100% found this document useful (2 votes)
2K views39 pages

Engineering Deliverables

The document provides an overview of engineering deliverables for an AWP project including: - Plot plans showing containment areas and work packages - Piping and instrumentation diagrams - Engineering equipment lists, schedules, and 3D models - Vendor data and digital drawings for piping, structures, and equipment work packages - Documents register and revisions log to track engineering documents

Uploaded by

COE PROJETOS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views39 pages

Engineering Deliverables

The document provides an overview of engineering deliverables for an AWP project including: - Plot plans showing containment areas and work packages - Piping and instrumentation diagrams - Engineering equipment lists, schedules, and 3D models - Vendor data and digital drawings for piping, structures, and equipment work packages - Documents register and revisions log to track engineering documents

Uploaded by

COE PROJETOS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Plot Plans with CWAs / CWPs
  • P&IDs
  • Engineering Lists
  • Schedule e EWPs
  • 3D Model Exports
  • Vendor Data
  • Digital Pipe Isometrics
  • Digital Structural Details
  • Documents Register
  • Digital EWPs
  • Advanced Revisions Log

AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


AWP-DT.24

AWP Control Index, Constraint Management & Predictive Analytics


P&IDs
AWP-DT.02 Engineering Lists
Master Project Schedule w EWPs
Estimating / Procurement / Progress Quality /
Schedule
Cost Controls Site Materials Tracking Completions 3D Model Exports
AWP-DT.03
AWP-DT.15 AWP-DT.25 AWP-DT.26
Vendor Data
AWP-DT.14 AWP-DT.27
AWP-DT.28
Digital Pipe Isometrics
AWP-DT.01 Digital Structural Details
Concept Plant Layout AWP-DT.04
AWP-DT.17 Structural
Virtual Work Package Documents Register
Equipment Lists AWP-DT.05 Detailing
Development
AWP-DT.18
Digital EWPs
AWP-DT.06
Instrument Lists AWP-DT.13 Steel Fabrication
Advanced Revisions Log
AWP-DT.07
Piping Lists
AWP-DT.19 Pipe Isometric
Virtual Construction Detailing
3D Plant Design AWP-DT.08
Model Assembly
AWP-DT.20
Pipe Fabrication
Civil / Structural Lists AWP-DT.09
AWP-DT.21 Modular Design
Electrical Lists AWP-DT.10
Detailing

AWP-DT.22
Other Engr Data AWP-DT.11 AWP-DT.16 AWP-DT.23 Module Fabrication

AWP-DT.12

Suppliers Document Contractors


Management
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables

CWA ID Picture Title Work Scope Summary Plot Plans with CWAs / CWPs

CWA01 Tank DA-50 • Demo piping around G-10 & G-11 P&IDs
• Install new pipe lines, filters, instruments, power & controls Engineering Lists
• Insulate piping & equipment
Schedule w EWPs
• Tie-in DA-50 to existing Pz 168 Lot Tanks 174/175
• Tie-in loading from DA-50 to loading line from Tanks 81 & 82 3D Model Exports
Vendor Data
CWA02 Tanks 39-81 & 82 • Demo piping, level switches & temp transmitters Digital Pipe Isometrics
• Reuse/relocate product filter, pump(s), isolation valves(?),
Digital Structural Details
level transmitter & relief(s)
• Install new equipment including 2+ pumps, a product filter Documents Register
along with associat3ed piping, instruments, power & controls Digital EWPs
• Tie-in headers at pipe bridge and E-W pipe rack locations,
as well as loading / unloading header run Advanced Revisions Log

CWA03 Tank D-5 • Demo exiting piping and equipment around Tanks D -5/8
• Install new equipment including feed pump, loading pump
motor (vertical), product filter
• Install and insulate piping for Tank 5 and associated
equipment
• Install instruments, power & controls

CWA04 Scrubbers • Prepare foundations and grade, lay concrete pads for scrubbers
• Install portable scrubbers, in designated locations
• Install piping to support scrubbers
• Install instruments, power & controls
• Insulate equipment and associated piping
AWP Primers – Engineering Deliverables

Engineering Deliverables List – Plot Plans with CWAs / CWPs Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
Critical Input to CWA, CWP, EWP Index Table XLS Draft at POC1, and finalize shortly after
Schedule w EWPs
Plot Plan Files with Marked up CWAs PDF Draft at POC1, and finalize shortly after 3D Model Exports

Work Scope Bullet List by CWA / CWP XLS Draft at POC1, and finalize shortly after Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables

CWP -- AT.1191-CWA01-406X-440A-CON-01
Plot Plans with CWAs / CWPs
Demo piping around G-10 & G-11, except for check & isolation valves
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables

CWP -- AT.1191-CWA01-406X-440A-CON-01 Planned Start:


Plot Plans with CWAs / CWPs
Demo piping around G-10 & G-11, except for check & isolation valves 07-Feb-2018
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables

Engineering Deliverables List – P&IDs Plot Plans with CWAs / CWPs


P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
PFD (Process Flow Diagrams) Drafts for Early Planning PDF FEL1 & 2
Schedule w EWPs
P&IDs for Review, Marked-up where possible to 3D Model Exports
PDF P&ID Pass 1 Through 3
indicate scope of work
Vendor Data
P&IDs at IFAs PDF Finalize process design at Pass 4 P&IDs Digital Pipe Isometrics
P&IDs at IFC PDF With EWP IFC Release Digital Structural Details
Documents Register
Index of P&IDs XLS At issue of P&IDs from Pass 1 to Pass 4
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Equipment List - Data Field Definitions
Field Name
Tag Item Number
Rev
Construction Status
Definition
Equipment Tag number designation
Revision of Equipment Design
The code to specify if the equipent is new, existing and refurbished or modfied.
Technical Requirements
Y
Y
Y
Digital Structural Details
Spec Equipment Specification number Y
P&ID Piping and Instrument Diagram drawing the equipment is on Y
CWA Construction Work Area the Equipment is located Y after CWA identified
System
Skid
Req Number
PO Number
Manufacturer
Commissioning & Start-UP System Identified for the equipment tag
Skid tag number the equipment is part of.
Requisiton Number
Purchase Order Number
Manufacturer of the equipment i.e. Dresser Rand, Hughes Anderson etc
Y after System identified
N
Y after Req issued
Y after PO issued
N
Documents Register
Weight Erection Weight of the equipment Y
Weight UOM Unit of Measure Erection Weight Y
Responsible Discipline Responsible Discipline for the equipment N
Equipment Location Plan
Motor Tag
Support Drawing
Grout Drawing
Location Drawing i.e (B01-xxxx-yyyyy)
Tag of the Motor on Equipement..i.e Pump Compressor
Support Drawing Number
Grout Drawing Number
N
Y if a motor exists
N
N
Digital EWPs
Grounding Drawing Grounding Drawing Number N
Electrical Drawing Electrical Drawing Number N
Paint Code Required Paint Spec number. Designates color and specific mill thickness requirements Y if paint required
Insulation Class (Shell)
Insulation Class (Channel)
Tracing Code
Fireproof Code
Type of Insulation on Shell Side of Tube Heat Exchanger
Type of Insulation on Tube Side of Tube Exchanger
Heat Tracing Code ID that specifies the type of heat tracing required
Heat Tracing Code ID that specifies the type of fireproofing required
Y if insulation required
Y if insulation required
Y if tracing required
Y if fireproofing required
Advanced Revisions Log
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports

Equipment List - Data Field Definitions Vendor Data


Field Name Definition Technical Requirements Digital Pipe Isometrics
Tag Item Number Equipment Tag number designation Y
Rev Revision of Equipment Design Y
Digital Structural Details
Construction Status The code to specify if the equipent is new, existing and refurbished or modfied. Y Documents Register
Spec Equipment Specification number Y
P&ID Piping and Instrument Diagram drawing the equipment is on Y Digital EWPs
CWA Construction Work Area the Equipment is located Y after CWA identified
System Commissioning & Start-UP System Identified for the equipment tag Y after System identified Advanced Revisions Log
Skid Skid tag number the equipment is part of. N
Req Number Requisiton Number Y after Req issued
PO Number Purchase Order Number Y after PO issued
Manufacturer Manufacturer of the equipment i.e. Dresser Rand, Hughes Anderson etc N
Weight Erection Weight of the equipment Y
Weight UOM Unit of Measure Erection Weight Y
Responsible Discipline Responsible Discipline for the equipment N
Equipment Location Plan Location Drawing i.e (B01-xxxx-yyyyy) N
Motor Tag Tag of the Motor on Equipement..i.e Pump Compressor Y if a motor exists
Support Drawing Support Drawing Number N
Grout Drawing Grout Drawing Number N
Grounding Drawing Grounding Drawing Number N
Electrical Drawing Electrical Drawing Number N
Paint Code Required Paint Spec number. Designates color and specific mill thickness requirements Y if paint required
Insulation Class (Shell) Type of Insulation on Shell Side of Tube Heat Exchanger Y if insulation required
Insulation Class (Channel) Type of Insulation on Tube Side of Tube Exchanger Y if insulation required
Tracing Code Heat Tracing Code ID that specifies the type of heat tracing required Y if tracing required
Fireproof Code Heat Tracing Code ID that specifies the type of fireproofing required Y if fireproofing required
AWP Primers – Engineering Deliverables

Engineering Deliverables List – Engineering Lists Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Mechanical Equipment List XLS Throughout project at specified frequency Engineering Lists
Piping Line List XLS “ ” Schedule w EWPs
Instrument Index XLS “ ” 3D Model Exports
Cable Schedule XLS “ ”
Vendor Data
Electrical Equipment List XLS “ ”
Lighting & Devices List XLS “ ” Digital Pipe Isometrics
Conduit & Trays List XLS “ ” Digital Structural Details
Grounding List XLS “ ”
Documents Register
Electrical Heat Trace Schedule XLS “ ”
Pilings List XLS “ ” Digital EWPs
Modules Index XLS “ ” Advanced Revisions Log
Foundations Index XLS “ ”
Primary Structures Index XLS “ ”
Secondary Structures and Supports XLS “ ”

Engineering Lists Demarked at Key Stages of Design PDF / XLS 30%, 60%, 90% Design Reviews

Engineering Lists Demarked at IFC PDF / XLS With EWP IFC Releases

Engineering List Revisions PDF / XLS At issue of P&IDs from Pass 1 to Pass 4
AWP Primers – Engineering Deliverables

Path of Construction Working Sessions


Plot Plans with CWAs / CWPs
POC 1 POC 2 P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Path of Construction Development Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Level 2 CWAs, CWPs, Level 3 Schedule Documents Register
Schedule by EWPs, by CWAs, CWPs,
Discipline TOPS EWPs & PWPs Digital EWPs
Advanced Revisions Log

Define Refine Finalize


Refine
Refine
(baseline)

Schedule Development

Interactive
Planning
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
CWP P02.03A.01
CWA 03A Install Large Bore Pipe in CWA 03A
AWP Primers – Engineering Deliverables

The following checklist facilitates backward pass alignment of the engineering EWP with this CWP: Plot Plans with CWAs / CWPs
P&IDs
❑ List the target engineering deliverables for this CWP (this forms the EWP)
❑ Identify baseline ‘delivery’ date required for the EWP in order to allow the CWP (and requisite purchase and Engineering Lists
material delivery) to proceed according to schedule Schedule w EWPs
❑ List all input dependencies to the EWP deliverables 3D Model Exports
❑ Identify latest possible ‘Need Dates’ for the input dependencies in order to be able to meet the required Vendor Data
EWP delivery date Digital Pipe Isometrics
❑ Incorporate the EWP into the overall EWP Delivery plan, along with the target ‘Delivery Date’ and Input Need Digital Structural Details
Dates for the input dependencies
Documents Register
❑ Track and iterate with recurring reporting of EWP Delivery Plan and EWP Constraints out from the
responsible engineer for the EWP Digital EWPs
Advanced Revisions Log
CWP P02.03A.01
CWA 03A Install Large Bore Pipe in CWA 03A
AWP Primers – Engineering Deliverables

Engineering Deliverables List – Schedule with EWP Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
Sample Export of Engineering Schedule and WBS XLS After POC 1 and before POC 2
Schedule w EWPs
Documentation on project Schedule WBS and Column 3D Model Exports
PDF After POC 1 and before POC 2
configuration for CWPs, EWPs, etc …
Vendor Data
Periodic Exports during Schedule Development PDF / XLS Following Engineering IAP Session Digital Pipe Isometrics
Baseline Schedule of Engineering after IAP PDF / XLS Following Engineering IAP Session Digital Structural Details
Documents Register
Routine Export of Engineering Schedule Progress PDF / XLS Bi-Weekly from Start of Detailed Design
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


Smart
E3D Plant
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports

3D Plant Design Vendor Data


Digital Pipe Isometrics
Revit Model Processing
Digital Structural Details
Documents Register
Digital EWPs
Plant design models Advanced Revisions Log
provide the basic
input for AWP
automation tools for
3D work package
development.
AWP Primers – Engineering Deliverables

Engineering Model Attributes Plot Plans with CWAs / CWPs


P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Pipe System Attributes Pipe Part Level Attributes
Name/Tag*(e.g. /QV-1100620; Documents Register
ISO Number*
/TRUNNION/3P10-1265)
Line Number Digital EWPs
Area /Unit* CWA (e.g. 01)
CWA CWP Advanced Revisions Log
CWP ISO Number* (e.g. /3P10A/80-DMW-110-00013-
Module 013470Z-N-01)
Bore Size 1* Line Number
Bore Size 2 Bore Size 1*
Bore Size 3 Bore Size 2
Schedule* Bore Size 3
Fluid Code Sched 1
From Sched 2
To Sched 3
PID* Pressure Rating 1
Specification* Pressure Rating 2
Phase Pressure Rating 3
Test Pressure* Specification (e.g. /013470Z/PP3-0000LL_1)
Test Type* Commodity Code (e.g. /013470Z/VLAJ4-
Insulation Type F1L270000LL_1)
Insulation Thickness Description* (e.g. Globe Flg, BS 1873, RF, 150 Lbs,
Painting Spec Bolted Bonnet, Trim No.: 12, Acc. to API 600, 602, -,
Heat Tracing Swivel Plug Disc, Stem: O.S./..)
Notes Material* (e.g. ASTM A351 Gr. CF8M)
AWP Primers – Engineering Deliverables

Engineering Deliverables List – Schedule with EWP Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
NWD /
Sample export of 3D plant design model VUE + XLS
After POC 1 and before POC 2
Schedule w EWPs
Documentation on project 3D plant design model 3D Model Exports
PDF After POC 1 and before POC 2
organization, component types and attribution Vendor Data
NWD / Digital Pipe Isometrics
Routine export of 3D plant design model VUE + XLS
Bi-Weekly from Start of Detailed Design
Digital Structural Details
NWD /
3D model export demarked at key stages of design VUE + XLS
30%, 60%, 90% Design Reviews Documents Register
Digital EWPs
3D model export demarked at IFC of one or more NWD /
At EWP(s) IFC Release
EWPs VUE + XLS Advanced Revisions Log
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
Engineering Deliverables List – Vendor Data Deliverables Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
Index of Equipment Vendors, Parts and Materials As vendors are selected for bid inquiry or PO
XLS Schedule w EWPs
Suppliers award on the project
3D Model Exports
Supplier information on ETA (Estimated Time of
XLS Updated daily or weekly
Arrival) for planned shipments Vendor Data
Updated as vendor document deliverables are Digital Pipe Isometrics
List of documents associated with the equipment,
XLS added to the PO line items and further Digital Structural Details
materials or parts with status on design / approvals identified post PO award
Documents Register
List of 'Ship Loose' parts and part container / boxes Updated as vendor shipment lots and ‘ship
XLS Digital EWPs
associated with the primary equipment or p loose’ materials are identified post PO award
Advanced Revisions Log
List of 'Spares' parts associated with the primary Updated as vendor shipment lots and ‘ship
XLS
equipment or part loose’ materials are identified post PO award
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details

Digital Pipe Documents Register


Digital EWPs
Isometrics Advanced Revisions Log
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log

Page 1 or 2 Page 2 or 2

https://www.alias.ltd.uk/pcf.asp
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log

Critical to understand if pipe spool


demarcation is done by engineering or
separate detailing shop with fabrication scope
AWP Primers – Engineering Deliverables

Engineering Deliverables List – Digital Pipe Isometrics Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
IDF / PCF
Sample digital pipe isometric files
Before Issuance of IFC EWP
Schedule w EWPs

List of digital isometrics with EWP Release XLS At IFC Release of EWP(s) 3D Model Exports
Vendor Data
PDF files +
Set of digital isometrics with EWP Release IDF / PCF At IFC Release of EWP(s) Digital Pipe Isometrics
files
Digital Structural Details
Technical support to include AWP requirements in XLS / DOC Documents Register
At Inquiry Issue for fabrication contracts
pipe fabrication contracts for delivery of digital data / PDF
Digital EWPs
Set of ‘modified’ digital isometrics with from detailing PDF files +
Advanced Revisions Log
provided if spool demarcation is included in fabricator IDF / PCF Upon detailing of isometric by fabricator
scope of work files
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
Critical to request digital Engineering Lists
structural detail models from
steel fabricator, by CWA Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log

http://dcom.arch.gatech.edu/aisc/idm/process_map
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log

https://www.caddigest.com/3-new-releases-for-tekla-users/
AWP Primers – Engineering Deliverables

Engineering Deliverables List – Digital Structural Details Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
Technical support to include AWP requirements in
XLS / DOC Schedule w EWPs
steel fabrication contracts for delivery of digital data / PDF
At Inquiry Issue for fabrication contracts
for structural detailing and fabrication tracking 3D Model Exports
IFC Vendor Data
Sample digital structural details files BIMSTeel Before Issuance of steel fabrication contracts
Digital Pipe Isometrics
files
Digital Structural Details
Digital structural detailing file(s) exported from 3D
IFC Documents Register
steel detailing application (Tekla or equivalent) BIMSTeel Upon detailing of isometric by fabricator
http://dcom.arch.gatech.edu/aisc/content/em11_final_steel_detailing_model
files Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables

Authorized Plot Plans with CWAs / CWPs


Tier 1 Contract
P&IDs
Engineering Lists
Work in Progress
Work in design
Non-verified Progress Schedule w EWPs
Work
data and in Progress
documents Shared Published Client Archive
Non-verified design 3D Model Exports

Authorized
used by in-house

Approved
dataNon-verified
and documentsdesign Non-verified design Validated design Project history

Verified
design
usedteams
databy
and only
documents
in-house data and documents output for use by maintained for Vendor Data
used
design by in-house
teams only used by in-house Project Team, suitable knowledge,
design teams only design teams only for Tender and regulatory and legal Digital Pipe Isometrics
Construction. requirements.
Digital Structural Details
Documents Register
Approved Digital EWPs
Advanced Revisions Log

Work in Progress
Specialist design
Work in Progress
teams,
Specialist
fabricators
design

Authorized
andteam,
construction
Specialist
fabricators
design
contractors
and
team,
specialty
fabricators
contractors
and specialty
contractors
AWP Primers – Engineering Deliverables

Engineering Deliverables List – Documents Register Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
CWA Engineering Lists
Schedule w EWPs
3D Model Exports
CWP
CWP CWP
CWP
CWP Vendor Data
Dwg 1
Predecessor Digital Pipe Isometrics
Dwg 2 Work Scope Successor TOP 1
Work Scope Digital Structural Details
Dwg 3 Requisite
Drawings Documents Register
EWP
CWP CWP
CWP TOP 2 Digital EWPs
Advanced Revisions Log
Dwg x
Work
Sequences
IWP 1
PO 1 TOP x
PO 2 IWP 2
PO 3
PWP
CWP
CWP
CWP
Requisite
PO x Materials IWP x
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
CWP Engineering Lists
CWP boundaries define the EWP EWP deliverables roll-into the CWP Schedule w EWPs

External 3D Model Exports


EWP
CWP CWP
Engineering
Vendor Data
Digital Pipe Isometrics
Interfacing
Work Scope
Interfacing
Work Scope
TOP 1 Digital Structural Details
Documents Register
EWP
Engineering
TOP 2 Digital EWPs
Deliverables
Advanced Revisions Log
Material
Requisition
Requests
Drawings
Specifications
TOP x
Engineering Analyses PO 1
Material Requirements
PWP
CWP PO 2
CWP
Vendor Data CWP PO 3
Construction Requirements
Turnover Requirements

PO x
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables

Engineering Deliverables List – Digital EWPs Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
Routine publishing of advanced revision log
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables

Plot Plans with CWAs / CWPs


P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables

Advanced Revision Plot Plans with CWAs / CWPs


Notices P&IDs

1 Detect IWPs Engineering Lists


Engineering 3 2
To Update Schedule w EWPs
Changes
3D Model Exports
Drawings Issued for
Construction Assemble Release IWPs Vendor Data
into IWPs to Build
WFP Digital Pipe Isometrics
Field
Team Crews Digital Structural Details
Field Documents Register
Change
Documents Digital EWPs
Notices
& Drawings Advanced Revisions Log
Report
4 Status of
IWPs

1 Issue Advanced Revision Notices / Holds once engineering determines a design / drawing change is underway.

Immediately notify field supervision where IWP are released to build. Escalate notifications where
2 work has been started.

3 Provide weekly report for WFP Team to update IWPs that are not yet released to build.

4 Provide status information back to engineering on IWP Plans.


AWP Primers – Engineering Deliverables

Engineering Deliverables List – Advanced Revisions Log Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
On demand when revisions / holds are
Routine publishing of advanced revision log XLS
assessed to impact construction Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log

You might also like