You are on page 1of 3

Rev 01

Service Procedure
Date 28/03/14 SP14_02
Replacement of CB_Slave Board by 4G_SAPS Board
Page 1 / 3

Introduction:
This procedure is aimed to explain how to replace the electronic board CB Slave by the electronic board 4G SAPS.
NOTE: Both power input and serial interface cables of the machine do not change.
Needed items: Before with CB Slave. Later with 4G SAPS.

4G SAPS

Stirring cable 210mm.

Screw M3x8mm. Inox

Nome file SP14_02 Replacement of CB_Slave Board by 4G_SAPS Board rev01.doc


Rev 01
Service Procedure
Date 28/03/14 SP14_02
Replacement of CB_Slave Board by 4G_SAPS Board
Page 2 / 3

Procedure:

1. Remove from the Saps following parts: The CB Slave Board; The Stirring Motor cable; Board plastic supports >>
2. Assemble on the Saps: The 4G Saps Board; The Stirring Motor cable 210mm. NOTE: Take care of inserting the board protection cover.
3. Connect the stepper motor and the stirring motor.

Stirring motor(s).
Parallel output for
5lt canister.

Serial interface cable.

Power input cable.

Stepper motor

Nome file SP14_02 Replacement of CB_Slave Board by 4G_SAPS Board rev01.doc


Rev 01
Service Procedure
Date 28/03/14 SP14_02
Replacement of CB_Slave Board by 4G_SAPS Board
Page 3 / 3

4. Address the 4GSAPS board in the same way as it was the CB Slave board.
CB Slave hardware addressing chart: 4GSAPS hardware addressing chart:

Example:
JM1 = ON
JM2-JM3-JM4-JM6 = OFF

Example:
S1 = 0
S2 = 1

This is the: This is the:

group number 1 group number 1

1 207014 KIT RETROFIT 4GSAPS (The kit is recommended. Here below is all the material related to the kit)
1 4000189 CB4GSAPS BL B.O
1 4000057 CABLE l=210 mm. STIRRER MOTOR
2 4000713 SCREW CRPH M3 8 DIN 7500C INOX
NOTE: The number of the hardware circuit address may be different from the circuit number on the label. (Configuration transcoding)

Nome file SP14_02 Replacement of CB_Slave Board by 4G_SAPS Board rev01.doc