LOCATION:
SCOPE OF WORKS
1.00 PREPARATORY WORKS
2.00 EARTHWORKS
3.00 REINFORCEMENT WORKS
4.00 MASONRY AND CONCRETE WORKS
5.00 CARPENTRY WORKS
6.00 DOORS AND WINDOW INSTALLATION
7.00 ROOFINGS WORKS
8.00 ELECTRICAL WORKS
9.00 PLUMBING WORKS
Formworks Fabrication
Coco Lumber 2 x 2 inch x 10 ft long 30 pcs ₱120.00 ₱3,600.00
Coco Lumber 2 x 3 inch x 10 ft long 15 pcs ₱130.00 ₱1,950.00
Ordinary Plywood 1/2 thk x 4 x 8 ft wide 8 pcs ₱850.00 ₱6,800.00
Common Wire Nail 2 inch long 1 kg ₱80.00 ₱80.00
Common Wire Nail 3 inch long 2 kg ₱100.00 ₱200.00
Switch
1-Gang Switch Classic pcs ₱120.00 ₱0.00
2-Gang Switch Classic pcs ₱120.00 ₱0.00
3-Gang Switch Classic pcs ₱120.00
₱0.00
TOTAL COST ₱9,640.00
The total cost was for workscope mention above and native structural only.
Price varies depends on availability of materials and the commercial price from different suppliers
The labor cost and other construction micellaneus was not included on this estimate