Vision
• To provide a game changing cost effective light well intervention technology
with use of Capline Unit and Smooth Wireline Cables for the Cased Hole Market

Objectives
• To provide Well Intervention Technology that:
• Cost effective Mechanical Wireline Intervention
• Cost effective Data Acquisition with fiber optical cable
• Autonomics operation to reduce human error , POB
• Improved operational efficiency

CapWell AS © 2014
Company
• Joint Industry Project with Norwegian Research
Council, ConocoPhillips and Statoil to commercialize
the Capline unit
• Employees with long track record in the oil and gas
business
• Office, Test well, cable production and workshop in
Stavanger
• Patents filed for the Capline System including Sub-Sea
application

CapWell AS © 2014
Why Capline ?
– Capline animation: www.capwell.no/products
– Enclosed cost effective light well intervention technology
– Less complex and more efficient than conventional Wireline Operation
– Less equipment and requirement for deck space
– Mechanical Wireline Operation and Fiber optical logging in same operation
– Fiber optical logging with use of DTS/DAS
– No dynamic well barriers - No need for grease injection

CapWell AS © 2014
Capline Specification
Pressure rating: 690Bar/10 000PSI
Weight : 5000 kg/ 11000 LB
Dimension : 1x1x3 meter
Current cable : 6000 m /19680 ft
Future length : 30 000 ft
Max Rope Pull : 1500 kg/3300 lb
Design Spec:
– API 6A
– Atex for Zone 1
– CE Marked
– Norsok

CapWell AS © 2014
Winch Picture
Shown on picture:
• Rope entry
• Dual capstan
• Load cell
• Magnets for proxies

CapWell AS © 2014
Magnet Coupler
Leakage and wear free transfer of torque through the well
barrier
Enables motor maintenance without braking the seal

CapWell AS © 2014
Capline pictures

CapWell AS © 2014
Capline pictures

CapWell AS © 2014
Capline pictures

CapWell AS © 2014
Capline Electrical Architecture & Control system

CapWell AS © 2014
Capline Fibre Optical System
• Real-time optical measurements is an
integrated part of the Capline system

• Capline will come with :

– Optical Rotary Joint


– Real Time Cable Head Tension
– Optical P&T sensor
– Distributed temperature sensing along
the length of the well (DTS)
– Distributed fibre optic acoustic sensing technology

CapWell AS © 2014
Well Barriers
• The well is completely capped and
enclosed
• Capline is the only intervention method
without any dynamic seals
• Requires no external power to maintain
well integrity

Components above surface tree:


• Wireline BOP
• Wireline lubricator
• Capline unit

CapWell AS © 2014
Contingency operations
• Close BOP over rope (wireline ram)
• Cut rope in BOP (shear/seal ram)
• Cut rope with drop cutter
• Fish rope
• Fish tool string

All these operations have been successfully tested.

CapWell AS © 2014
Rig-up
The same as for wireline, for instance:
• Primary – DHSV
• Secondary – Surface tree

CapWell AS © 2014
Secondary Well Barrier
The same as for wireline.

A wireline shear/seal ram will typically be


used as the safety head, according to NORSOK
D-002 and D-010.

A double-valve kill inlet connection will be


included in the rig-up.

CapWell AS © 2014
Technical Approvals
• Machinery Directive, 2006/42/EC
• ATEX Directive, 94/9/EC
• Electromagnetic Compatibility (EMC) Directive, 2004/108/EC
• ISO 10423:2011 (API 6A), Wellhead and Christmas tree equipment
• ISO 15156 (NACE MR0175), Materials for use in H2S-containing environments
• NORSOK D-002, rev. 2, Well intervention equipment
• NORSOK Z-015, rev. 4, Temporary equipment

CapWell AS © 2014
Capline Run Record
Well Survey Month No. of Max Distance Operation Max Max Max Inj / Max Max
/ Year runs depth run in time BHP BHT Prod rate Inclination cable
well tension
Eldisk A-07 Verify overburden and tubing integrity 12 / 2017 2 10 000 ft 40 000 ft 110 hrs 6 300 psi 74 degC 20 000 70 deg 840 lbs
(water - DTS/DAS fiber optic logging bbl/d
injector) Memory Multifinger Caliper

Eldisk A-13 Verify overburden integrity - DTS/DAS 01 / 2018 2 10 600 ft 42 400 ft 120 hrs 5 500 psi 79 degC 13 500 70 deg 600 lbs
(water fiber optic logging bbl/d
injector)

Eldisk A-24 Leak detection -identify point of leak 01 / 2018 1 9 100 ft 18 200 ft 138 hrs 4 200 psi 45 degC 2 200 bbl/d 60 deg 220 lbs
(water between tubing and A annulus, and
injector) point of leak between A and B annuli.
DTS/DAS fiber optic logging

Ekofisk K-15 Verify overburden and tubing integrity 05 / 2018 3 14 200 ft 103 000 ft 203 hrs 8 000 psi 75 degC 10 000 40 deg 1 600 lbs
(water - DTS/DAS fiber optic logging, Memory bbl/d
injector) Press/Temp gauge passes + stationary
readings,
Memory Multifinger Caliper
Ekofisk K-09 Verify overburden and tubing integrity 05 / 2018 2 11 300 ft 45 200 ft 106 hrs 8 350 psi 65 degC 23 500 21 deg 950 lbs
(water - DTS/DAS fiber optic logging, Memory bbl/d
injector) Press/Temp gauge,
Memory Multifinger Caliper
Eldfisk A-05 Verify overburden integrity – 12 / 2018 1 11 800 ft 23 600 ft 103 hrs 7 030 psi 78 degC 11 000 72 deg 1 600 lbs
(water DTS/DAS fiber optic logging bbl/d
injector)

CapWell AS © 2014
Capline Run Record
Well Survey Month No. of Max Distance Operation Max Max Max Inj / Max Max
/ Year runs depth run in time BHP BHT Prod rate Inclination cable
well tension
Ekofisk K-29 Verify overburden and tubing integrity 02 / 2019 2 13 250 ft 52 000 ft 120 hrs 7 900 psi 60 degC 7 400 53 deg 500 lbs
(water with DTS fiber optic logging & bbl/d
injector) Memory Multifinger Caliper

Ekofisk K-09 Verify overburden and tubing integrity 02 / 2019 2 11 280 ft 45 200 ft 96 hrs 7 500 psi 60 degC 31 000 35 deg 500 lbs
(water with DTS fiber optic logging & bbl/d
injector) Memory Multifinger Caliper

Ekofisk K-26 Verify overburden and tubing integrity 03 / 2019 2 12 000 ft 48 000 ft 122 hrs 7 400 psi 138 degC 5 000 47 deg 900 lbs
(water with DTS fiber optic logging & bbl/d
injector) Memory Multifinger Caliper

Ekofisk K-14 Verify overburden and tubing integrity 03 / 2019 1 15 200 ft 30 400 ft 95 hrs 6 900 psi 60 degC 6 000 60 deg 3 200 lbs
(water with DTS fiber optic logging & bbl/d
injector) Memory Multifinger Caliper

CapWell AS © 2014
Way forward ?

• Short term:
– Standard memory logging/tools ( Caliper, PLT etc)
– DAS/DTS survey
– HD Video Camera ( Vision IO)
– Low cost battery operated tractor ( Well conveyor)
– Free standing rig up without use of WL mast

CapWell AS © 2014
Way forward ?
• Medium Term:
– Mechanical wireline with power tools
– Autonomous operation ( GLV, plug etc)
– Onshore Control Center Logging
– Optical Convertor ( replace el cable for Cased Hole Tools)
– Injection profiling/logging in Horizontal wells without use
of tractor - Capwell pump down solution
– Overall reduced POB

CapWell AS © 2014
Way forward ?

• Long Term:
• Remotely operated operation
• Hybrid cable ( FO and el cable)
• Ultra Light Sub Sea system ( patented)

CapWell AS © 2014
Future version/capabilty for the Capline Unit
• Hybrid rope with electrical conductors
• Onshore control Centre
• Robotic operating system
• Welltec battery operated Well Tractor
• Optical converter to run Cased Hole Logging, Plug
setting and Perforation services
• Capline Land Unit
• Ultra Light Sub-Sea System

CapWell AS © 2014

You might also like