Engineering Deliverables
Engineering Deliverables
AWP-DT.22
Other Engr Data AWP-DT.11 AWP-DT.16 AWP-DT.23 Module Fabrication
AWP-DT.12
CWA ID Picture Title Work Scope Summary Plot Plans with CWAs / CWPs
CWA01 Tank DA-50 • Demo piping around G-10 & G-11 P&IDs
• Install new pipe lines, filters, instruments, power & controls Engineering Lists
• Insulate piping & equipment
Schedule w EWPs
• Tie-in DA-50 to existing Pz 168 Lot Tanks 174/175
• Tie-in loading from DA-50 to loading line from Tanks 81 & 82 3D Model Exports
Vendor Data
CWA02 Tanks 39-81 & 82 • Demo piping, level switches & temp transmitters Digital Pipe Isometrics
• Reuse/relocate product filter, pump(s), isolation valves(?),
Digital Structural Details
level transmitter & relief(s)
• Install new equipment including 2+ pumps, a product filter Documents Register
along with associat3ed piping, instruments, power & controls Digital EWPs
• Tie-in headers at pipe bridge and E-W pipe rack locations,
as well as loading / unloading header run Advanced Revisions Log
CWA03 Tank D-5 • Demo exiting piping and equipment around Tanks D -5/8
• Install new equipment including feed pump, loading pump
motor (vertical), product filter
• Install and insulate piping for Tank 5 and associated
equipment
• Install instruments, power & controls
CWA04 Scrubbers • Prepare foundations and grade, lay concrete pads for scrubbers
• Install portable scrubbers, in designated locations
• Install piping to support scrubbers
• Install instruments, power & controls
• Insulate equipment and associated piping
AWP Primers – Engineering Deliverables
Engineering Deliverables List – Plot Plans with CWAs / CWPs Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
Critical Input to CWA, CWP, EWP Index Table XLS Draft at POC1, and finalize shortly after
Schedule w EWPs
Plot Plan Files with Marked up CWAs PDF Draft at POC1, and finalize shortly after 3D Model Exports
Work Scope Bullet List by CWA / CWP XLS Draft at POC1, and finalize shortly after Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables
CWP -- AT.1191-CWA01-406X-440A-CON-01
Plot Plans with CWAs / CWPs
Demo piping around G-10 & G-11, except for check & isolation valves
P&IDs
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables
Engineering Deliverables List – Engineering Lists Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Mechanical Equipment List XLS Throughout project at specified frequency Engineering Lists
Piping Line List XLS “ ” Schedule w EWPs
Instrument Index XLS “ ” 3D Model Exports
Cable Schedule XLS “ ”
Vendor Data
Electrical Equipment List XLS “ ”
Lighting & Devices List XLS “ ” Digital Pipe Isometrics
Conduit & Trays List XLS “ ” Digital Structural Details
Grounding List XLS “ ”
Documents Register
Electrical Heat Trace Schedule XLS “ ”
Pilings List XLS “ ” Digital EWPs
Modules Index XLS “ ” Advanced Revisions Log
Foundations Index XLS “ ”
Primary Structures Index XLS “ ”
Secondary Structures and Supports XLS “ ”
Engineering Lists Demarked at Key Stages of Design PDF / XLS 30%, 60%, 90% Design Reviews
Engineering Lists Demarked at IFC PDF / XLS With EWP IFC Releases
Engineering List Revisions PDF / XLS At issue of P&IDs from Pass 1 to Pass 4
AWP Primers – Engineering Deliverables
Schedule Development
Interactive
Planning
AWP Primers – Engineering Deliverables
The following checklist facilitates backward pass alignment of the engineering EWP with this CWP: Plot Plans with CWAs / CWPs
P&IDs
❑ List the target engineering deliverables for this CWP (this forms the EWP)
❑ Identify baseline ‘delivery’ date required for the EWP in order to allow the CWP (and requisite purchase and Engineering Lists
material delivery) to proceed according to schedule Schedule w EWPs
❑ List all input dependencies to the EWP deliverables 3D Model Exports
❑ Identify latest possible ‘Need Dates’ for the input dependencies in order to be able to meet the required Vendor Data
EWP delivery date Digital Pipe Isometrics
❑ Incorporate the EWP into the overall EWP Delivery plan, along with the target ‘Delivery Date’ and Input Need Digital Structural Details
Dates for the input dependencies
Documents Register
❑ Track and iterate with recurring reporting of EWP Delivery Plan and EWP Constraints out from the
responsible engineer for the EWP Digital EWPs
Advanced Revisions Log
CWP P02.03A.01
CWA 03A Install Large Bore Pipe in CWA 03A
AWP Primers – Engineering Deliverables
Engineering Deliverables List – Schedule with EWP Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
Sample Export of Engineering Schedule and WBS XLS After POC 1 and before POC 2
Schedule w EWPs
Documentation on project Schedule WBS and Column 3D Model Exports
PDF After POC 1 and before POC 2
configuration for CWPs, EWPs, etc …
Vendor Data
Periodic Exports during Schedule Development PDF / XLS Following Engineering IAP Session Digital Pipe Isometrics
Baseline Schedule of Engineering after IAP PDF / XLS Following Engineering IAP Session Digital Structural Details
Documents Register
Routine Export of Engineering Schedule Progress PDF / XLS Bi-Weekly from Start of Detailed Design
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables
Engineering Deliverables List – Schedule with EWP Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
NWD /
Sample export of 3D plant design model VUE + XLS
After POC 1 and before POC 2
Schedule w EWPs
Documentation on project 3D plant design model 3D Model Exports
PDF After POC 1 and before POC 2
organization, component types and attribution Vendor Data
NWD / Digital Pipe Isometrics
Routine export of 3D plant design model VUE + XLS
Bi-Weekly from Start of Detailed Design
Digital Structural Details
NWD /
3D model export demarked at key stages of design VUE + XLS
30%, 60%, 90% Design Reviews Documents Register
Digital EWPs
3D model export demarked at IFC of one or more NWD /
At EWP(s) IFC Release
EWPs VUE + XLS Advanced Revisions Log
AWP Primers – Engineering Deliverables
Page 1 or 2 Page 2 or 2
https://www.alias.ltd.uk/pcf.asp
AWP Primers – Engineering Deliverables
Engineering Deliverables List – Digital Pipe Isometrics Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
IDF / PCF
Sample digital pipe isometric files
Before Issuance of IFC EWP
Schedule w EWPs
List of digital isometrics with EWP Release XLS At IFC Release of EWP(s) 3D Model Exports
Vendor Data
PDF files +
Set of digital isometrics with EWP Release IDF / PCF At IFC Release of EWP(s) Digital Pipe Isometrics
files
Digital Structural Details
Technical support to include AWP requirements in XLS / DOC Documents Register
At Inquiry Issue for fabrication contracts
pipe fabrication contracts for delivery of digital data / PDF
Digital EWPs
Set of ‘modified’ digital isometrics with from detailing PDF files +
Advanced Revisions Log
provided if spool demarcation is included in fabricator IDF / PCF Upon detailing of isometric by fabricator
scope of work files
AWP Primers – Engineering Deliverables
http://dcom.arch.gatech.edu/aisc/idm/process_map
AWP Primers – Engineering Deliverables
https://www.caddigest.com/3-new-releases-for-tekla-users/
AWP Primers – Engineering Deliverables
Engineering Deliverables List – Digital Structural Details Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
Technical support to include AWP requirements in
XLS / DOC Schedule w EWPs
steel fabrication contracts for delivery of digital data / PDF
At Inquiry Issue for fabrication contracts
for structural detailing and fabrication tracking 3D Model Exports
IFC Vendor Data
Sample digital structural details files BIMSTeel Before Issuance of steel fabrication contracts
Digital Pipe Isometrics
files
Digital Structural Details
Digital structural detailing file(s) exported from 3D
IFC Documents Register
steel detailing application (Tekla or equivalent) BIMSTeel Upon detailing of isometric by fabricator
http://dcom.arch.gatech.edu/aisc/content/em11_final_steel_detailing_model
files Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables
Authorized
used by in-house
Approved
dataNon-verified
and documentsdesign Non-verified design Validated design Project history
Verified
design
usedteams
databy
and only
documents
in-house data and documents output for use by maintained for Vendor Data
used
design by in-house
teams only used by in-house Project Team, suitable knowledge,
design teams only design teams only for Tender and regulatory and legal Digital Pipe Isometrics
Construction. requirements.
Digital Structural Details
Documents Register
Approved Digital EWPs
Advanced Revisions Log
Work in Progress
Specialist design
Work in Progress
teams,
Specialist
fabricators
design
Authorized
andteam,
construction
Specialist
fabricators
design
contractors
and
team,
specialty
fabricators
contractors
and specialty
contractors
AWP Primers – Engineering Deliverables
Engineering Deliverables List – Documents Register Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables
PO x
AWP Primers – Engineering Deliverables
Engineering Deliverables List – Digital EWPs Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
Routine publishing of advanced revision log
Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log
AWP Primers – Engineering Deliverables
1 Issue Advanced Revision Notices / Holds once engineering determines a design / drawing change is underway.
Immediately notify field supervision where IWP are released to build. Escalate notifications where
2 work has been started.
3 Provide weekly report for WFP Team to update IWPs that are not yet released to build.
Engineering Deliverables List – Advanced Revisions Log Plot Plans with CWAs / CWPs
P&IDs
Deliverable Item Format Timing / Frequency
Engineering Lists
On demand when revisions / holds are
Routine publishing of advanced revision log XLS
assessed to impact construction Schedule w EWPs
3D Model Exports
Vendor Data
Digital Pipe Isometrics
Digital Structural Details
Documents Register
Digital EWPs
Advanced Revisions Log