RCC AND PCC WORK - METHOD STATEMENT, ITP AND RISK ASSESSMENT
1
LOYAL BUILDING CONTRACTING LLC
RCC AND PCC WORK - METHOD STATEMENT, ITP AND RISK ASSESSMENT
INDEX:
REVISION STATUS………………………………………………………………………………………. 3
1. PURPOSE………………………………………………………………………………………3
2. WORK LOCATION AND WORK HOURS……………………………………………………3
3. RESPONSIBILITIES………………………………………………………………………… 4
3.1 PROJRCT MANAGER………………………………………………………………...4
3.2 PROJECT ENGINEER……………………………………………………………….. 4
3.3 QA ENGINEER & QC INSPECTOR………………………………………………… 5
3.4 HSE OFFICER………………………………………………………………………... 5
3.5 FIRST AIDER…………………………………………………………………………. 5
3.6 SITE SUPERVISOR……………………………………………………………………6
3.7 OPERATOR……………………………………………………………………………. 6
3.8 BANKSMAN…………………………………………………………………………… 6
4. MATERIALS………………………………………………………………………………….. 7
5. PLANT AND EQUIPMENT…………………………………………………………………. 7
6. HSE REQUIREMENT………………………………………………………………………...8
7. METHODOLOGY……………………………………………………………………………..10
7.1 PCC & FOUNDATION………………………………………………………………….. 10
8. INSPECTION AND TEST PLAN……………………………………………………………11
9. RISK ASSESSMENT………………………………………………………………………….12
2
LOYAL BUILDING CONTRACTING LLC
RCC AND PCC WORK - METHOD STATEMENT, ITP AND RISK ASSESSMENT
REVISION STATUS:
REV NO DATE DESCRIPTION PREPARED BY APPROVED BY
Rev N. 0 23-04-2020 Method Statement MANU ELDOSE
Rev N. 1 14-02-2020 MS, RA & HSE Plan MANU ELDOSE
Rev N. 2 19-04-2020 MS, RA & ITP MANU ELDOSE
Rev N. 3 30-04-2020 MS, RA & ITP JAMES NEEL
1. PURPOSE:
The method is prepared to ensure that construction of warehouse for the project shall comply on plans specifications
and all relevant standard and code requirements in the execution of different work activities to be performed in the construction
of warehouse and other relevant structures associated with the project. In addition this will serve as a tool to guide all technical
personnel and layman execute proper construction procedures complied with the quality and safety plan for the projects.
The method statement is prepared for Plain Cement Concrete, bending and replacement of reinforcement bars and
reinforced cement concrete as per relevant drawings and specification.
2. WORK LOCATION AND WORK HOURS:
The work activity will be in Dubai Industrial City and the site plot No: 5320248, working hours will be from 6AM to
5 PM with lunch break.
3
LOYAL BUILDING CONTRACTING LLC
RCC AND PCC WORK - METHOD STATEMENT, ITP AND RISK ASSESSMENT
3. RESPONSIBILITIES:
3.1PROJECT MANAGER:
Implementing the work program / tracking day-to-day PCC & RCC Work activity and associated activities
as per the program scheduled.
Ensuring that personnel involved in the specified activity and associated works meets the minimum
qualifications for their assignment and are properly trained.
In-charge of maintaining the safety standards by all staff and ensuring that they have required HSE Training.
3.2PROJECT ENGINEER:
Responsible for the entire activities of PCC&RCC work and associated work complying with the safety
standard requirements.
To ensure that the team engineers and foreman are aware of the Method statement and all resource area
available to carry out the work as planned.
To liaise with the CMCS to ensure timely approval of WIR, Shop drawing etc.
Responsible for the supervision of the work activity and associated work as per approved method statement
and drawings.
To ensure that all equipment’s required for the works are available and in good condition.
To ensure that all the technical matters and changes in the plan are discussed with the foremen.
4
LOYAL BUILDING CONTRACTING LLC
RCC AND PCC WORK - METHOD STATEMENT, ITP AND RISK ASSESSMENT
HSE officer shall ensure implementation of all safety Procedure while formwork and performing the PCC &
RCC work.
He shall ensure that all controls listed in the Risk Assessment are in place.
Necessary safety instructions are to be provided to the crew based on the site live condition.
He shall maintain continuous inspection of the site activities and advice site crew to prevent accidents,
personnel injury and property damage.
In case of emergencies, he shall initiate all recovery measures as per the emergency procedures.
5
LOYAL BUILDING CONTRACTING LLC
RCC AND PCC WORK - METHOD STATEMENT, ITP AND RISK ASSESSMENT
First Aider is responsible for maintaining first aid facilities while formwork and performing the work activity.
He shall administer first aid, monitor and report risks and incidents.
To provide first aid to the crew working on the activity, in the event of any injury.
He shall undertake quarterly checks of the office first aid kit to ensure it is compliant with the checklist issued
by HSE staff.
Assist the HSE Officer to carry out quarterly facility inspections.
Assist with any incident investigations and unresolved issues connected with the use of first aid supplies, or
action by the HSE Officer at the site.
Promote good safety practice within the site.
He will coordinate with the Site Engineer on a daily basis and will ensure proper distribution of the workforce
and equipment at required locations.
He will be aware of the possible risk hazards involved with the works and comply with all safety requirements
prior to start of the activity.
He should give proper Tool Box Talk to his crew for safe handling of work.
3.7 OPERATOR:
Will be responsible for safe operation of wheel loader while performing the activity.
6
LOYAL BUILDING CONTRACTING LLC
RCC AND PCC WORK - METHOD STATEMENT, ITP AND RISK ASSESSMENT
3.8 BANKSMAN:
He will be responsible for guiding the wheel Loader for the safe operation.
4. MATERIALS:
RMC as per mix design
Steel As per approval
Water Stopper
Anti-terminate
Repairing materials as per approval
Cement as per approval
Wheel Loader
Hand tools.
Concrete pump
Transit Mixer.
7
LOYAL BUILDING CONTRACTING LLC
RCC AND PCC WORK - METHOD STATEMENT, ITP AND RISK ASSESSMENT
6. HSE Requirements:
The crew must complete the compulsory HSE training like HSE Induction, Initial Fire Response (IFR),
dealing with Hazard and Risks (DHR) and to possess a valid PDO Passport as a minimum to work in this
project.
Site HSE induction will be completed for the crew prior to entering the site with a sticker labelled ”HSE
INDUCTED” affixed on to their helmet.
All Crew will wear Helmet, Safety Shoe & High Visibility Jacket and will use need based PPE like Hand
Gloves, Dust mask and Goggles etc.
The supervisor to make an assessment of the hazards & risks with respect to the PCC & RCC works and to
fill the Risk Assessment communication form.
The site Supervisor/ Forman will conduct Tool Box Talk (TBT) and will obtain attendance of the crew.
Supervisor will ensure that all control measures for the specific task are in place as per Risk Assessment.
Proper access to the work areas will be maintained throughout the working period for easy working. In case
of emergency and the crew should gather at assembly point located nearby.
Equipment’s like wheel loader will be provided with Banks man for giving directions.
All operators & banks man should be trained and must have the DDA Approved 3 rd party certificate’s
inspection/ training will be verified for all the plant/ equipment / vehicle operators / drivers prior to
commencement of work.
Right type of machinery / tools for the work will be used.
8
LOYAL BUILDING CONTRACTING LLC
RCC AND PCC WORK - METHOD STATEMENT, ITP AND RISK ASSESSMENT
9
LOYAL BUILDING CONTRACTING LLC
RCC AND PCC WORK - METHOD STATEMENT, ITP AND RISK ASSESSMENT
7. Method statement:
10
LOYAL BUILDING CONTRACTING LLC
RCC AND PCC WORK - METHOD STATEMENT, ITP AND RISK ASSESSMENT
3 CURING INSPECTION
11
LOYAL BUILDING CONTRACTING LLC
RCC AND PCC WORK - METHOD STATEMENT, ITP AND RISK ASSESSMENT
9. Risk Assessment:
Task/Job/Operation: RCC & PCC Ref No: RA-LBC-006 REV-0
Project: : PROPOSED G+M OFFICE, WAREHOUSE
Main Contractor: LOYAL BUILDING CONTRACTING LLC. AND ALLIED SERVICES ON PLOT NO: 5320248 Risk Assessor:
Client: : AL MANAR SCAFFOLDING RENTALS L.L.C. DUBAI INDUSTRIAL CITY, DUBAI – UAE. Mr. JAMES NEEL (SO)
CONSULTANT : DESIGN HOUSE ENGINEERING.
Date : 5/2/2020 Date Next Review: 5/8/2020 Approved By: Reviewed By:
Mr SUNEESH MATHEW (PM) Mr. JOSHUA PRAVIN (SR.SO)
Equipment Required: Skid Steer Loader (Bobcat), Telescopic Recommended PPE: Hard Hat, Safety shoes, Safety Harness, overalls, dust mask,
Handler, Shovel, Concrete Pump, Vibrator, Scaffolds goggles, gloves
Consequence Risk
Residual
Risks / Who
compliance
Job steps/
Rating/
/Potential
identified
Remarks
might be
Activities
Hazards
Risk
Control
Hazard
Harm/
Risk level
Sl no
Legal
E/I/R
Mitigation action to be taken/ Hazard/Risk
s
Control Method L S R
L S R
Control
Risk
Risk
Consequence
Residual
Risks / Who
compliance
Job steps/
Rating/
/Potential
identified
Remarks
might be
Activities
Hazards
Risk
Control
Hazard
Harm/
Risk level
Sl no
Legal
E/I/R
Mitigation action to be taken/ Hazard/Risk
s
Control Method L S R
L S R
Control
Risk
Risk
Consequence
Residual
Risks / Who
compliance
Job steps/
Rating/
/Potential
identified
Remarks
might be
Activities
Hazards
Risk
Control
Hazard
Harm/
Risk level
Sl no
Legal
E/I/R
Mitigation action to be taken/ Hazard/Risk
s
Control Method L S R
L S R
Control
Risk
Risk
Consequence
Residual
Risks / Who
compliance
Job steps/
Rating/
/Potential
identified
Remarks
might be
Activities
Hazards
Risk
Control
Hazard
Harm/
Risk level
Sl no
Legal
E/I/R
Mitigation action to be taken/ Hazard/Risk
s
Control Method L S R
L S R
Control
Risk
Risk
Consequence
Residual
Risks / Who
compliance
Job steps/
Rating/
/Potential
identified
Remarks
might be
Activities
Hazards
Risk
Control
Hazard
Harm/
Risk level
Sl no
Legal
E/I/R
Mitigation action to be taken/ Hazard/Risk
s
Control Method L S R
L S R
Control
Risk
Risk
Consequence
Residual
Risks / Who
compliance
Job steps/
Rating/
/Potential
identified
Remarks
might be
Activities
Hazards
Risk
Control
Hazard
Harm/
Risk level
Sl no
Legal
E/I/R
Mitigation action to be taken/ Hazard/Risk
s
Control Method L S R
L S R
Control
Risk
1. Identify Hazards
2. List Hazard Event
3. Calculate Risk Factor with Initial Risk Rating. I.E. Probability x Severity
4. Detail Controls
5. Calculate Residual Risk Rating with Final Risk Rating
6. Enter Risk Priority
1-Improbable 1-Negligible Likelihood X E-Eliminate
Review by Approved by
Severity
Control
Risk
4 16 12 8 4 6 Medium Risk
Severity
2 8 6 4 2
Severity
4. Catastrophic – Imminent danger exists, hazard capable of causing death or illness on a wide scale
3. Critical – Hazard can result in serious illness, severe injury, property and equipment damage
2. Marginal – Hazard can cause illness, injury or equipment damage, but the results would not be expected to be serious
1. Negligible – Hazard will not result in serious injury or illness, remote possibility of damage beyond minor first aid case
Probability
4. Probable – Likely to occur immediately or shortly
3. Reasonably Probable – Probably will occur in time
2. Remote – May occur in time
1. Extremely Remote – Unlikely to occur
Control
Risk