LOYAL BUILDING CONTRACTING L.L.C.
1. Purpose
2. Objective
3. Responsibilities
4. Equipment and Manpower
i. Equipment
ii. Manpower
iii. Materials
5. Scope Of Work
6. Prior to start work
7. Dismantling and Installation of damaged roof materials.
i. Prepare for work
ii. Roof sheeting plan
8. Clean up
1. Purpose:
LOYAL BUILDING CONTRACTING L.L.C.
Purpose of this document is to develop and provide safe method for removing
and installation of roof sheet.
This method of erection of roof sheet complies in all the aspects with DM code
of construction safety practice and JAFZA HSE Regulations.
2. Objective:
This method defines health, safety & Environment approach for
installation of roof sheet.
3. Responsibilities:
Engineer / Supervisor shall;
Be responsible for safe execution and quality of the work.
Monitor the site activities and ensure the job
is progressing according to the project schedule and
specifications.
4. EQUIPMENT & MANPOWER:
4.1EQUIPMENT:
Scissor lift
Hand tools
Safety Belt with double Lanyard
4.2 MANPOWER:
Foreman
Helper
Banks men
4.3 MATERIALS:
LOYAL BUILDING CONTRACTING L.L.C.
Fasteners
Sheeting & Flashings
5. SCOPE OF WORK
The scope work involved in replacing the existing roof sheet from the
warehouse building is as follows.
Check for DCL conformity stamp on the sheets, Loose Insulation. If the
Stamp is not available, then immediately inform Site Engineer.
Removing of the existing roof sheet and replacing it with the new one,
this will be done one by one method ie ( removing one existing roof
sheet and it will be immediately replaced with the new one).
LOYAL BUILDING CONTRACTING L.L.C.
8. Clean up.