Project Name:

Project Owner:
Project Location:

EARTHWORKS

EXCAVATION
STRUCTURAL WORKS
PARTICULARS
CONCRETE WORKS
FOOTING
CEMENTS
SAND
GRAVEL
COLUMN
CEMENTS
SAND
GRAVEL
SLABS
CEMENTS
SAND
GRAVEL
BEAMS
CEMENTS
SAND
GRAVEL
STEEL WORKS
FOOTING
16MM REBARS(6M LONG)
COLUMN
16MM REBARS(9M LONG)
16MM REBARS(6M LONG)
10MM REBARS(6M LONG)
BEAMS
B1 16MM REBARS(13.5M LONG)
16MM REBARS(9M LONG)
16MM REBARS(6M LONG)
10MM REBARS(6M LONG)
1B 16MM REBARS(9M LONG)
16MM REBARS(6M LONG)
10MM REBARS(6M LONG)
RB 16MM REBARS(13.5M LONG)
16MM REBARS(9M LONG)
10MM REBARS(6M LONG)
SLABS
12MM REBARS(6M LONG)
MASONRY/ WALL SYSTEM
CHB
INTERIOR 10x20x40
EXTERIOR 15X20X40
FIREWALL 20X20X40
MORTAR
CEMENTS
SAND
PLASTER
CEMENTS
SAND
STEEL
10MM REBARS(6M LONG)
FORMWORKS
COLUMN
FORMS 1/4"X4"X8" PLYWOOD FORM
WOOD FRAMES 2"x2" LUMBER
SCAFFOLDING 2"x3" LUMBER
2"x2" LUMBER
2"x2" LUMBER
BEAMS
FORMS 1/4"X4"X8" PLYWOOD FORM
WOOD FRAMES 2"x2" LUMBER
SCAFFOLDING 2"x3" LUMBER
2"x2" LUMBER
SLABS
FORMS 1/4 4" X 8" MARINE PLYWOOD
SCAFFOLDING 2"x3" LUMBER
2"x3" LUMBER
ROOFINGS
CORRUGATED G.I SHEETS(32"X12")
RIVETS
G.I WASHERS
G.I PLAIN SHEETS
LEAD WASHERS
ASSORTED NAILS

Total Material Cost:


PROPOSED TWO STOREY BUILDING
CALZETA, ERIKA FAYE M.
SAN ROQUE, ROSARIO BATANGAS

Qty. TOTAL
25,000 25,000

Qty. Unit Materials Cost TOTAL

61.92 BAGS 262.00 16,223.04


3.44 CU.M. 1,432.00 4,926.08
6.88 CU.M. 1,417.00 9,748.96

59.13 BAGS 262.00 15,507.78


3.29 CU.M. 1,432.00 4,711.28
6.57 CU.M. 1,417.00 9,306.69

82.44 BAGS 262.00 21,599.28


4.58 CU.M. 1,432.00 6,558.56
6.57 CU.M. 1,417.00 9,309.69

55.00 BAGS 262.00 14,410.00


3 CU.M. 1,432.00 4,296.00
6.23 CU.M. 1,417.00 8,827.91

54.25 PCS. 213.03 11,556.88

72 PCS. 319.55 23,007.60


18 PCS. 213.03 3,834.54
118.5 PCS.        156.00 18,486.00

15 PCS.        426.00 6,390.00


18 PCS. 319.55 5,751.90
24 PCS. 213.03 5,112.72
55 PCS.        156.00 8,580.00
18 PCS. 319.55 5,751.90
3 PCS. 213.03 639.09
15 PCS.        156.00 2,340.00
17 PCS.        426.00 7,242.00
30 PCS. 319.55 9,586.50
6 PCS. 213.03 1,278.18

405 PCS.     221.00 89,505.00

1,145 PCS.   12.00 13,740.00


1,637 PCS.   12.00 19,644.00
1,102 PCS.   12.00 13,224.00

315 BAGS 262.00 82,530.00


26.04 CU.M. 1,432.00 37,289.28

60 BAGS 262.00 15,720.00


4.97 CU.M. 1,432.00 7,117.04

196 PCS.        156.00 30,576.00

52 PCS. 388.00 20,176.00


1542.17 BD. FT. 62.00 95,614.54
860.3 BD. FT. 62.00 53,338.60
2435.4 BD. FT. 62.00 150,994.80
1437.93 BD. FT. 62.00 89,151.66

69 PCS. 388.00 26,772.00


1729.14 BD. FT. 62.00 107,206.68
574.8 BD. FT. 62.00 35,637.60
450.26 BD. FT. 62.00 27,916.12

68 PCS. 425.00 28,900.00


955.5 BD. FT. 62.00 59,241.00
793.96 BD. FT. 62.00 49,225.52
30 PCS. 400.00 12,000.00
780 PCS. 1.50 1,170.00
1,560 PCS. 5.00 7,800.00
3 PCS. 1,865.00 5,595.00
780 PCS. 40.00 31,200.00
7 KG. 65.00 455.00

1,346,722.42