You are on page 1of 2

Project: Construction of HE Joko Widodo Mosque

Client: General Authority for Islamic Affairs & Awqaf


Location: Plot no. P1, Sector W59_02, Abu Dhabi Island, Abu Dhabi City, UAE

Elements of Building Construction.

Part 20:1987 - Method for Determination of the Fire Resistance of


Elements of Construction (General Principles).

Part 21:1987 - Methods for Determination of the Fire Resistance of Load


bearing Elements of Construction.

2972 Methods of Tests for Inorganic Thermal Insulating Materials.'

3837 Specification for Expanded Polystyrone Boards part 1:1986 -


Specification for Boards manufactured from Expandable Boards.

5750 Specifications for Quality Systems (all Sections and Parts).

1.03 SUBMITTALS

A. Manufacturer's Data: Submit manufacturer's specifications and other data for the type
of building insulation required including certification that the material complies with
the specified requirements of British Standards and Codes of Practice. Include
instructions for handling, storage, installation, protection and maintenance of
materials.

B. Samples: Submit samples size 300 x 300 mm of each type of insulation required.
Company's Representative review will be for colour and texture only. Compliance with
all other requirements must be the exclusive responsibility of the Contractor.

C. The contractor to demonstrate compliance with the envelope requirements, prior to


the procurement of the envelope components, through the provision of test
certificates, updated calculations and drawings.

1.04 PRODUCT DELIVERY, STORAGE AND HANDLING

A. Deliver and store materials on site in covered sheds and do not allow materials to
become wet or soiled. Comply with manufacturer's recommendations for handling,
storage and protection during installation.

PART 2 - PRODUCTS

2.01 MATERIALS

A. Rockwool:

1. General: Provide 50 mm Rockwool to insulate exterior walls with as indicated


on the drawings.
Section 07210 – Building Insulation Page 2 of 4 Rev.00
Project: Construction of HE Joko Widodo Mosque
Client: General Authority for Islamic Affairs & Awqaf
Location: Plot no. P1, Sector W59_02, Abu Dhabi Island, Abu Dhabi City, UAE

2. Physical Properties: Provide rigid, closed-cell, Rockwool with density not less
than 60 kg/m3.

Thermal conductivity (Five


Year aged average ) : 0.036w/mk

B. Miscellaneous Materials:

1. Adhesive for Bonding Insulation: Type recommended by insulation


manufacturer and complying with fire-resistance requirements.

2. Mechanical anchors: Type and size shown or, if not shown, as recommended by
insulation manufacturer for each type of application and condition of
substrates.

3. Mastic sealer: Type recommended by insulation manufacturer for bonding


edge joints between units and filling voids in work.

PART 3 - EXECUTION

3.01 INSPECTION

A. The Contractor must examine the substrates and the conditions under which the
insulation work must be performed and correct any unsatisfactory conditions. Do not
proceed with the insulation work until unsatisfactory conditions have been corrected in
a manner acceptable to the Employer Representative.

3.02 INSTALLATION

A. General:
1. Comply with manufacturer's instructions for the particular conditions of
installation. If printed instructions are not available or do not apply to the
project conditions, consult the manufacturer's technical representative for
specific recommendations before proceeding with the work.

2. Extend insulation full thickness as indicated over entire area to be insulated.


Cut and fit tightly around obstructions and fill voids with insulation. Remove
projections which interfere with placement.

3. Apply a single layer of insulation of the required thickness, unless otherwise


indicated or required to make up the total thickness.

4. Install insulation after all electric wiring, plumbing, and other concealed work is
Section 07210 – Building Insulation Page 3 of 4 Rev.00