Professional Documents
Culture Documents
A. ACCESS
1. a..ENROLMENT (EOSY 2020 -2021) Key Stage 3
2. PPAs on ACCESS
PROJECT OBJECTIVES TARGET ACTUAL IMPACT
Project ENROL To identify and Enrol 100 % 106 out of 200 There are still
encourage all incoming or 55 % learners who
mapped Grade 7 enrolled in enrolled in our
school-aged students from Grade 7 school
children (12-16 neighboring
years) to barangays
enroll. such as
Banyaga,
Bilibinwang,
Barigon and
Buso-Buso.
3. Implementation Gaps/Issues
PROJECT GAPS ISSUES
Project ENROL They chose to enrol in the
nearer school
Some families of the
learners migrated because
of the situation of the
volcano.
5. Best Practices
PROJECT BEST PRACTICES
Project ENROL Career Guidance Orientation
Advocacy Campaign during Eraly Registration
Since the DepEd provided sim with load allowance, teachers were able to attend
webinars. Furthermore, a private individual donated an internet router to our school
which enabled teachers to attend webinars and trainings even if they are in school.
PROJECT BEST PRACTICES
Project De-CALIBRE Utilization of different media platforms in communicating
with their students.
Application of knowledge learned from varoius webinars
and trainings to better perform their duties such as:
Preparation of Video Lessons, Online Demonstration
Teaching, Online Instructional Supervision