(KTL-7) at Kailashtilla structure of SGFL
401. Bangladesh GTCL Installation of Natural Gas Compressor 2012-14 GoB
Stations at Ashuganj and Elenga
402. Bangladesh CPTI Agency Agreement with CPTI International 2011-13 CPTI
Inc.
403. Bangladesh HTSPE Limited, UK Evaluate the Rural Maintenance 2008 HTSPE Limited,
Programme (RMP-Phase-III) UK
404. Bangladesh BGFCL Drill Stem Testing-Group: A (drilling of one 2010 GOB
new well at Bakhrabad gas field). Group: A
(Workover / Recompletion of Two Nos.
Existing Well at Bakhrabad gas field)
405. Bangladesh Sylhet Gas Field Ltd. Drill Stem Testing & Production Testing 2006 GOB
Services for Kailashtilla Gas Field Well #
5&6
406. Bangladesh PGCB Construction of 230KV Transmission Lines 2004-07 ADB
and Substations under West Zone Power
System Development Project
407. Bangladesh BPDB Detailed Feasibility Study & Environment 2005-06 GOB
Impact Assessment of Haripur 150MW
CCPP Project

50
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
408. Bangladesh Nexant, USA TA # 4379-BAN: Power Sector 2005 ADB
Development Program II
409. Bangladesh Wood Mackenzie Preparation/Development of Gas Sector 2005 WB
Master Plan and Strategy for Bangladesh
410. Bangladesh USAID Improved Performance of Bangladesh’s 2002-04 USAID
Energy Sector (Individual Contract)
411. Bangladesh SUMMIT Industrial & Topographical and Bathymetric Surveys 2004 Private
Mercantile Corporation and Geotechnical Investigations of the
Project Site for 450 MW Combined Cycle
Power Plant at Sirajganj
412. Bangladesh BPDB Corporatization of Ashuganj Power Station 2001- 03 ADB
(ADB TA Project), Phase-I & II
413. Bangladesh PA Consulting Services Improved Performance of Bangladesh 2002-03 World Bank
Inc. Energy Sector
414. Bangladesh BPDB Meter Reading & Other Operational 1999-00 GOB
Activities of Sales & Distribution Division
1,2,3 under BPDB, Khulna
415. Bangladesh BPDB Identification, Verification, Valuation & 2000 BPDB
Recording of Fixed Assets and Stores of
all Unit under Regional Accounting Office
(RAO), Chittagong Electric Supply, BPDB,
Chittagong
416. Bangladesh BPDB Identification, Verification, Valuation & 2000 BPDB
Recording of Fixed Assets and Stores of all
Unit Offices under the payment jurisdiction of
Regional Accounting Office (RAO), Sikalbaha
Power Station, BPDB, Shikalbaha
417. Bangladesh PGCB Resettlement Action Plan (RAP) for 1999 GOB, ADB
Hasnabad-Amin Bazar (Savar)-Tongi (50
km) and Haripur-Meghnaghat (10 km) 230
kV Transmission line project under Dhaka
Power System upgrade project.
418. Bangladesh Petrobangla Fourth Natural Gas Development Project 1997-98 ADB
419. Bangladesh Petrobangla Safety and Efficiency Improvement in 1995-96 ADB
Bangladesh Gas Sector
420. Bangladesh Bangladesh Oil, Gas and The Maddhapara Hard Rock Mining Project 1989 OECF
Mineral Development
Corporation
ENVIRONMENT
421. Bangladesh HR Wallingford, IEE for Karnaphuli River Study Project
2021- GOB
Consultant of CPA under "Details Hydrologic & Hydraulic 2022
Study in the Karnaphuli River"
422. Conducting the Environmental and Social
Impact Assessment (ESIA) of the 2021-
Bangladesh Fiber@Home Limited 2022 Private
Expansion of Fiber@Home's Network
Infrastructure Project.
423. Bangladesh Environmental Impact Assessment (EIA)
JICA Survey Team (ROAD) under JICA Preparatory Survey 02/2018-
(PADECO Co. Ltd.) 08/2018 JICA
for the Matarbari Port Development in
Bangladesh
424. Bangladesh JICA Survey Team Resettlement Action Plan (RAP) (ROAD)
(PADECO Co. Ltd.) 02/2018- JICA
under JICA Preparatory Survey for the 08/2018
Matarbari Port Development in Bangladesh
425. Bangladesh Consultancy Services for Conducting
Karnaphuli Gas Environmental Impact Assessment (EIA)
Distribution Company study of Small Scale LNG Floating 01/2018-
Limited (KGDCL) 03/2018 GoB
Storage and Re-gasification Unit (FSRU)
moored at KAFCO/CUEL Jetty on the
bank of Karnaphuli River in Chittagong.
426. Bangladesh JICA Survey Team Environmental Impact Assessment (EIA) 2017-2018 JICA
(PADECO Co. Ltd.) under JICA Preparatory Survey for the
Matarbari Port Development in Bangladesh

51
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
427. Bangladesh JICA Project Team Strategic Environmental Assessment 2017 JICA
(SEA) under JICA Data Collection Survey
on the Matarbari Port Development in
Bangladesh
428. Bangladesh JICA Survey Team Resettlement Action Plan (RAP) under 2017-2018 JICA
(PADECO Co. Ltd.) JICA Preparatory Survey for the Matarbari
Port Development in Bangladesh
429. Bangladesh Haor Infrastructure and Environmental Impact Assessment (EIA) 2013-14 GoB
Livelihood Improvement for HILIP Project Areas Compaising 28
Project (HILIP), LGED
Haor Upzilas of 5 Districts
430. Bangladesh Acorn International Scoping Environmental and Social 2016 IDA
Aspects: Liquefied Natural Gas Floating
Storage and Regasification Unit and
import terminal infrastructure, Moheshkhali
Island, Bangladesh
431. Bangladesh Tokyo Electric Power Planning and Design on Access Road for 2013 JICA
Services Co. Ltd Preparatory Survey on Chittagong Area
(TEPSCO)
Coal Fired Power Plant Development
Project in Bangladesh (JICA Study)
432. Bangladesh Oriental Consultants Co, Environmental Impact Assessment (EIA) 2013-14 JICA
Ltd. and Abbreviated Resettlement Action Plan
(ARAP) Studies for Selected Gas
Transmission Pipeline Projects of GTCL
under the Preparatory Survey on the
Natural Gas Efficiency Project in the
Peoples Republic of Bangladesh.
433. Bangladesh IPFF Project Cell, Consulting Services for Engagement of 2014-15 World Bank
Bangladesh Bank Environment Monitoring Consultant for
Investment Promotion and Financing
Facility (IPFF) Project under Package #
S19 (A1)
434. Bangladesh Bangladesh Technosity Conducting Environmental and Social 2016 BTL
Limited (BTL) Impact Assessment (ESIA) of Kaliakoir
High Tech Park
435. Bangladesh Acorn International Regulatory Review for Liquefied Natural 12/2015 Acorn
Gas Floating Storage and Regasification International
Unit and import terminal infrastructure,
Moheshkhali Island, Bangladesh
436. Bangladesh Sylhet Gas Fields Ltd. Conduct Integrated Environmental Impact 2012 SGFL
Assessment (EIA) Study for (a) 5000 BPD
capacity Condensate Fractionation Plant
(CFP) with Catalytic Reforming Unit (CRU)
and (b) 1500 BPD capacity Catalytic
Reforming Unit (CRU) at Rashidpur to
convert Petrol into Octane at Kamaichera,
near Railway Station at Upazilla-Bahubol,
District-Hobigonj.
437. Bangladesh Sylhet Gas Fields Ltd. Environmental Management Plan (EMP) 2012 GoB
Study for 10 (Ten) Existing Plans of Sylhet
Gas Fields Limited.
438. Bangladesh Gas Transmission Environmental Impact Assessment (EIA) 2017 GoB
Company Limited of Offshore LNG Floating Storage and Re-
(GTCL) gasification Unit (FSRU) moored at STL
(Submerged Turret Loading) Project,
Maheshkhali, Cox’s Bazar
439. Bangladesh GTCL Environmental Impact Assessment (EIA) in 2012-13 GoB
favour of Offshore LNG Floating Storage
and Regasification Unit (FSRU) Terminal
permanently moored at Island / Finger Jetty
Activities Project at Maheshkhali area under
Cox's Bazar District

52
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
440. Bangladesh GTCL Environmental Impact Assessment (EIA) 2011-12 GoB
study along the selected route of the
proposed Gas transmission pipeline from
Jalalabad to Danua via Bibiyana
441. Bangladesh GTCL Environmental Impact Assessment (EIA) 2011-12 GoB
study along the selected route of the
proposed Gas transmission pipeline from
Moheshkhali to Anowara
442. Bangladesh Bangladesh Agricultural Agro-Environmental Impact Assessment 2011 GoB
Development (AEIA) and Determination of Water
Corporation (BADC) Logged Area of South of the Padma River
(Faridpur, Rajbai and Gopalgonj Districts)
443. Bangladesh Eastern Refinery Ltd. Onshore Surveys (FEED & PMC for 2011-2013 IDB
Installation of a SPM and Pipeline System)
444. Bangladesh Eastern Refinery Ltd. Offshore & Onshore EIA studies for 2011-2013 IDA & GOB
installation of a Single Point Mooring &
Pipeline System
445. Bangladesh BAPEX Environmental Impact Assessment of 2011 GOB
Sundalpur Gas/Oil Exploration.
446. Bangladesh Sylhet Gas Field Ltd. Environmental Management Plan (EMP) 2007-08 GOB
(SGFL) Study for Drilling of Wellsat Kailashtilla
Gas Fields Well no 3 & 4
447. Bangladesh DWASA Environmental Management Framework 2007 IDA
(Package DS-5)
448. Bangladesh TULLOW Bangladesh Provision of Additional Environmental 2010-2012 TULLOW
Ltd. Monitoring Services
449. Bangladesh TULLOW Bangladesh Environmental Monitoring Services of TBL 2010 TULLOW
Ltd. at Bangora, Comilla.
450. Bangladesh TULLOW Bangladesh Conducting EIA for Gopalnagar to 2008 TULLOW
Ltd. Bangora Gas Gathering Pipeline
451. Bangladesh Titas Gas Transmission Seminar (Foreign Training), Environmental 2007 TGTDCL
and Distribution Co. Ltd. & Safety Issues in Pipeline Design and
(TGTDCL) Construction
452. Bangladesh Lafarge Surma Cement Monitoring of Environmental and Social 2006-10 Lafarge Surma
Limited. Performance of Lafarge Surma Cement Cement Limited.
453. Bangladesh Ontario Centre for Bangladesh Environmental Technology, 2006 CIDA
Environmental Technology Verification-Support to Arsenic Mitigation
Advancement (OCETA) (BETV-SAM) Project
454. Bangladesh NIPPON KOEI CO., LTD Rendering Services for Data collection for 2006 JBIC
the JBIC Environmental Profile Study in
the Republic of Bangladesh
455. Bangladesh PGCL Environmental Impact Assessment (EIA) 2006 GoB
for Construction of Gas Distribution
Network at Rajshahi City and its Adjoining
Areas
456. Bangladesh GTCL IEE, EIA and RP for Construction of 2006 GoB
Bheramara-Khulna (165Km.) Gas
Transmission Pipeline
457. Bangladesh BGFCL Procurement of Environmental Services 2006 GoB
for Drilling and Workover/Recompletion of
8 wells at Titas and Bakhrabad gas fields
and Installation of Gas Process Plants at
Titas Gas field
458. Bangladesh GTCL IEE and EIA, RP of Bonpara-Rajshahi (50 2004 GoB
Km) Gas Transmission Pipeline - Group B
459. Bangladesh GTCL Preparation of IEE, EIA, RP report on 2004-05 GOB
West Bank of Jamuna Bridge- Nalka-
Hatikamrul- Bonpara- Ishwardi- Bheramara
Gas Transmission Pipeline Project (Group-
A) and Bonpara-Rajshahi Gas
Transmission Pipeline Project (Group-B)

53
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
460. Bangladesh BSCIC Conduct “Initial Environmental Examination 2005 GOB
(IEE) and Environmental Impact Assessment
(EIA) of Central Effluent Treatment Plant
(CETP) and other Industrial Installations in
the Proposed Tannery Estate, Dhaka
461. Bangladesh UNOCAL Baseline Environmental Study on Seismic 2004 UNOCAL
Program at Block 12 Area
462. Bangladesh UNOCAL Environmental Impact Assessment - 2003-04 UNOCAL
Moulavi Bazar Development (Group-1 &
Group-2)
463. Bangladesh GTCL IEE, EIA & RP on Ashugonj-Monohordi Gas 2003-04 WB
Transmission Pipeline
464. Bangladesh GTCL IEE, EIA & RP of Proposed Nalka-Bogra 2003-04 WB
Gas Transmission Pipeline
465. Bangladesh GTCL IEE, EIA & RP of Proposed Monohordi- 2003-04 WB
Elenga-East Bank of Jamuna Bridge Gas
Transmission Pipeline
466. Bangladesh AQMP, DOE Diesel Engine Maintenance Improvement 2004 IDA
Clinics
467. Bangladesh Shell Hydrocarbons Initial Environmental Examination (IEE) & 2003 SHH
Holdings B.V. (SHH) Environmental and Social Assessment
(ESA) For Blocks 5 & 10
468. Bangladesh Shell Hydrocarbons Environmental Impact Assessment (EIA) 2003 (SHH)
Holdings B.V. (SHH) and Baseline Study (BLS) of Blocks 5 & 10
469. Bangladesh JBIC JBIC Chittagong Study 2003 JBIC
470. Bangladesh OCETA Environmental Technology Verification- 2003 CIDA
Arsenic Mitigation Program-Field Testing of
AM Technologies (ETV-AM Field Testing)
471. Bangladesh Titas Gas T&D Co. Ltd. Environment and Social Impact 2001-02 GOB
Assessment of Bangabandhu Bridge
Approach Road Gas Pipeline Project
472. Bangladesh BAPEX Environmental Impact Assessment (EIA) 2001-02 GOB
for Installation of a Gas Process Plant,
Condensate Fractionation Plant and 10
Km. 10 Inch dia Gas Pipeline Project at
Fenchuganj Gas Field
473. Bangladesh LGED Study for Rural Development Focusing on 2001-02 JICA
Flood Proofing in Bangladesh, 2001
474. Bangladesh TGTDCL Environmental and Social Impact 2002 ADB
Assessment for Construction of Gas
Pipeline and other Installations under
Dhaka Clean Fuel Project (TGTDCL Part)
475. Bangladesh WB Promotion of Environmental Management 2000-01 UNDP
Systems (EMS: ISO 14001) Project
476. Bangladesh Shell Bangladesh Report on the Massive Death of Marine 2000-01 Shell Bangladesh
Turtles
477. Bangladesh Rural Power Company EIA Study of Mymensingh Combined 2001 KFW
(RPC) Cycle Gas Turbine Power Plant
Conversion Project
478. Bangladesh MARUBENI EIA study of Meghnaghat Combined Cycle 2001 GoB
Gas Turbine Power Plant (Phase II)
Project
479. Bangladesh Bangladesh Road Urban Transport and Environmental 2001 ADB
Transport Corporation Improvement Project
480. Bangladesh Shell Bangladesh Social Impact Assessment (SIA) of 2000-01 Shell Bangladesh
Exploration & Magnama-1, Block-16, Offshore Kutubdia
Development B.V. Island
481. Bangladesh Shell Bangladesh Air Quality Test in Dhaka City (Lead 2000-01 Shell Bangladesh
Sampling)
482. Bangladesh Okland Oil Company Environmental Monitoring of EIA for Reju-1, 1999-00 Okland Oil
Offshore Exploration Drilling Well in Block 17 Company
483. Bangladesh Petrobangla Consultancy Services for Development of 1997-00 Government of
an Environment and Safety Management Bangladesh
System in Petrobangla

54
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
484. Bangladesh Shell Bangladesh Social Impact Assessment of Block 15 2000 Shell
Exploration & (SANDWIP) & Stakeholder Identification of Bangladesh
Development B.V. Block 5 & 10 (Bhola & Sundarban)
485. Bangladesh Shell Bangladesh Environmental Impact Assessment (EIA) 2000 Shell Bangladesh
Exploration & for 3D Seismic (4C/3D) Acquisition over
Development B.V. Sangu Field in Block 16
486. Bangladesh Hussain Chemical Initial Environmental Examination (IEE) on 2000 Private Financed
Complex Granular Single Super Phosphate of
Hussain Chemical Complex
487. Bangladesh UNDP Environmental Impact Assessment (EIA) on 2000 UNDP
the Industrial Activities (Tanneries and
Other Industries) at Hazaribag Area
488. Bangladesh CWASA Preparation of IEE, EIA and EMP for 1999 GOB
Proposed Madunaghat Surface Water
Treatment Plant of CWASA
489. Bangladesh GTCL Implementation of Environmental and Social 1999 GTCL
Management Plan for Gas Supply to Western
Zone (Elenga to Baghabari) Project
490. Bangladesh Okland Oil Company EIA for Reju-1 Offshore Exploration Drilling 1999 Okland Oil
Well in Block 17 Company
491. Bangladesh Occidental IEE & EIA of Jalalabad Well Cluster Pad 1998-99 Occidental
(Well# 5)
492. Bangladesh PGCB Environmental Impact Assessment for 1999 ADB
Hasnabad-Amin Bazar (Savar)-Tongi (50
km) and Haripur-Meghnaghat (10 km) 230
kV Transmission line project under Dhaka
Power System upgrade project
493. Bangladesh Ministry of Env. & Forest Ecological Survey Project 1998-99 GOB
494. Bangladesh GTCL Environmental Safety and Social Impact 1998 WB
Assessment (ESSA) for Gas Supply to
Western Zone Project
495. Bangladesh Occidental Hillside Improvement Programme – 1998 Occidental
Reconnaissance Survey for Jalalabad Gas
Field at Drill Pads, Access Roads, Gas
Treatment Plant Site
496. Bangladesh Cairn Energy PLC Post EIA for Halda Drilling Operations 1998 Cairn Energy PLC
497. Bangladesh Occidental Environmental Impact Assessment for 2D/3D 1998 Occidental
Seismic Survey
498. Bangladesh Mott MacDonald (UK) IEE and EIA of Haripur Barge Mounted 1998 Mott MacDonald
Mott Ewbank Preece (UK) Power Station
499. Bangladesh DOE Coastal and Wetland Biodiversity 1998 GEF
Management Project
500. Bangladesh DOE The Socio-Economic Survey for the Coastal 1998 GEF
and Wetland Biodiversity Management
(CWBM) Project
501. Bangladesh BTC Effluent Treatment Plant of Bangladesh 1997-98 BTC
Tobacco Co. Ltd. Dhaka Factory
502. Bangladesh JICA/NJS Environmental Impact Assessment (EIA) for 1997 JICA
North Dhaka Sewerage
503. Bangladesh DWASA Initial Environmental Examination (IEE) of 1997 JICA
North Dhaka Sewerage
504. Bangladesh DCC Preliminary Environmental Impact 1997 GOB
Assessment for Gulshan Banani Lake
Development
505. Bangladesh Bangladesh Fertilizers & Initial Environmental Examination (IEE) of 1995 Private Financed
Agrochemicals Ltd. Fertilizers and Agro-chemicals Project
506. Bangladesh ADB Socio-Environmental Assessment of 1994 ADB
Meghna Dhonagoda Irrigation Project
ECONOMIC & SOCIAL STUDIES, HRD & INSTITUTIONAL DEVELOPMENT
507. Afghanistan Asian Development Bank TA-9396 AFG: Second Support for 2020 ADB
(ADB) Infrastructure Investments and Policy -
Social Safeguard Capacity Development
Expert (51173-001)
508. Tajikistan Tax Committee Consultancy services on Strengthening 2009 IDA
The Government of the Human Capital and Institutional Capacity
Republic of Tajikistan

55
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
509. Bangladesh World Bank Consultancy Service for ‘Bangladesh: 2021 World Bank
Options for Institutional and Regulatory
Reforms in the Electricity Sector’
510. Bangladesh Bangladesh Rural Gender Action Plan Implementation 2019-2021 ADB
Electrification Board Services for Solar Photovoltaic Pumping for
(BREB) Agricultural Irrigation
511. Bangladesh Bangladesh Bridge Consultancy Services for Carrying Out 2018-2019 GoB
Authority (BBA) Household Survey (with B-D) under
Feasibility Study and Preliminary Design for
Construction of Dhaka Subway Project
512. Bangladesh LGED Mid-Term Outcome Survey including Result 2018 IFAD
and Impact Management System (RIMS)
Study under Coastal Climate Resilient
Infrastructure Project (CCRIP)
513. Bangladesh LGED Consultancy Services for Operational Audit 2017 IDA
under Municipal Governance and Services
Project (MGSP) Contract Package No.:
MGSP/PMU/S-14
514. Contract for Governance Improvement
and Capacity Development (GICD)
Bangladesh LGED Consulting Services under Northern 2015-2019 JICA
Bangladesh Integrated Development
Project (NOBIDEP)
515. Resource Mapping of Selecting Beels
through PRA and Professional
Bangladesh LGED Documentation, Mapping and Printing 2016 JICA
under Beel Development Activities of
HFMLIP (RM 01 – RM 04)
516. Conducting Evaluation Study on the
Completed Project titled "Secondary
Bangladesh IMED, Ministry of Planning 2016 GoB
Towns Integrated Flood Protection
(Phase-2)" Project - BWDB part
517. Final Technical Inspection of Financial
Bangladesh KfW Cooperation Projects - Field Visits to 2017 KfW
SRIIP, RIIP and CRDP projects
518. Bangladesh LGED-SSWRD (JICA) Baseline Study for Impact Assessment of 2010-12 JICA
Small Scale Water Resources
Development Project in Greater
Mymensingh, Sylhet and Faridpur Areas.
519. Bangladesh Ministry of Labor and Consulting Services for Conducting 2014-16 World Bank
Employment (MOLE) Baseline Survey under Northern Areas
Reduction of Poverty Initiative (NARI)
Project (Contract Package # MOLE-S11)
520. Bangladesh Dept. of Livestock Monitoring & Evaluation-Base Line 2011-12 GoB/WB/IDA
Services, Krishi khamar Survey, Mid-term Evaluation & End of
Sharak, Farmgate, Project Evaluation (S-9), Avian Influenza
Dhaka-1215, Bangladesh Preparedness and Response Project
521. Bangladesh Social Development Baseline Survey of SIPP Additional Sep 2009 – IDA
Foundation (SDF) Financial and SIPP-II Aug 2010
522. Bangladesh SRIIP, LGED Socio-economic Baseline Survey for SRIIP-3 May 2010 – ADB
Jul 2010
523. Bangladesh Bangladesh Garment Study on the present Power Supply Jul 2008 – Gtz
Manufacturers & Exporters Situation and Its Impacts on the Feb 2009
Association (BGMEA) Readymade Garment Sector in
Bangladesh
524. Bangladesh LGED, GRDIRDP Hiring Professionals / consultants to execute Apr 2010 IDA
soft components under Greater Rajshahi
District Integrated Rural Development project
525. Bangladesh LGED Participatory Rural Appraisal (PRA) for 2011-2014 GoB
Proposed Sub-projects under Participatory
Small Scale Water Resources Sector Project
(PSSWRSP)
526. Bangladesh ADB Consumer Survey for Performance May 2009- ADB
Evaluation of Third Natural Gas Development Jun 2009
Project & Ninth Power Project

56
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
527. Bangladesh Social Development Consulting Services on Preparation of Sep 2009 – WB
Foundation (SDF) Environmental and Social Safeguard Feb 2010
Framework
528. Bangladesh UNDP Baseline Survey of the Urban Partnerships 2010 IDA & GoB
for Poverty Reduction Project (UPPR)
529. Bangladesh International Labour Research study on “The Informal Sector of 2005 ILO
Organisation (ILO) Employment in Bangladesh, and how this
sector could be Mobilized to Eliminate Worst
Forms of Child Labour and Increase Job
Opportunities.
530. Bangladesh DFID Support for Rural Livelihoods Programme in 2003-06 DFID
Bangladesh
531. Bangladesh Rural Electrification Board Socio-economic Monitoring and Impact 2004-05 World Bank
(REB) Evaluation of Rural Electrification and
Renewable Energy Program in Bangladesh
532. Bangladesh LGED Second Small Scale Water Resources 2003-05 ADB
Development Sector Project for Forming,
Establishing functioning WMCAs and Assist
LCS Activities
533. Bangladesh Japan Engineering Co. Study on Multipurpose Cyclone Shelter 2003 JICA
Project in Feni, Cox’s Bazar, Chittagong
534. Bangladesh CARE, Bangladesh Consultancy Services to Conduct “Socio- 2002 USAID
economic Baseline Survey” for the BUILD
Component under the Integrated Food
Security Program (IFSP) of CARE-
Bangladesh
535. Bangladesh World Bank Assessment of Procurement Management 2006 World Bank
Capacity and Its Institutionalization
536. Bangladesh DAE Baseline Survey /Participatory Rural 2001 IFAD
Appraisal (PRA)/ for Agricultural
Development Support to Adivashi and Char
land Areas for SAIP of DAE
537. Bangladesh LGED Performance and Financial Audit Services 2006-07 ADB
(PFAS) on Emergency Flood Damage
Rehabilitation Project
538. Bangladesh LGED The Third Rural Infrastructure Development 1999-03 ADB, SIDA, IFAD
Project (Institutional Support) & OECF
539. Bangladesh Rural Electrification Board Socio-Economic Monitoring and Impact 2004-05 IDA
(REB) Evaluation of Rural Electrification and
Renewable Energy Program in
Bangladesh under Bangladesh Rural
Electrification and Renewable Energy
Development Project
540. Bangladesh BWDB Tarail - Pachuria Flood Control, Drainage 1998 GOB
and Irrigation Project, Phase-I
541. Bangladesh BWDB Khulna - Jessore Drainage Rehabilitation 1995-98 ADB
Project (Beneficiary Participation)
AGRICULTURE & LIVESTOCK
542. Bangladesh Ministry of Agriculture Consultancy Services for Design, 2012-16 IDB
(MoA) through BADC Management and Supervision of the
Enhancing Quality Seed Supply Project
543. Bangladesh IAPP, Ministry of Consulting Services for Impact 2016 GoB
Agriculture Assessment of Integrated Agricultural
Productivity Project (IAPP)
544. Bangladesh Project Coordination Unit National Agricultural Technology Project 2012-13 IDA
(PCU), BARC Complex (NATP): Phase-1, Concurrent Monitoring
& Evaluation
545. Bangladesh Agriculture Extension Mid-Term Evaluation of the Agricultural 2011 DANIDA
Component (AEC) Extension Component, ASPS-II
546. Bangladesh Department of Livestock Assessment of Impact of Smallholder 2006 DANIDA
Services Livestock Development Project (SLDP 2)
in Five Southern Districts, Bangladesh
547. Bangladesh Department of Conducting Participatory Rural Appraisal 2004 GOB
Agricultural Extension (PRA) in Integrated Agriculture
(DAE) Development Project in Greater Sylhet
District Including Orange and Pineapple

57
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
Development
548. Bangladesh FAO Conducting Survey for Collection of Field 2004 IFAD
Level data for NOPOEST and LIFE Projects
549. Bangladesh BADC Expansion of Irrigation Through Utilization 2001-04 GOB
of Surface Water by Double Lifting (1st
Phase)
550. Bangladesh ADIP, DAE Evaluation of Participating NGO of 2004 IFAD
Agriculture Diversification and
Intensification Project
551. Bangladesh European Commission (EC) Strengthening of Livestock Information 2002 ADB
Brussels, Belgium Services (SLIS), Mid Term Review Mission
552. Bangladesh SANYU Consultant Inc. JICA Study for Rural Development 2001 JICA
Japan Focusing on Flood Proofing (Survey on
Agriculture and Water use), 2001
553. Bangladesh DAE Netrakona Integrated Agricultural 1997-99 IFAD
Production and Water Management Project
(Component : On-farm research)
554. Bangladesh DAE A special study on Potentials and 1999 IFAD
Constraints of Oilseeds Production in
Netrokona
555. Bangladesh BWDB Khulna - Jessore Drainage Rehabilitation 1995-98 ADB
Project (Component : Agricultural
Development)
556. Bangladesh Begum Gulchemonara Pre-feasibility Study of Patiya- 1997 Begum
Welfare Trust Chandanaish- Satkania-Lohagara Gulchemonara
Integrated Flood Control, Irrigation and Welfare Trust
Rural Development Project
INFORMATION MANAGEMENT SECTOR
557. Tajikistan PMU, Municipal Preparation of Service Delivery 2007-2009 WB
Infrastructure Development Program and Management
Development Project Improvement Program
558. Tajikistan Barki Tojik (Tajik TA 3601-TAJ Introduction of International 2001-02 ADB
Electricity Board) Accounting Standards at Barki Tojik
559. Bangladesh Power Cell ICT Roadmap for the Power Sector in 2016-2017 IDA
Bangladesh. (Sub-consultancy)
560. Bangladesh Directorate General of Development of Food Grain Movement 2014-15 GoB
Food, Ministry of Food Manual, Least Cost Route, Stock in Transit,
Movement Programming Software and
Reviewing of Godown and Transit Loss
561. Bangladesh Ministry of Science and Establishment of South Asia Sub-regional May’11 to- ADB
ICT Economic Cooperation (SASEC) date
Information Highway Project (BD Part)
562. Bangladesh Asian Development Bank TA-7604 BAN: Supporting Governance 08 Oct’12 to ADB
Management Project for Directorate of 31 Dec’15
Land Records and Surveys (DLRS)
563. Bangladesh Ministry of Local Developing a National Management 2010-11 GOB
Government, Rural Information System (MIS) for Water
Development & Supply and Sanitation in Bangladesh
Cooperatives
564. Bangladesh Bangladesh Bureau of Digital Information System Project 2012-13 GoB
Statistics (BBS)
565. Bangladesh PCI, Japan Management Information Acquisition 2004 JICA
under the Project Solid Waste
Management in Dhaka City
566. Bangladesh Textile Strategic Unit, Consulting Services on Preparation of 2002 IDA
Ministry of Textile Annual MIS Report for 2000-01 & 2001-02
and Development of Database for Textile
Sub-sector from 1972-73 to 2001-02
567. Bangladesh Petrobangla Installation of Local Area Network (LAN) 2002 DFID
Facilities in Petrobangla Head Office
568. Bangladesh DLRS Computer Based Khatian & Map Printing 1995-01 GOB
System Modernisation Project (Pilot-1)
569. Bangladesh DLRS Computer Based Khatian & Map Printing 1998-99 GOB
System Modernisation Project (Pilot-2)
570. Bangladesh BTTB Digital Data Network of Bangladesh 1999 GOB
Telegraph & Telephone Board (BTTB)

58
FUNDING
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD
AGENCY
571. Bangladesh (NMIDP), DAE Installation of NMIC Software at 55 district 1998 EEC
offices of the DAE & Related Training
572. Bangladesh NMIDP Database Management System Software 1997 CEC
for National Minor Irrigation Census (NMIC)
CAD, GIS & MODELING
573. Bangladesh LGED GIS Based Property and Infrastructure 2017-2018 IDA
Asset Management Systems (GIS-PIAMS)
Consultancy Services under Municipal
Governance and Services Project
(MGSP): Contract Package No.: S-06
574. Bangladesh Chittagong Development Development of Web Based GIS 2015-2016 GoB
Authority (CDA) Application System for Land Use Map of
Chittagong Metropolitan Master Plan Area
575. Bangladesh BAPEX Establishment of X, Y, Z Coordinates in 2002-03 BAPEX
Companyganj Area, Comilla
576. Bangladesh DLRS Computer Based Digital Mapping and 1995-02 GOB
Khatian Printing System (Pilot-1) and
Hardware Maintenance Project
577. Bangladesh Ministry of Env. & Forest Preparation of GIS Based Ecological Maps 2000 GOB
578. Bangladesh Bangladesh Railway Preparation of Land use Plan for the 1998-99 GOB
Railway Land at Chittagong
579. Bangladesh Mott MacDonald Preparation of Point Elevation Digital 1997 Mott MacDonald
Coverage Maps for Cyclone Shelter
Preparatory Study
EDUCATION AND TRAINING SECTOR
580. Tajikistan Barki Tojik (Tajik TA 3601-TAJ Introduction of International 2001-02 ADB
Electricity Board), Accounting Standards at Barki Tojik
Republic of Tajikistan
581. Tajikistan Ministry of Education, Consultancy Services for the ADB Loan 2006 -09 ADB
Republic of Tajikistan No. 2053-TAJ (SF): Education Sector
Reform Project
582. Tajikistan PMU, Farm Privatization Training Program on “Micro Credit” for 2005 WB
Support Project, Tajik Participants
Tajikistan
583. Tajikistan Foreign Investment and “Assistance in Formulating Courses Based 2005-06 IDB
International Financial Institutions
on Banking Services” under Capacity
Department, National Bank of
Tajikistan (NBT) Building Technical Assistance
584. Cambodia National Bank of A diagnostic assessment of the Cambodian 2007 ADB
Cambodia Payment and Settlement System, and the
project to upgrade Information Technology
in the National Bank of Cambodia (TA 4835-
CAM: Preparing the Financial Sector
Development Program)
585. Bangladesh LGED Consulting Services for Capacity 2019-2022 World Bank
Development of LGIs and LGED under
Digitizing Implementation Monitoring and
Public Procurement Project (DIMAPPP)
(Contract No. LGED/S-04)
586. Bangladesh Canadian Petroleum GTCL Professional Executive Training 2011 CPTI
Training Institute (CPTI) Program
587. Bangladesh Primary Stipend Education Mid-Term Evaluation/Assessment of 06/2011- GoB
Project Primary Stipend Education Project (PESP) 09/2011
588. Bangladesh Primary and Mass ADB, TA, Primary Education Sector 02/2010- ADB
Education Division (PMED) Development Program (PESDP) 08/2010
589. Bangladesh Directorate of Primary Study on Comprehensive Assessment / 2006 GOB
Education Evaluation of the Primary Education
Stipend Project (PESP)
590. Bangladesh Victoria University, BETS – Victoria Program 1999-04 Victoria University,
Australia Australia
591. Bangladesh Directorate of Primary Impact Study on C-in-Ed Training of PTT 2003 IDA
Education under the Directorate of Primary Education
of PMED
592. Bangladesh Australian Youth Australian Youth Ambassador for 2001-03 AUSAID
Ambassadors for Development Program (AYADP) – in-
Development Program, Country Management for Bangladesh (ICM
Australia 04/06/01B)
593. Bangladesh Bureau of Manpower Survey of In-plant Training-a Component of 1994 UNDP/ILO
Employment & Training National Vocational Training System
Reform (UNDP/ILO Project BGD93/010)

59
60
61
62
63
64
65
66
Global Network of
BETS Consulting Services Ltd.

67

You might also like