Professional Documents
Culture Documents
:
PASSAGE PLAN REVISION:
REVISION DATE:
POSITION AND DISTANCE CHECKLIST
PAGE:
VOY NO.
PASSAGE FROM: TO: ✔
LEG FROM DISTANCE DISTANCE DISTANCE MINIMUM
COURSE
NO. POSITION / WAYPOINTS (Nm) MADE (Nm) TO GO (Nm) UKC (m)
11
CHARTS REQUIRED:
SIGNED DATE
FORM NO.:
PASSAGE PLAN REVISION:
REVISION DATE:
CHECKLIST
PAGE:
12
Weather Conditions Comprehensive l
Abnormal Waves ENCs is unsuitab
Current and Tides
Heavy Weather
Ice
Swell
Tropical Storms
Visibility
Weather Routing
Winds
Contingencies
Emergency Anchorages
Emergency Response Plans (SMPEP/NTVRP/PCRP/EM'CY MAP)
Notification and Reporting
Abort Position 13 ECDIS VOYAGE
Anchor Clearance
Plan Amendments
1.1
Other 1.2
Bridge Equipment incl. flags, whistle, etc. fully operational
Calling Procedures Marked (Calling the Master & Engine Room, etc.)
All Required Bridge Checklist Ready Available
1.3
Risks Assessment 1.4
Risks Assessment(s) carried out 1.5
1.6
1.7
CHARTS TO BE USED (ENC and/or paper) 1.8
1.9
2.1
2.2
2.3
FORM NO.:
PASSAGE PLAN REVISION:
REVISION DATE:
POSITION AND DISTANCE CHECKLIST
PAGE:
COMPREHENSIVE LIST OF AREAS NOT COVERED BY APPR. ENCs (if applicable)
ehensive list of appropriately scaled ENCs to cover the voyage, backed up by paper charts where coverage of
s unsuitable. 2.4
2.5
2.6
The methods to be used for cross-checking are b
etc. It is important for the Navigator to practice al
signal quality should be monitored continuously.
VOYAGE CHECKLIST ( Refers to DOC.02 ECDIS Procedure) 02-05 Handing over the watch
02-06 Navigation in Heavy Weather
02-07 Navigation in Ice
S63 ENC Charts with Permit for entire voyage available in the ECDIS catalogue? 02-08 Navigation in Restricted Visibilit
S63 ENC Charts updated? (via Passage Manager or DVD) 02-10 Navigation in Coastal Water
(Check for the Display and Approve dates: In order to display charts with correct & up-dated situation. Always use 02-13 Preparation for Anchoring
current date during the voyage. If the voyage will be more than one week, apply the current date to Chart Viewing
Date at least once a week during the voyage. Departure:
Voyage not covered by appropriately scaled ENC (see 14) 02-09 Preparation for Sea
Speed entered, taking into account navigational hazards and vessel characteristics 02-20 Master Pre-Departure Checklist
Turn Over Radius for each Alteration (if applicable) 02-10 Navigation in Coastal Water
User Charts and Notes created and/or updated for the voyage?
Containing for example the following items: Arrival:
Pilot reporting points, Mandatory reporting points, Point of No-return for narrow passage, Contingency Anchorages, 02-10 Navigation in Coastal Water
No-Go-Areas (Using Channel and User Danger Areas in User Charts), 02-11 Preparation for Port Arrival
Conspicuous Targets for Position Fixing and Cross-Checking references, Parallel Index (If applicable) 02-21 Master Pre-Arrival Checklist
Especially if not entered in the ENC by the ENC Producer 02-16 Master Pilot Checklist
Chart Alert used for planning and monitoring the route
(Some ECDIS might merge areas please sea manual) 15 CHECKING AND APPROVA
User Chart Danger, Areas to be avoided, Traffic Separation Zone, Inshore Traffic Zone, Restricted Area, Caution 1) Prepared and checked by
Area, Offshore Production Area, Seaplane Landing Area, Submarine Transit Area, Anchorage Area, Marine Farm, Navigating Officer (Name/Si
PSSA Area (Please cross-out not active areas) Date and Time
Is the route prepared using safe setting for Draft, Safety Contour and Depth Contours in compliance with 2) Checked by another Offic
Company UKC (which includes the Chart Inaccuracy*) and with due regard to Squat effect (including Trim Navigating Officer (Name/Si
and Heel)? *See K other Passage Plan - UKC- Assessment Date and Time
Safety Contour Settings 3) Reviewed by the master a
UKC, AIR DRAUGHT
Safety Contour for planning: Plan Authorized, Load
Master (Name/Signature)
Safety Contour Voyage/Monitoring: Date and Time
4) Acknowledgement
Is it planned to change the safety contour during the passage? Yes No Navigating Officer (Name/Si
Date and Time
If yes, please enter the new value: New Safety Contour Monitoring: m Navigating Officer (Name/Si
Date and Time
FORM NO.:
PASSAGE PLAN REVISION:
REVISION DATE:
CHECKLIST
PAGE:
Please specify where the safety contour will be changed: 5) Alteration of Passage Pla
Voyage plan checked together with user chart and notes using the voyage specific safety contour.
1. Visual check at completion scale (LEGs, the route and the XTD are clear of potential hazards.
2. Route checked with the ECDIS auto check mode, Warnings checked.
Voyage Plan, Notes and User Chart switched to monitoring mode?
ECDIS is receiving a reliable GPS's position? (Cross-checked)
d for cross-checking are by all other means avaible such as visual cross bearing, radar position by range and bearing, Radar Overlay, Parallel Index,
he Navigator to practice all traditional navigational skills and not to be overly confident in the information from the ECDIS. During the voyage the GPS
monitored continuously.
: Departure:
paration for Sea 03-33 Detailed Risks Assessment - Mooring and Unmooring
ster Pre-Departure Checklist 03-31 Detailed Risks Assessment - Port Departure
OT CARD 03-39 Detailed Risks Assessment - Pilot Boarding
ster pilot checklist 03-34 Detailed Risks Assessment - Coastal Navigation
ot-Embark-Disembark
vigation in Coastal Water
Arrival:
vigation in Coastal Water 03-34 Detailed Risks Assessment - Coastal Navigation
paration for Port Arrival 03-30 Detailed Risks Assessment - Port Arrival
ster Pre-Arrival Checklist 03-39 Detailed Risks Assessment - Pilot Boarding
OT CARD 03-33 Detailed Risks Assessment - Mooring and Unmooring
ot-Embark-Disembark
ster Pilot Checklist
avigational Officer and approved by the Master prior commencing the voyage or leaving a berth.
and attached to every passage plan see form 02-18 Passage Plan.
STRICTIONS
Yes (see Form 02-18) Seawater Freshwater The intended route takes into account the
activities which could cause damage to the envir
VE BUNKERS and other consumables
7 RESTRICTIONS (Port entry and berth re
Fuel Oil High Sulphur MGO
or the intended passage ARRIVAL
rve required
ed NIL DAY
before departure
to be taken (Planned) DEPARTURE
C DRAUGHT
STATION NAME
INFORMATION / LANDMARKS & LIGHTS/TIDAL INFORMATION
irections
ghts and Fog Signals (Areas)
adio Signals
es
s NAVTEX Stations selected
onal warnings 9 PILOTAGE
ns
es Embarkation /
Disembarkation
ns have been up-dated accordingly to week 51.
FORM NO.:
PASSAGE PLAN REVISION: PA
REVISION DATE:
CHECKLIST
PAGE:
AISAL
acy and reliability of aids of navigation
acy and reliability of chats and hydrographic data
riate scale charts for ocean, coastal, harbour and berthing
to port entry
Lights
Area Warnings, Navtex (Up-to-date and inserted in the chart/ECDIS)
REA Warnings
harts and licenses ordered as appropriate prior voyage
to Mariners including T&Ps
ng Charts
Radio Signals
ng and load line charts
directions and pilot books
ables and tidal stream atlases
AGE REQUIREMENTS
ing locations
ecial ship operational requirements for the passage
calculations
and any special stowage / carriage restrictions
t restrictions including air draught and UKC requirements
pter operations
ne requirements
ok requirements
ge reporting requirements
n Fixing intervals (incl. visual, radar fixing, Usage of LOP
lity of propulsion and steering systems or any known defects affecting navigation or control of
ng and reporting measures
Contours
Depths
y Concerns
-ship transfers
h and stability
schedules
l Index
ent Navigation and Radar Marks
No-go areas
l targets and lights
g lines and bearings
s, heading marks and leading lines
peed and necessary speed alterations
stance off
e of machinery status
ng/high density traffic areas
n where the echo sounder should be activated
FORM NO.:
PASSAGE PLAN REVISION:
REVISION DATE:
Lists of Waypoints PAGE:
From: To: SEA PASSAGE
Route name in ECDIS: Position Fixing ECDIS Remarks Leg
Parallel Index Min. Charted Min. Depth/ Safety Watch Relevant Information not "General"
Leg RL/ Waypoint Distance Speed (kts) XTD Turn
Course Information Depth (m) UKC (m) Interval Primary Second. Contour Type
No. GC Latitude Longitude Name of Waypoint (Nm) P/Stb Radius Setting
Vessel: Date:
Vessel: Date:
Appr. Port /
SEA Anchorage Berth
Status Fairway
Company UKC 20% 10% 10% 0.3
A Name/Number of Leg
Appr. Channel Width
B Vessels Maximum Draft (m)
Water Density (T/cu.m.)
C Allowance for water density (m)
D Allowance for heel (m)
Actual Speed at Passage
E Calculated Squat at Passage (m)
F Sea state effects (m)
G Deepest Draught (m)
1
SQUAT EFFECT IN METERS
0.8
0.6
0.4
0.2
0
0.8 1 1.2 1.4 1.6 1.8 2
SPEED IN KNOTS
#REF! #REF!
Cb x V2 2 x Cb x V2 Displacement
Squat= Squat in confined waters= Cb=
100 100 LxWxH
This page is for your convenience and is not required to be printed or added otherwise to Passage Plan.