Professional Documents
Culture Documents
METRO
NASHVILLE
October 6, 2022 MPC PLANNING
DEPARTMENT
executive summary VI background 2 the vision 46
foreword
planning context
IX
x 1 the east bank 1.0 Introduction
4
7
4 equitable & affordable east bank 50 7
4.0 Introduction 53 7.0
neighborhoods for nashvillians
Introduction
98
101
commitment to equity xii 1.1 Place Framework 8 4.1 Housing for All 54 7.1 Four Walkable Neighborhoods 102
executive summary xiv 1.2 The East Bank Today 14 4.2 Economic Opportunity for All 58 7.2 Complete Communities 106
1.3 The Cumberland River Today 16 4.3 Future Development for All 58 7.3 The Public Realm 108
illustrative plan: option a xxii 1.4 Policy & Zoning Framework 18 4.4 Mobility for All 58 7.4 Development Guidance 110
illustrative plan: option b xxiv 4.5 River Access for All 59
2
2.0
pressures & opportunities
Introduction
22
25
4.6
4.7
Resiliency for All
Neighborhoods for All
59
59 8 metro-owned land in focus 114
8.0 Introduction 117
2.1
2.2
2.3
Rapid Growth & High Demand
Inadequate Mobility
Climate Change & Living with Water
26
28
32
5
5.0
safe & simple
multimodal connections
Introduction
60
63
8.1
8.2
8.3
East Bank Park
Mobility Hub
East Bank Gateway
118
123
123
5.1 Urban Street Grid 64 8.4 Cultural Terrace 123
3
3.0
public visioning process
Introduction
34
37
5.2
5.3
5.4
Connect Nashvillians
Prioritize Transit with Dedicated Lanes
Nashville’s Most Robust Bicycle Network
72
74
76
8.5
8.6
Titans Stadium Village
Pedestrian Bridge Extension
124
124
3.1
3.2
3.3
Visioning Timeline & Framework
Engagement Highlights
Imagine East Bank Vision Concepts
38
40
42
5.5
5.6
Fill Gaps in the Greenway Network
Eliminate Barriers to the East Bank
78
80 9
9.0
action items
Introduction
126
128
6
6.0
respect for the river
Introduction
82
85
9.1
9.2
9.3
In-Process Action Items
Priority Action Items
Future Action Items
128
129
131
6.1 Make Room for the River 86
6.2 Optimize Stormwater Management 88
6.3 Improve River Access 90
6.4 Connect the Riverfront 92
6.5 Provide a Great Park 94
6.6 Activate the River 96
Nashville’s next great neighborhoods along Nashville along the banks of the Cumberland River, and dream
of what vibrant neighborhoods could emerge there. Few other
Cleveland
Cleveland S
I-24
t. Park
Cowan S
Dickerson Pike
planning context
The Envision Cayce master plan.
3
t.
McFerrin Ave.
Several projects currently under development, in The Imagine East Bank planning study was initiated to McFerrin
Pike
and around the East Bank, will add significant new outline strategies for coordinated development and to Park
atin
opportunities in the form of housing, jobs, and dense better understand how Nashvillians want the area to
Gall
mixed-use development. Existing policy supports this evolve with these changes. This approach proactively
evolution of an industrial area adjacent to Downtown directs and manages growth, as opposed to defensively or MCFERRIN
Nashville into dense urban neighborhoods. However, retroactively planning for it at the margins.
RIVER PARK MAXWELL
NORTH HEIGHTS
y
these proposals, if developed without a coordinated
wa
Frederick
rk
strategy, will strain existing systems such as road networks While not exhaustive, the following projects under
Pa
Douglass
ton
and stormwater infrastructure. development and neighborhoods experiencing rapid
on St. Park
Jeffers
ing
growth, set the context for this vision plan.
Ell
EAST
large-scale planning catalysts BANK
1 111 NORTH 1ST STREET 3 ORACLE 1
East Park
In May 2021, a Specific Plan (SP) for property In the summer of 2021, tech company Oracle
located at 111 North 1st Street — the site of the purchased almost 70 acres in River North, for a new
existing TA Truck Stop — was approved by the Metro campus that will host 8,500 employees and bring t. EDGEFIELD
Planning Commission. The approved plan proposes thousands around and through the East Bank daily. in S
Ma
t.
nd S
S. 5
a 15-acre, high-density, mixed-use development, Oracle committed to paying $175 million for Metro a Ave
.
odl lby
with a maximum height of 30 stories and FAR (floor infrastructure upgrades — including new greenways Wo
th S
She
area ratio) of 5.0. and a new pedestrian bridge over the river.
t.
I-24
4
2 CAYCE PLACE 4 TITANS STADIUM
2
As Nashville grows, so does its need for affordable The Tennessee Titans lease the Titans Stadium from
housing. In 2013-2014, MDHA spearheaded the Metro Sports Authority — which owns 90 acres DOWNTOWN
Envision Cayce — a master planning process to of land on the East Bank. The current lease runs
2nd
update Nashville’s largest subsidized housing through the 2028 NFL season. The Titans and Metro
property, located on 63 acres in East Nashville. are currently exploring the cost-benefit scenarios of
Ave
Cumberland
renovating the existing stadium or constructing a new
.N.
Park
The plan sets a vision for a mixed-income, mixed-use stadium adjacent to the existing site. As of the release
community with 2,390 units. It ensures a one-for-one of this plan, a decision has not been made. Davidson St.
replacement of existing affordable units. Construction
is ongoing, with several of the projects already SOBRO
completed. The project will provide affordable, d.
workforce, and market-rate units near the East Bank. Blv
ns
Ve tera
rean
Ko
ROLLING
MILL HILL
x eastbank vision plan October 6, 2022 MPC xi
Various recreational opportunities
are envisioned for the East Bank.
commitment to equity
An East Bank for all Nashvillians begins with a goal to Today, the legacy of urban renewal persists: in addition The planning for a new, multimodal boulevard is guided We are committed to building a vision around these
promote meaningful and positive change in partnership to its interstate border, the East Bank is designed for by the National Environmental Policy Act (NEPA) in its guiding principles, but are not limited to them. We
with the community. Equity is a foundational principle. cars rather than people. Its surface lots exacerbate earliest phases to ensure that a data-driven approach are inspired by the Equity Statement within the 2021
environmental vulnerabilities. It contains no housing informs the basis of our decisions, including community Affordable Housing Task Force Report and used it to
To move forward, we must acknowledge that urban units and few human-scaled relationships or points of and environmental impacts. Therefore, understanding identify guiding principles for future housing goals, which
planners have historically created and exacerbated connection with adjacent neighborhoods. the natural and historical context of the East Bank — not subsequent phases of work on the East Bank will follow.
barriers in our community. As a profession, we must take just physically but from a people perspective — will
responsibility for damage done, learn from it, and promote Planning directors across the nation released a joint public inform decisions around some of the largest proposed In conclusion, the vision outlined in this document is a first
policies and practices that benefit those previously left out. statement, in 2021, to collectively address racial equity investments, including infrastructure — such as the step of many towards a new future for the East Bank —
goals in their practices and policies, with a commitment boulevard. equity is a principle that should be foundational for each
The American Planning Association’s (APA) equity to change their work toward the goal of equitable subsequent step forward.
statement argues, “This reflection must acknowledge the communities in the future. The statement reinforces the Other guiding principles in our work include, but are not
historical trauma of racism and discrimination inflicted importance of addressing historic harms in new planning limited to:
on people of color, wrought by the planning profession work. It lays out the principles for addressing the past and » Environmental resilience, and with the future Racial inequity permeates Nashville’s past and
itself, which led to structural disadvantages in housing, key principles that should guide change in cities moving redevelopment of any industrial sites, environmental present — and housing is no exception. While
transportation, education and employment that last to this forward. justice considerations. existing Fair Housing policies are intended to
day.” » A public open space network for everyone. protect vulnerable communities, many Black
It is for these reasons that so much of our East Bank
The East Bank and its immediate context reflect the harmful work emphasizes the creation of human-scaled open, » Land use standards that support multi-family and brown Nashvillians still face housing
legacy of 20th century urban revitalization projects. green space and mobility networks that serve all users: housing and that do not support single family discrimination. Current status-quo practices
During the 1950s-1970s, new federal and state highways pedestrians, bicyclists, bus riders, and car drivers. Creating housing on the East Bank. and policies continue to perpetuate harm, so we
severed the neighborhoods of East Nashville from the river building blocks for neighborhoods that provide safe and » Land use standards that support a diversity of must intentionally work to design and implement
and downtown — leaving the East Bank as the concrete comfortable access to goods, resources, jobs, and housing uses including housing, a mix of business types, solutions that are anti-racist both in outcomes
desert between them. Urban renewal policies of that same is a first step towards reclaiming the East Bank as a public and educational or cultural uses that benefit and processes.
era cleared neighborhoods and displaced residents from asset and minimizing some of the man-made, super-scaled communities. —Metro Nashville’s 2021 Affordable
their communities. obstacles imposed on the area. Housing Task Force Report
y
s Greenwa
Cleveland
the vision
Park
om
ILLUSTRATIVE PLAN: OPTION A MAXWELL
Shelby Bott
HEIGHTS
accommodates relocated stadium
CLEVELAND
PARK
B
Douglass tion
Park East n Op
Park CAYCE nsio
PLACE Exte
d.
Shelby Ave
o nR
St
an
Woodland St
McFerrin b
nd
Park l Le
ela
a
te nti
Main St
v Po
Cle
Dic EDGEFIELD Potential Lebanon Rd. Extension Option A
ker
St
son MCFERRIN
ce
Pik 5 St
th
PARK
Gra
e
Interstate Dr
r
eD
Wharf Park
SHELBY’S
rsid
CENTRAL BEND
te
Wa
Cow
an S
WATERFRONT
y
Oracle t 2nd St n wa
CAPITOL ee
Gr
legend RIVER JEFFERSON- CROSSINGS Ko ill
Seig
re an ll H
NORTH SPRING East Bank Blvd
Ve Mi
enth
ra te lling
East Bank Ro
Cumberland ns B
aler
Bridge
River North Bike-Ped Bridge
Woodland St Bridge
Park
Bike
River North East Bank Br
Park idg HILL
-Ped
e
East Bank Greenway
t Bridge
Cayce Place
Brid
Riverfront
g
Existing Parks
e
Jefferson S
Park
Planned Parks ay
River Greenw RUTLEDGE
Cumberland
Potential River Lay-Backs Public
DOWNTOWN SOBRO HILL
Square
GERMANTOWN
Existing Greenways
y
s Greenwa
Cleveland
the vision
Park
om
ILLUSTRATIVE PLAN: OPTION B MAXWELL
Shelby Bott
HEIGHTS
accommodates renovation of existing stadium
CLEVELAND
PARK
Douglass B
Park East tion
Park CAYCE n Op
PLACE nsio
xte
Shelby Ave
E
d.
St
Woodland St
McFerrin nR
nd
o
Park an
ela
b
l Le
Main St
v tia
Cle
EDGEFIELD o ten
Dic P
ker Potential Lebanon Rd. Extension Option A
St
son MCFERRIN
ce
Pik 5th St
PARK
Gra
e
Interstate Dr
r
eD
Wharf Park
SHELBY’S
rsid
CENTRAL BEND
te
Wa
Cow
an S
WATERFRONT
y
Oracle t East Bank Blvd n wa
CAPITOL ee
Ko Gr
legend RIVER JEFFERSON- CROSSINGS ill
Seig
re an ll H
NORTH SPRING 1 St
st
Ve Mi
enth
ra te lling
East Bank Ro
Cumberland ns B
aler
Bridge
River North Bike-Ped Bridge
lvd
ROLLING MILL
Woodland St Bridge
Park
Bike
River North Br
idg
e
HILL
-Ped
East Bank
East Bank Greenway
t Bridge
Brid
Riverfront
g
Existing Parks
e
Jefferson S
Park
Planned Parks ay
River Greenw RUTLEDGE
Cumberland
Potential River Lay-Backs Public
DOWNTOWN SOBRO HILL
Square
GERMANTOWN
Existing Greenways
1.0 INTRODUCTION
1.1 PLACE FRAMEWORK
1.2 THE EAST BANK TODAY
1.3 THE CUMBERLAND RIVER TODAY
1.4 POLICY & ZONING FRAMEWORK
prehuman history: river and rock formation French Lick sand » The west bank, with its high bluff, protective views 100-year floodplain
limestone and river proximity make it an ideal location for 500-year floodplain
» The channel of the Cumberland River is formed by shale pioneer settlement.
water flowing from the Appalachian highlands, calcarenite East
west and down towards the Mississippi River. As it » Unsuitable at the time for human habitation, the Bank
East flood-prone, sandy land on the east side of the
meanders, the river cuts away at the limestone on its Bank river is ideal for industries such as logging that downtown
outer banks, forming bluffs, and deposits sand on its
inner banks, creating floodplains. downtown need immediate access to the river.
1996: Nashville voters approve partial funding 2012: Cumberland 2022: Connect Downtown Study
for a multi-purpose stadium on the East Bank Park opens
» The ongoing study aims to improve
» First used by the NFL’s Tennessee Titans in 1999. » The park transformed
mobility and address traffic congestion in
underutilized
» Stadium hosts concerts and events like the 2019 NFL Draft Nashville’s downtown core.
industrial riverfront
and the 2021 Music City Grand Prix. » Projects, programs, and policies will
into a 6.5 acre
innovative park on be identified to help better manage
the East Bank. downtown’s increasing congestion and to
make it easier for people to get around by
» The design
all modes of transportation.
demonstrated
Nashville’s » Visit connectdowntown.nashville.gov
Stadium under commitment to parks, to get involved before the draft plan is
construction in released in early 2023.
1998. Source:
sustainability and An event in Cumberland Park
Jackie Bell, resilient landscape (Hargreaves.com).
The Tennessean. strategies.
1999, Tennessee Titans host first game at 2016, WeGo’s nMotion 2021, TDOT begins a study to
2012, Cumberland Park March 3, 2020, An EF3 tornado hits Nashville — the sixth January 2022,
Adelphia Coliseum, now Nissan Stadium, Plan is adopted. evaluate Nashville’s inner-loop.
on the East Bank opens. costliest tornado in US history. Total damage exceeded NDOT, along with
defeating the Cincinnati Bengals 36-35.
$1.6 billion. June 2021, Metro TDOT, WeGo,
2017, WalknBike Plan
is adopted. December 25, 2020, Explosion damages releases the Affordable and the Nashville
2005, Nashville Civic Design Center’s 2013, MDHA’s Envision dozens of buildings, including historic properties, Housing Task Force Downtown Partnership
The Plan of Nashville: Avenues to a Cayce Master Plan is on 2nd Ave. North. MDHA and Metro Planning Report — the county launched the Connect
2017, Metro Parks’ Plan
Great City is completed. adopted. launched a recovery effort in response. needs 52,500 affordable Downtown study.
to Play is adopted.
units by 2030.
21st Century: new horizons today: looking east for the future
2015, Metro Planning’s 2017, East Bank December 2020, Mayor’s 2020, Metro Parks August 2021, Inaugural Music City Grand
May 1-2, 2010, The Cumberland River NashvilleNext is adopted. Supplemental Policy is Office releases the Metro launched a master Prix race is held in Nashville, on the East Bank.
crests at more than12 feet above flood adopted. Nashville Transportation Plan. planning study for
stage downtown. 2015, Downtown Community Wharf Park — an June 2021, Oracle purchases 70 acres, just
Plan is adopted. undeveloped piece north of the East Bank for an 8,500 job tech hub.
2017, River North Urban 2019-2020, Nashville MSA’s population of property directly
2007, Nashville Riverfront Design Overlay (UDO) is exceeds 2 million. across from the East
2013, West Riverfront April 2021, Metro Planning Department
Concept Plan is completed. adopted. Bank.
Master Plan is adopted. 2019, Nashville hosts the NFL draft. launches the Imagine East Bank planning study.
2010 flood: the city rises above tragedy 2015: Metro Planning’s
NashvilleNext is adopted to
» May 1-2, 2010; 13.5 inches of rain falls in 36 hours. guide Metro’s growth for the
11 Nashvillians lost their lives and over 10,000 next 25 years
residents were displaced. The flooding caused over
$2 billion in private property damage and destroyed » NashvilleNext is the general plan
nearly 11,000 properties. for Metro Nashville and Davidson
County, intended to guide growth until The NashvilleNext Growth
» The Cumberland River crested at 51.86 feet 2040. and Preservation Map
downtown, a level not seen since 1937, before The Cumberland breaks its banks, taken from shows how coordinated
USACE flood control measures. the John Seigenthaler Pedestrian Bridge. » Nearly 20,000 community members investments, community
Source: Nashville Public Library. participated in the creation of the plan character policies,
over three years. and preservation work
together.
0
adjacent to downtown and East
Nashville neighborhoods — or to its
potential economic role at the center
of one of the fastest growing regions continuous north-south
in the country. connections pass through
the East Bank.
river-related
Most recreation
Most
Common
Common Sources of
1. Uplands InWatershed
addition toImpairments
localized floods, Impairment
Nashville
Stormwater moves towards river as runoff, picking up is experiencing more frequent large scale,
Bacteria, Alteration
debris and pollution. regional floodsof— Agriculture and
such as the floods in 2010
Streamside
andOldin
Hickory
2021 — Vegetation, Urban Stormwater
due to the increase Runoff
of intense
2. Midlands storms resulting from
Sedimentclimate change paired
Runoff accumulates at overwhelmed storm sewer inlets, causing with regional urbanization.
localized flooding and debris accumulation at low points. Sediment, Alteration Urban Stormwater
The Cumberland of Streamside
River Compact Runoff, Pasture
estimates
Stones
Vegetation, Bacteria, Grazing, and Land
that over 900 miles of
and Nutrients
rivers and streams in
Development
3. Lowlands the Middle Cumberland Basin are currently
Underground piping is inundated by riverine impaired and represent a potential Urbanization,
threat to
floods reducing drainage capacity for either human Bacteria,
health, Sediment, Collection Systemboth.
ecosystems, or
Middle Cumberland
midlands and uplands. Riverine floodwaters and Nutrients Failures, and Urban
back up through the stormwater system and And yet, as Nashville’s populationStormwater Runoffhas
soils into low points near the existing stadium. boomed, so has the demand for recreational
opportunitiesSediment,
in andAlteration
along Agriculture,
the river —
Urban
including
Harpeth boating, paddleboarding,
of Streamside Stormwater
Vegetation,
greenways, nature and and
trails, Runoff , and Land Kayak
fishing.
Bacteria Development
4. Riverfront tours, launching from the East Bank, have
Edges of riverfront are constraining riverine flood flows and increasing become a popular fixture of the tourism Over 900 miles of streams in the Middle Cumberland watershed are impaired,
velocities and flood elevations. Flows are eroding away steep slopes. industry, and river-centered events, such as including the Cumberland River along the East Bank Source: Our Cumberland River
the annual Dragon Boat Race and Music City Basin part 3, Cumberland River Compact.
Triathlon, draw hundreds into the river at the
East Bank every year.
16 eastbank vision plan October 6, 2022 MPC 17
1.4 policy & zoning Framework policy guidance for the east bank
While a place framework helps us understand how an The current community character policy for the East Bank is primarily
area has developed into what it is today, policy and T6-Downtown Neighborhood (T6-DN). A large portion of Civic (CI)
zoning are tools to understand the appropriate use and exists where the Metro-owned land is.
character for the future of an area.
The East Bank Supplemental Policy covers the entire East Bank
and describes the area as “one of Downtown’s most significant
untapped resources with ... close proximity to both East Nashville
neighborhoods and the excitement of a growing downtown.”
NashvilleNext
NashvilleNext is the 2015 general plan for Nashville. NASHVILLE’S COMMUNITY PLANS
Created by Nashvillians, the plan was designed to guide The Metro Planning Commission has adopted fourteen
the city through 2040. The plan provides policy direction unique Community Plans — in cooperation with residents,
on the physical structure of Davidson County — the things business owners, property owners, institutions, developers,
we build, how and where we build them, and the places and elected officials. These future planning documents
we preserve. The plan brought together and updated the describe the role each community within Davidson County
Community Character Manual (CCM) and Nashville’s plays in realizing the overall NashvilleNext vision. They
Community Plans. also include community character policies for each
property that help guide that vision.
COMMUNITY CHARACTER MANUAL (CCM)
AND POLICIES DOWNTOWN COMMUNITY PLAN
The Community Character Manual is a comprehensive The East Bank is located within the Downtown Community
document that describes the vision of an area’s future Plan, which was last amended in 2017. Downtown has
growth, development and preservation, as well as long been the seat of state and local government, host
its appropriate zoning districts, its various community to unique cultural, sporting, and entertainment offerings,
character policies, and their characteristics. These and the economic center of Middle Tennessee. Downtown
policies describe the appropriate form and character of has been enhanced in recent years with the addition of
development — such as massing, orientation and scale new and expanding businesses, investment in new civic
of buildings, setbacks and spacing, and the location of facilities and open spaces, and new residential choices.
access and parking. The CCM uses a planning tool, called While downtown is the most intense urban setting in the
the Transect, to organize the various policies into distinctive county, it retains several natural attributes that give it
catergories, based on their geographic context. shape and add to its character and beauty. These include
Capitol Hill, Rolling Mill Hill, and the 500-foot wide
SUPPLEMENTAL POLICIES
Cumberland River which divides downtown into east and
west banks.
existing policies
Alone, the CCM may not provide the level of detail
necessary to guide new development that is desired by Civic (CI): Intended is to preserve and enhance existing
community stakeholders. In such cases, a supplemental publicly-owned properties that are used for civic purposes.
It is recommended that the
policy can provide an additional level of guidance
beyond that provided by the CCM. By addressing the existing supplemental policy for Open Space (OS): Intended to preserve and enhance
unique features of an area, supplemental policies expand the East Bank be replaced with existing open space areas.
upon the standard guidance of CCM in order to tailor the adoption of T6-Downtown Neighborhood (T6-DN):
policy to the needs of an area.
Imagine East Bank. Intended to foster vibrant, high intensity mixed-use
development with activated ground floors.
FUTURE REZONINGS
Following the adoption of the Imagine East Bank Vision
Plan, all proposed zone changes on the East Bank will
be evaluated for their compatability with the vision.
Mixed-Use Intensive (MUI & MUI-A) - 170 acres
east bank zoning districts
A majority of the East Bank’s existing zoning districts
are mixed-use (either MUI, MUI-A, MUG, or
MUG-A). Each of these classifications yield significant industrial general (IG) - 72 acres
entitlements that will allow for potentially high-density
development. It is expected that Nashville’s booming
real estate market will take advantage of this land and
its zoning over the coming years.
The East Bank also has a prominent amount of industrial existing zoning
zoning districts (IR and IG). As the market begins to
redevelop the existing mixed-use districts, it can be Mixed-Use Intensive (MUI & MUI-A): Industrial Restrictive (IR): Supports a wide range Specific Plan (SP): Provides flexibility to create
assumed that the nearby industrial zoning will be ripe Supports a mixture of high-intensity residential, of light industrial uses at a small-to-moderate scale. developments that meet the goals and objectives
for rezoning. The SP-zoned parcels on the East Bank office and compatible commercial uses in areas Uses most suitable in this district are those which of NashvilleNext and are sensitive to the
serve as a precedent — having been rezoned from IR to characterized by the highest levels of accessibility, operate within completely enclosed buildings. Uses surrounding context. The SP district is not subject
SP in 2021. mass transit and essential support services. The within this district should also have a high level of to the traditional zoning districts’ land use and
bulk standards for this district permit large scale access to the major street network. design standards. Instead, permitted uses and
buildings. It is intended that this district be applied design elements are determined for the specific
to areas near downtown. Industrial General (IG): Supports intensive development.
manufacturing uses essential for the economic
Mixed-Use General (MUG & MUG-A): viability of the metropolitan area. Industrial uses Commercial Core Frame (CF): Supports a
Supports large scale development on or associated with this district often require large, diverse variety of business service functions
near arterial streets, in the creation of mixed- relatively flat sites with good access to the regional along with retail trade and consumer service
use, walkable urban neighborhoods. These highway system, the Cumberland River or a rail establishments and large parking structures.
designations support moderately high intensity line.
mixed-use policies of the general plan.
20 eastbank vision plan October 6, 2022 MPC 21
2 Pressures & Opportunities
This section summarizes key pressures and opportunities facing both
nashville and the east bank.
2.0 INTRODUCTION
2.1 RAPID GROWTH & HIGH DEMAND
2.2 INADEQUATE MOBILITY
2.3 CLIMATE CHANGE & LIVING WITH WATER
2.0 introduction
As Nashville continues to see pressure from INADEQUATE MOBILITY
rapid population growth and continued record Current mobility in the Nashville region is hindered
development, building infrastructure to support by auto-dependency, limited capacity for future
such growth is vital. Since 2010, Nashville and its growth, heavy congestion with long commute times,
surrounding counties have added 30,000 people outdated infrastructure, and the lack of safe and
per year. It is estimated that over 3 million people simple connections. Similar to the opportunity for
will reside in the area by 2045.¹ This massive neighborhood building, the East Bank presents
influx exacerbates regional pressure for housing, an opportunity to plan an effective, multimodal
strains road networks, and threatens environmental transportation network that will improve both local
resiliency and quality of life. and regional connectivity.
Portions of the East Bank are also located in the CLIMATE CHANGE
floodplain of the Cumberland River. Addressing & LIVING WITH WATER
the resiliency will be critical to the success of the Historically the East Bank’s relationship with the
East Bank and in creating accessible and desirable Cumberland River has been commercial and
public spaces for the community. industrial. With over 1.7 miles of riverfront, the East
Bank is uniquely situated to reorient the city toward
The unique location and conditions of the East the river in a way Nashville has never prioritized
Bank present opportunities to address each of the before. By creating accessible public spaces that
following systemic issues: emphasize the river, Nashville can create a more
sustainable relationship with its most valuable and
RAPID GROWTH & HIGH DEMAND underutilized natural resource. This relationship
Development and growth across Davidson County will be strengthened by a resiliency strategy that
have put strains on services, created a lack of thoughtfully and creatively deals with climate
attainable housing, congested our roads, and changes, such as increased flooding and the urban
promoted urban sprawl. Impromptu development heat island effect, where urban cores are hotter
of the East Bank — that is not guided by a plan than the rest of a city.
nor cohesive infrastructure — will likely exacerbate
these issues. This reality is why the Imagine East Developing a neighborhood-centric East Bank
Bank vision emphasizes guiding growth and provides a transformative opportunity to address
development in a way that prioritizes people, amid the challenges that have plagued the East Bank
a rapidly growing part of the community. Given in the past, and ensure the future viability of
its current lack of infrastructure and development, neighborhoods for all Nashvillians. By investing in
the East Bank presents a rare opportunity to plan the creation of attainable housing, transportation
for new, mixed-use urban neighborhoods near the infrastructure that prioritizes multimodal uses,
downtown core that reflects the Imagine East Bank mixed-use and retail opportunities, and building
vision and serves the needs of Nashvillians. out an accessible and active riverfront, we can set
the stage for East Bank neighborhoods to meet
Nashvillians’ needs.
boom.
the cost of housing, a major and growing now.
challenge in Nashville. According to the
Metro Nashville Affordable Housing Task
Force Report, 52,500 new affordable
housing units are needed in the city by 2030. new housing creates
DENSITY
new neighborhoods DOWNTOWN
POPULATION (DWELLING
RESIDENTIAL
AREA OCCUPANCY
Nashville’s downtown has a lower UNITS/ACRE)
population and population density than Nashville (current) 15,000 13 95%
comparable cities. However, its residential Nashville (with 21,000 18 94%
occupancy rate is among the highest, properties under
suggesting strong demand. More residential
construction)
development close to the downtown
core is needed to bolster downtown in Atlanta (Midtown) 19,000 25 95%
its role as the economic heart of the city Austin 16,000 23 90%
and accommodate the influx of new jobs
anticipated.³ The East Bank’s large footprint Charlotte 22,000 17 93%
can accommodate more new housing
Denver 30,000 18 94%
development than other comparable
districts, with a mix of densities and building Seattle 98,627 33 94%
types. Population density and residential unit occupancy in comparable downtowns³
24.8%
from 2020 to 2021.
demand, and high land values will favor expensive price points and
dense development, without public intervention. The current policy and
zoning in the East Bank also support high-density, urban neighborhoods.
However, an inclusive approach to developing the East Bank can help
#11
meet some of Nashville’s large and growing affordable housing needs.
Including retail and other amenities that cater to local residents and
workers can address community desires for places that feel centered
out of the top 100 metro to the local experience, as opposed to tailored for tourists, and could
When community members were regions in the U.S.²
asked to describe the East Bank include locally owned restaurants, bars, and shops and public spaces
today, the most commonly-used term with programming for residents.
was:
underutilized.¹ This figure-ground map juxtaposes the high-density development ¹Planning & Design Principles Public Engagment Summary, 23
downtown Nashville has experienced (light blue) and the lack of ²FHFA HPI® Top 100 Metro Area Rankings. Change in purchase from 2020Q4 to 2021Q4.
development on the East Bank (yellow), just across the river. ³ Nashville Downtown Partnership Annual Residential Report, 2021
I-24 BOUNDARY
1.4 MILES
pressure for regional mobility
As growth continues at a rapid pace, transportation challenges only
increase. The Greater Nashville Regional Council (GNRC) estimates
that as the population of the region approaches 3 million people by Industrial rail lines inhibit mobility,
2045, regional traffic volumes could increase by 26 percent, resulting reduce safety, and block access to
in a 14 percent reduction in average travel speeds (Middle Tennessee the riverfront in many locations.
Connected, 8). In congested areas, traffic volume will double(8).
The two maps above, developed by the Greater Nashville Regional Council, compare
current travel demand with projected demand in 2045 for the Nashville region’s LACK OF
transportation system, including Davidson, Maury, Robertson, Rutherford, Sumner, The river functions as a boundary THROUGHWAYS
Williamson, and Wilson Counties. It projects that regional congestion will increase and dividing line between the East
without improvements to regional mobility, such as reimagined corridors, expanded Bank and downtown and as an
transit, and improved sidewalks, bikeways, and greenways. object to get over rather than to visit
and enjoy. LIMITED USES
127 ACRES OF
INCOMPLETE SURFACE PARKING
STREET NETWORK
MOVING AROUND AND THROUGH THE EAST BANK Limited throughways are
When asked to describe how they currently move around the East Bank, bottlenecks to connectivity and
community members identified lack of north-south connectivity, a disconnected add to the sense of isolation on
grid, and difficult wayfinding as critical barriers. Four key mobility insights were the East Bank.
gleaned from their experiences during the Summer 2021 workshops: Expansive parking lots,
larger than city blocks,
1. A lack of a continuous route hinders north-south through connections. inhibit connections and
2. Overpasses and I-24 create barriers to Downtown and East Nashville. Currently, there is no street grid on the
East Bank to meet basic connectivity wayfinding.
3. A disconnected street grid makes wayfinding difficult.
4. Most conflict points are associated with I-24. requirements. It requires five turns to
traverse the site from north to south.
1ST ST.
and are critical components of a robust
buffered bike lanes sidewalks or the lack of safe and quality
transportation system.
standard bike lanes crossings.
T.
Currently, the East Bank Greenway is DS . marking
sharedVElane
ST. LAN A The John Seigenthaler Pedestrian
extremely limited. It does not extend outside A IN OOD HEL
BY
M W S Bridge is the hallmark of pedestrian
of Cumberland Park, although bike lanes
connectivity on the East Bank and
provide a connection to Shelby Park and the
a critical connection to downtown.
Shelby Bottoms and Stones River Greenways.
The bridge provides stellar views of
KVB
DAVIDSON ST
.
the skyline and the river. Plans for
Improvements to current facilities and
pedestrian infrastructure should expand
expansions of the bike network are needed,
upon the opportunities provided by this
especially protected or buffered lanes
beloved landmark.
connecting the east and west banks of the
river.
EXISTING WEGO
TRANSIT ROUTES
transit frequent an opportunity for regional transportation improvements
Expanding transit infrastructure is critical to T. local
RS ON S Given its key location, the East Bank can be a strategic linchpin in improving Nashville’s local and regional mobility, as
increasing our transportation system’s capacity. JEFFE
1ST ST.
express well as the ways people move around and through the site, if the following improvements are made:
connector
Due to Nashville’s radial street pattern, several » Provide a continuous north-south connections within the Inner Loop — reducing reliance on I-24
WeGo transit routes that serve the north and D ST. .
ST. OD LAN Y AVE » Develop a street grid that connects the East Bank to downtown and drives traffic away from East Nashville
east parts of the county pass through the East IN EL B
MA WO SH neighborhoods
Bank. However, with the lack of active uses
in the study area, transit stops are rare and » Connect to high-capacity BRT planned for Murfreesboro Pike and the airport
infrequently used.
» Connect to transit northward, along Dickerson Pike and Trinity Lane
KVB
In addition to WeGo’s transit service, the DAVIDSON ST » Expand opportunities for active transportation — sidewalks, bikeways, and greenways
.
Nashville Downtown Partnership offers a park-
and-ride service that transports commuters from These improvements could help reach the goals and connect to projects outlined in the 2020 Metro Nashville
stadium parking lots to downtown via shuttle Transportation Plan. It envisioned “a multimodal system for all that offers choice and better connects neighborhoods,
buses. residents, and businesses to the places that they need and want to go to in a safe manner” (7). It proposes $1.6 billion in
critical projects, including Bus Rapid Transit on Murfreesboro Pike, bus service expansion, neighborhood transit centers,
pedestrian safety improvements, and bikeway and greenway investment (7-13).
Tra
D
r y C ee k
nt ha
r
e Creek
m C
Li tt l
V
U
e k
re
ne C re D ry
ek
ro w C
M ar
k
tl e k re
L it Car
ney C
ree
N Fo
rk
§
¦
¨
ek
k
AND IMPERVIOUS SURFACES critical topics at the intersection of environmental justice¤
ee
Gi
bs
Cr
on
Ew
k
ato
and public health. A reason resiliency is a top priority of
Tra
D
nC
r y C ee k k
nt ha
r re e
re e
C
un ek
Ewi ng C re
k
ll R
m C
L it tl
V
U
cause of death in the U.S.² In Nashville, temperatures in ek
r
The East Bank has 1.7 miles of riverfront — representing
ne C r e D ry
ee
bo F or
k
stressors disproportionately affect minority and under-
ow
ek
e
a rr C Cr
k
eM
k
reek ek
k re
the urban core are hotter than the rest of the city due to t tl ck
ee
resourced communities. Equity on the East Bank¨
§
¦looks inree Ba
Li
C
an opportunity to reorient the city towards the
re
Car
Cr
rk
oo
ney C N Fo hu r
Sco tts C
V
U
ek
§
¦
¨
pe
S u lp s Cree k
rs
te
i
ee
Wh
Cr
impervious surfaces, like asphalt, that retain heat and the
eek
G
bs
Cr
k
i
g on Cr e e
in Cr ub
Ew
k
canopies and green spaces to combat urban heat-island the river, and a resiliency strategy that thoughtfully and
Cre
ee
Cr
n
ek
u ek
Bu
ll R
V
U
effect and mitigate flooding, to these important issues.
Ewi ng C re
V
U
R
b erl a nd R
iv er
creatively deals with climate change and incorporates
ic
Cu m
hl
an
d C
the following:
re
ek
ek
Cr e
o ry
ek
e
Cr
Cr
k
ck reek ek
ee
MC
Ba
re
Cr
k
oo
ur
s C re e
U
Sc ott s C
V
U lp h
§
¦
¨
pe
Su s Cree k
rs
» room for the river: plan for a wide, gently
te
wn
Wh
Cr
eek Br o
k
Cr e e
ek
J Percy Priest
ub
Su
Overal l Cre
§
¦
¨ sloping riverbank with floodable programming
g Reservoir
C ar
tre
e C
re ek
River
l C
re ek
ek
er
Nashville
R
V
U iv
C re
b er l a nd R
ic
Cu m
i le
hl
d C Be
re e k
n
is hotter
re ec tC
ve
h F la Se
ek
ek
Cr e
C
o ry
re
er C re e k
ek
direct and inviting ways for people to access
O tt
Cr
than the
MC
k
Poplar Cr ee
k
the river; incorporate a variety of passive and
s C re e
county.
Br o
active programs like waterfront greenways,
k
ee k
r
C
ne
ek
§
yC
¦
¨
g Reservoir
ar r ee
tre k
e C Ho l
Nashville
re t Cr ee
opportunities
ek k
V
U V
U
» an underutilized economic generator¤
£
Ha
rpeth
Bu f f a
lo
Cr
ee
k
§
¦
¨ Mi
» river-oriented placemaking: plan
River
ll C d ia
In
re e n
k C re
±
ek
ek
M
Be
towards and prioritizes views of the river
the east bank
re e k
75%
n
ec tC
ve
er C re e k
» network of outdoor spaces: include a
ek
O tt
WHAT WOULD MAKE THE RIVER MORE 100-year floodplain: Areas with a
e
ee k
r
C
APPRECIATED AS A RESOURCE?
ic a
1% chance of flooding in any given
ne
development framework
Tu rke
yC
r
covered in impervious
Ho l
t Cr ee
±
ek
500-year floodplain: Areas with a district scale, to increase capacity and provide
flood streets, and sidewalks. 0.2% chance of flooding in any given redundancy
» water interaction (boating, kayaking, etc.) year. Most of the East Bank, and almost
itigatingeastbank
Urban Heat Islands
¹ Planning & Design Principles Public Engagment Summary, 19 the entirety of River North are located in
² NOAA. Weather Related Fatality and Injury Statistics. this floodplain.
32 vision plan October 6, 2022 MPC 33
3 public visioning process
This section summarizes the public engagement and community input
that crafted the imagine east Bank vision concepts.
3.0 INTRODUCTION
3.1 VISIONING TIMELINE & FRAMEWORK
3.2 ENGAGEMENT HIGHLIGHTS
3.3 IMAGINE EAST BANK VISION CONCEPTS
Four “Planning + Design Principles” public engagement events were held during
the Summer of 2021 and focused on various topics relating to the East Bank.
This was followed on May 11 with a virtual kickoff presentation to PHASE 4: DRAFT AND REFINE VISION CONCEPTS
introduce the consultant team and poll stakeholders on their priorities. FALL AND WINTER 2021-2022
Eighty-one people attended the kickoff. On November 30, 2021, a public meeting was held to present draft
vision concepts, gauge initial reactions, and determine necessary
refinements, based upon additional community feedback.
PHASE 2: RESEARCH AND ANALYZE 127 people attended the meeting, and 266 responded to an
SUMMER 2021 accompanying online survey.
This phase was characterized by extensive research into the
existing conditions, constraints, and opportunities on the East Bank. PHASE 5: DRAFT VISION PLAN
Four public workshops were held to explore planning and design
SPRING AND SUMMER 2022
principles. Residents participating in these interactive events helped
craft a common vision that reflects the needs and desires of the The Imagine East Bank vision plan is drafted. It includes a summary
community at-large. More than 750 people participated. of all research and analysis, engagement, vision concepts, and
recommendations for implementing the community’s vision.
20
Nov. 30, Aug. 22, Imagine
22
forward-thinking, Public study
update
Jan. 13, Update to
Planning Commission
East Bank draft
vision plan released
information- Apr. 13,
Consultants
driven, and announced Oct. 6,
Imagine East
community-led Dec., Summary
of feedback on
Bank vision
plan adopted
vision for the East Sep. 21 - Oct 31, public review
concepts Aug. 22 - Sep. 30,
at MPC
Multimodal Survey
Bank. Oct. 19,
Planning
Draft vision plan survey
Sep. 8, Update to
2021
Equitable & Affordable East Bank Safe & Simple Multimodal Connections
Analysis of results from July 14-15, 2021 Planning + Design Principles workshops
Question from Multimodal Survey, Sept-Oct 2021.
Analysis of results from July 14-15, 2021 Planning + Design Principles workshops
Equitable & Safe & Simple Respect for the River Neighborhoods
Affordable East Bank Multimodal Connections for Nashvillians
Public input throughout the visioning process Early in the visioning process, planning staff sought While the East Bank borders the Cumberland River, The East Bank can play a sizable role in meeting
emphasized a need for equitable and affordable public input on a major East Bank obstacle - the river is often not visible. In the past, the river the need for housing and jobs in the core of the city.
development that achieves the following: connectivity. Feedback from the public workshops was considered a liability rather than an asset; We heard from the public the desire for the new
» provides housing diversity and truly and the July 2021 survey demonstrated a lack of however, attitudes towards the river have shifted neighborhoods, services, and jobs on the East Bank
affordable units street connections. In order to identify community in recent years. The public visioning process aimed to be designed with intention for Nashvillians, in
» promotes equal access to all transportation priorities for enhancing connectivity, a multimodal to understand community members’ preferences contrast to the visitor-oriented places across the river.
users and modes survey was put out in October 2021. Participants for riverfront access and resiliency efforts. At the
showed support for creating critical street planning workshops in July and August 2021, the Feedback included having family-oriented spaces
» ensures new plans and development connections coupled with improvements to the public provided feedback on riverfront strategies and activities, locally owned businesses, and
prioritize the community’s vision multimodal network. and identified development preferences such housing for a diversity of incomes. Outdoor spaces
» invests in public infrastructure and diversifies as waterfront dining, viewpoints, boating, and like Cumberland Park and Shelby Bottoms and
land uses to create more opportunities for greenways. greenways were held up as examples of safe spaces
Nashvillians appropriate for all ages.
» provides access to open space for the whole
community
» provides critical infrastructure for resiliency
Interstate Dr
r
Wharf Park
eD
SHELBY’S (Proposed)
rsid
CENTRAL BEND
te
Wa
Cow
an S
WATERFRONT
t South 2nd St
CAPITOL Ko
RIVER JEFFERSON- CROSSINGS
Seig
rean Cumberland
NORTH SPRING East Bank Blvd
enth
Ve Park
ter
an
aler
sB
lvd ROLLING MILL
Woodland St Bridge
ge
B
Br
ike/
idg HILL
James Robertson Brid
East Bank e
Ped
Park
East Bank Greenway
idge
b
ridg
r
fferson St B
Riverfront
e
Park
48 eastbank vision plan October 6, 2022 MPC 49
Members of the public attend a Planning +
Design Principles Workshop, Summer 2021.
4 equitable &
affordable east bank
Advance equity, resiliency, and high quality of life for
all Nashvillians through the creation of accessible and
affordable places to live, work, and play.
4.0 INTRODUCTION
4.1 HOUSING FOR ALL
4.2 ECONOMIC OPPORTUNITY FOR ALL
4.3 FUTURE DEVELOPMENT FOR ALL
4.4 MOBILITY FOR ALL
4.5 RIVER ACCESS FOR ALL
4.6 RESILIENCY FOR ALL
4.7 NEIGHBORHOODS FOR ALL
Achieving an equitable East Bank for all cannot simply depend on the
words of this vision plan. And while the private market is a critical tool
for the East Bank’s future, it cannot ensure an equitable East Bank on its
own. Moving from vision to reality requires intentional implementation
through further detailed planning that incorporates equity at every
stage, with regular, routine reporting to promote transparency and
accountability.
The East Bank’s vision for equity represents the first of four
Imagine East Bank vision concepts — and is woven throughout
the entire vision plan.
The opportunity to create new neighborhoods is unprecedented » Are the people responsible for making decisions
in our city’s recent history, and it must be done right. The representative of the communities impacted by those
East Bank essentially is a “blank canvas” to build model- decisions?
neighborhoods for Nashville. However, residential development » Are Fair Housing best practices being used? Does this
on the East Bank should be considered as one part of Nashville’s solution affirmatively further Fair Housing?
comprehensive housing strategy — not a singular solution. Metro » Does this solution reduce or eliminate barriers for
should continue to seek additional opportunities to create and communities of color?
preserve dedicated affordable housing throughout the county.
» Does this solution repair or reconcile past harm done to Black
and brown residents and communities?
lacking infrastructure does not Last summer, we asked Nashvillians to describe » Does this solution challenge or reinforce systems of
support residential development how they want future generations to experience oppression?
the East Bank. Some of the most common
The East Bank’s significant opportunity does not come without responses were related to equity; affordable, » How is the affordable housing industry complicit in the
constraints. The “blank canvas” lacks the basic infrastructure accessible, housing, inclusive, diverse, systems of oppression, and must that change?
needed to support even the most minimal uses, let alone community, local, etc. » What unintended consequences might this solution have for
mixed-use neighborhoods and their residents. Furthermore, Black and brown residents?
flood risk and other man-made barriers present challenges
to implementing neighborhoods. To fully realize the East
Bank’s potential — substantial investment in mobility networks,
environmental remediation, and accessible public open spaces
— must be made. Prudent fiscal practices suggest that only
a certain amount of density will maximize our return on this
infrastructure and its costs.
¹Mixed-Income’s Anticipated and Realized Benefits
BIPOC SUPPORT
Metro will strive to involve BIPOC-owned (Black,
Indigenous, and People of Color) small businesses
as the development of the East Bank continues. The
Urban League’s Real Estate Development (RED)
Academy provides one way to build the capacity Various recreational opportunities
of minority developers who could participate in the are envisioned for the East Bank.
future development of the East Bank. Engaging with
LIUNA and other building trades unions, who have
robust workforce development and apprenticeship
programs, can help ensure local labor is included
in the economic opportunities. Other ways to 4.3 development for all 4.5 river access for all 4.7 neighborhoods
for all
support BIPOC developers and entrepreneurs on New development plans (both public and private) must be The Cumberland River is Nashville’s most significant — yet
the East Bank include: created and reviewed through the lens of the Imagine East most undervalued and underutilized — natural resource;
Bank vision concepts, reflected in this plan. Development however, much of it is inaccessible, and even invisible, to
» Learning more about the obstacles that that successfully advances this vision should be encouraged the public. Chapter 6 - Respect for the River envisions New neighborhoods on the East Bank should serve
BIPOC entrepreneurs face and develop and supported. an open, accessible, and public riverfront on the East Bank, existing nearby residents in East Nashville and in
strategic programs to counter these offering a diversity of active and passive uses, wild and Downtown, as well as future East Bank residents.
obstacles. urbane outdoor experiences to enhance the quality of life Chapter 7 - Neighborhoods for Nashvillians
» Partnering with the private sector to ensure
equitable access to capital.
4.4 mobility for all
Infrastructure that provides equal access to all our
and well-being of Nashvillians. describes how these neighborhoods should include
people’s daily/weekly needs, such as jobs,
healthcare, childcare and schools, groceries and
4.6 resiliency for all
» Conducting input sessions with the transportation system’s users and modes must be prioritized.
community and BIPOC business leaders shopping, and parks and open spaces. By bringing
Furthermore, this infrastructure must be well connected all of these needs together within the East Bank’s
to determine existing barriers to opening a so that Nashvillians can use it to traverse the county and
successful business. When major weather events strike, minority and low- neighborhoods, residents of the East Bank, and
the region. Chapter 5 - Safe & Simple Multimodal income communities are more vulnerable and suffer greater its surroundings, will be able to access them more
» Expanding opportunities for mentorship, Connections further describes how the East Bank will catastrophic loss. In the years since the 2010 flood, as the easily.
apprenticeships, and training. create an urban street grid with a robust transportation region has been rapidly urbanizing, Middle Tennessee
network for pedestrians, bicyclists, transit riders, and has also experienced more frequent and intense rain
vehicles. These transportation networks provide a broader events more often — resulting in increased flooding and
SMALL AND LOCAL BUSINESSES range of mobility options for those households that do not devastation for local communities. Chapter 6 - Respect for
Local, independent businesses are foundational have access to a car, or for those who are unable to drive a the River proposes a proactive, system-scale approach to
to community character and economic health but car due to disability or age. stormwater management and flood mitigation on the East
face unique challenges with rising market demand. Bank that will bolster environmental resiliency for the entire
Programs and initiatives to support local businesses community and increase our capacity to withstand the next
and entrepreneurs, such as the creation of a big storm.
local Business Improvement District or East Bank
Merchants Association, will generate economic
vitality and preserve authenticity in the study area.
With the varying development needs and scenarios for the future in
mind — including the potential relocation of the Titans Stadium —
the East Bank’s urban street grid has been planned with flexibility
at the forefront. However, each vision concept and idea presented
in the plan remains possible, albeit in a different form, no matter the
future that takes shape.
East B
An urban street grid on the East Bank — a top priority Urban Street Design Guide will ensure safety and
from the beginning of the planning process — will set enjoyment for all users.
the framework for various multimodal networks. This
grid will also be able to facilitate the kinds of mixed- Several proposed modal priority corridors will be
use development and urban forms that are expected to implemented through continuous north-south corridors
ank Bouleva r d (
emerge in the area. — the lack of which is a major obstruction to mobility
R
D RIVE
east bank boulevard
ERLAN
on the East Bank today. These north-south corridors will
CUMB
An evaluation of successful bicycle, Bus Rapid Transit intersect with four existing east-west corridors — which will
(BRT), and pedestrian facilities in various U.S. cities found be upgraded with modal priorities — to improve access (transit/pedestrian priority)
that modal priorities must be carefully considered for each at multiple levels. At the micro level, these corridors will
The East Bank Boulevard is envisioned to extend north-south along
street/corridor. This is why some streets on the East Bank be the ‘main’ streets that people use to move around the t
the entire length of the East Bank, and into River North. As the Stree
are envisioned to be bicycle-priority, while others are East Bank. At the macro level, these corridors will provide son
backbone of the Imagine East Bank vision, it sets the foundation Jeffer
transit-priority, etc. Regardless of the street, pedestrians, greater access for neighborhoods throughout the county.
for the East Bank’s future urban street grid and multimodal
CUM
cyclists, and transit will be prioritized before cars. Best In total, four north-south corridors are envisioned for the
BE
transportation networks. t
RLAN
practices from Vision Zero, Complete Streets, and NACTO East Bank — each with their own modal prioritizations. tree et
BR
in S
D RIV
a Stre
ER
M
A minimum of 110’ of right-of-way will allow the East Bank l and
T)
o d
Wo
Boulevard to provide 20’ wide tree-lined sidewalks, two vehicular
urban street grid travel lanes, and a dedicated transit lane in each direction. In
some areas, on-street parking will be provided.
nue
Transit/Pedestrian Priority: by Ave
Dedicated transit lanes on the The boulevard’s dedicated center-running BRT lanes will allow Shel
East Bank Boulevard. transit vehicles to move through the East Bank efficiently, and
without conflict. Iconic stations and top-notch amenities will serve
Bicycle/Pedestrian Priority: transit users at various stops along the boulevard.
Protected bicycle lanes on 2nd
Street, Waterside Drive, and The East Bank Boulevard’s streetscape design will be grand.
each of the four existing east- Active ground floor uses will reinforce the pedestrian quality of
west streets. the boulevard through a lively street wall. The boulevard will
provide sidewalks made with high-quality materials and unique Proposed East Bank Boulevard
Bicylce/Pedestrian Exclusive: paving patterns; spaces for outdoor dining and gathering; clear Proposed BRT Stations
East Bank Greenway and and prominent wayfinding; flexible parking zones; and street trees
Proposed East Bank Mobility Hub
existing and proposed bicycle/ (within the sidewalk and in the median) and other landscaping
pedestrian bridges. that contribute to shading and stormwater management. In some
areas, publicly accessible open spaces will front the boulevard
Local Priority: eet and extend the pedestrian realm.
rson Str
Local streets will prioritize Jeffe
pedestrians. Select streets will et
CUM
Stre
BERL
in S od
Wo
RIVE
Ma
R
Future Connection:
Long-term opportunity to
5
th
e
and connectivity to and from enu
y Av
et
all streets
on the East Bank will
have a speed limit of
n Street
Davidso
25 mph Conceptual rendering of
the East Bank Boulevard.
ND RIVER
CUMBERLA
During implementation, more detailed engineering and design analysis will determine the
appropriate street section configuration of the East Bank Boulevard — balancing right-of-way
constraints, community preference, connectivity priorities, and streetscape experience. The most
critical elements to the vision of the proposed East Bank Boulevard are dedicated transit lanes,
sidewalks, and landscape. If an alternative to the proposed street section were to be developed, it
should not come at a loss (in full or in part) of these elements. Two preliminary alternatives (shown
below) include bicycle facilities, in place of one vehicular travel lane in each direction.
waterside drive
(bicycle/pedestrian priority)
2nd street
RIVER
RLAND
Waterside Drive is envisioned as a continuation of Davidson
(bicycle/pedestrian priority)
CUMBE
Street — which currently connects Shelby Park to the East Bank
reet 2nd Street is envisioned to extend north-south along the entire along the Cumberland River. It is envisioned to extend north-south
W ate
son St along the entire length of the East Bank, and into River North —
Jeffer length of the East Bank, and into River North and McFerrin Park
via Dickerson Pike. Running parallel to the East Bank Boulevard, where a planned bike/pedestrian bridge will provide connectionson Street
CUM
s
to Germantown, and a planned Grace Street bike/pedestrianJeffer
BE
t and one block to the east, 2nd Street will feature grade-separated
RLAN
rsi
tree et connection will provide access to East Nashville and across
in S
D RIV
CUM
a Stre protected bicycle lanes — level with the sidewalks and separated
ER
de
BERLA
and I-24. The west side of Waterside Drive is envisioned to feature a et
Stre
2
ND
o d
Wo i n Stre
RIV
nd
protected two-way cycle track, while both sides of the street will Ma
ER
nd
Dri v e
One vehicular travel lane and 17’ wide tree-lined sidewalks will od l a
include 15’ wide tree-lined sidewalks. Wo
Stre
by e
hel it to operate in a free-flow condition at most locations, since enu
S excellent bicycle access to the East Bank Boulevard as well as to y Av
elb
East Nashville and Downtown. there will be no intersecting streets from the west. This design Sh
will provide a high-quality, low-stress bike facility that will
A relocated Titans Stadium would have frontage on 2nd Street. significantly enhance safety, comfort and accessibility for cyclists.
Here, a curbless environment could exist — a way to encourage Bicycle connectivity to the East Bank Boulevard will be provided
sharing of right-of-way by all transportation modes. On event by intersecting east/west streets with protected bicycle lanes.
treet
on Ssegment Waterside Drive will bend and jog along its route to encourage the treet
Davidsthe
days, of the street adjaent to the stadium could Davidso
nS
close to vehicular traffic in order to provide additional space for corridor’s one vehicular travel lane in each direction to be slow-
CUMBERLA pedestrians and vendors.
ND RIVER
moving and to give greater priority to cyclists and pedestrians. The AND RIVER
CUMBERL
corridor will have development on its east side, and views of the
Cumberland River on its west side.
Conceptual rendering
of Waterside Drive.
Conceptual rendering
of 2nd Street.
safe, accessible, and low-stress movement for recreational cyclists Local streets will fill the spaces in between the existing
and pedestrians. Additionally, it will provide opportunities for
nk
pedestrian connection will provide access to various parks in East bicycle lanes — giving cyclists even more options for
Nashville and across I-24.
y
ND RIVER
CUMBERLA
corridor prioritization
The Imagine East Bank Multimodal Survey identified the same corridors. This determination was based on a
bike/pedestrian infrastructure — including sidewalks, number of factors including the following:
greenways, bike lanes, and crosswalks — and enhanced » The inability to fully prioritize both transit and
public transit as the top community priorities for the East bicycles on a single corridor (for example, left turns
Bank’s multimodal network. off of the boulevard would be restricted at most
intersections due to the dedicated transit lanes —
During the planning process, it was found that other complicating left turns for cyclists)
cities with successful multimodal transportation networks » The ability to provide high-quality, low-stress, and
often have separate transit-priority and bicycle-priority direct, bicycle facilities on three parallel north-
corridors in order to keep conflicts between transit vehicles south corridors, and various east-west streets that
and bicyclists to a minimum. This translates directly to intersect with the boulevard
enhanced safety and higher comfort levels for cyclists.
Based upon these evaluations, corridor prioritizations and » The need to accommodate multiple mobility and
corresponding street sections were configured to create an resiliency goals within the boulevard’s limited right-
effective modal balance across the East Bank. of-way
» Vehicular activity will be less impactful to cyclists on
Conceptual rendering While the East Bank is set to have the most robust bicycle Waterside Drive and other streets where cyclists are
of the East Bank Greenway. network in Nashville, as well as some of the first dedicated prioritized
transit lanes, they are not planned to be included on
K
regional connectivity A
P O
B C I
East Bank Potential extensions of the East Bank Boulevard
E N
East Bank Boulevard Existing major corridors L M
Q
Universities Sports/Entertainment
1
J
A Tennessee State University (8,000+ enrolled) K First Horizon Park
B Meharry Medical College (950+ enrolled) L Bridgestone Arena
C Fisk University (800+ enrolled) M Schermerhorn Symphony Center
D
D Trevecca Nazarene University (2,000+ enrolled) N Ascend Amphitheater
O Titans Stadium
Major Developments additional connections to and from R
Amazon campus (5,000+ jobs) Other
downtown nashville
E
F Neuhoff site (4,500+ jobs, 800 housing units) P Tennessee State Capitol
G Landings (50,000 sf office, 1,100 housing units) Q Music City Center
to be explored through the ongoing study:
H
I
Oracle campus (8,500 jobs)
Cayce Place - MDHA (2,390 housing units)
R Nashville International Airport connect downtown
J Napier/Sudekum - MDHA (2,000 housing units)
e
be explored is transit-priority corridors in Downtown
Pik
Nashville.
rson
Example of a center running dedicated BRT lane.
east bank mobility hub
23 - Dicke
A mobility hub on the East Bank would be able to serve
the routes that pass through the area — including several
of the busiest routes in the WeGo Public Transit system.
It would also provide multimodal transfer opportunities
East B to other buses, bicycle, or first/last mile walking trips.
Furthermore, it would alleviate pressure from WeGo
EAST BANK
ank Bouleva r d (
22 - Bordeaux
Central and the downtown core.
MOBILITY HUB
WEGO long-term solutions
e
CENTRAL in Pik Existing and future transit routes would be able to utilize
llat
- Ga the East Bank Boulevard’s dedicated transit lanes as their
CUM
56
BERL
BR
RIVE
R
transit network
Ho
ike
ur
P
tte
Op
rlo
era
Cha
D RIVER
CUMBERLAN
50 - Planned BRT:
t in
g
es b Dedicated transit lanes on Korean Veterans operating speeds are less than four miles
oro
SOBRO
ole
Pik Boulevard and on Rep. John Lewis Way S. per hour, should be explored.
e (B
TRANSIT HUB
nsv
and Murfreesboro Pike BRT to one another. Future Frequent Service Network:
ille
7 - Hillsbo
CUM
Protected Two-Way Cycle Track:
BERL
AND
Located along the north-south Waterside Bicycle/Pedestrian Bridge:
RIVE
R
Drive corridor, this facility is separated from A new bridge connecting River North to
vehicular traffic and allows people to bike Germantown (to be built by Oracle), and
in both directions on one side of the street. upgrades to an existing bridge (to be built
through the Foster Street SP).
Protected Bicycle Lanes:
Vertical separation, such as bollards, Shared-Use Path:
parked cars, or planters, buffer cyclists from Located in River North along the East Bank
vehicular traffic. This facility makes up the Boulevard, this facility supports multiple
majority of the proposed bicycle network — recreational and transportation modes —
including the north-south 2nd Street corridor including walking, biking, roller-skating,
and each of the four existing east-west and wheelchair use — in a shared zone.
streets.
Signed Share Routes/Neighborways:
Future Protected Bikeway Connection: This facility is located on low-speed streets
Long-term opportunity to improve that are optimal for people biking. They use
multimodal access and connectivity to and signage, pavement markings, and traffic JOHN SEIGENTHALER
from Southeast Davidson County via a calming measures to discourage non-local BIKE/PED. BRIDGE CUMBERL
AND RIVER
bridge over the Cumberland River. vehicular traffic, while prioritizing cyclists.
CLEVELAND
PARK
MCFERRIN
PARK
N
BERL
AND
mb
RIVE
EAST
erl
PARK
R
BICENTENNIAL
Oracle has agreed to build out the East
Riv
MALL
Outside of the scope of the Imagine East river. Additionally, they will build a bicycle/
Gr
ee
to Germantown.
ay
KIRKPATRICK
PARK
SHELBY
Gr
nway networks will expand mobility for people networks to one another. This includes a
ms Gree
PARK
ee
Botto
Shelby walking and biking throughout the county. bicycle/pedestrian-exclusive interstate
nw
ay
CUMBERLAND
crossing — providing access to Grace
PARK
Proposed East Bank Greenways: Street on the east side of the I-24 corridor.
Integrated into the landscapes along the
Cumberland River — connecting the East Future Greenway Connection:
JOHN SEIGENTHALER RIVERFRONT
PARK
Bank and River North to Shelby Bottoms Long-term opportunity to improve
BIKE/PED. BRIDGE
RIVER
RM CUMBERLAND
HG Greenway. Another greenway segment will multimodal access and connectivity to and
Gu
ree
nw connect the East Bank to McFerrin Park, and from Southeast Davidson County via a
lch
ay
Frederick Douglass Park in East Nashville. bridge over the Cumberland River.
Gre
en
wa
y
Railroad to be removed
ay
rk w
Railroad reroute
Pa
reroute the railroad
on
gt
El
l in
Jefferso
n Street
CSX currently operates through Nashville via
their Nashville Terminal Subdivision, which Nashville Terminal
diverges into two corridors — the Main and
Int
Subdivision - Main
er s
e 24
BERL
t
tree
River North. The Main continues northeast
R
in S
Ma
eet
Str
od lan
d to Hart Lane, where it converges with the
2
Eas
Wo
nd
Radnor Cutoff.
Stre
t Ban
t e
kB
No
Wate
oul
Roa
s id
bou
rd
-D
DOWNTOWN
nue
Roa
Ave
She
lby under development to understand the design Nashville Terminal
th
This effort does not have to come at the expense of our enjoyment
and use of the river. Rather, this two-pronged strategy of tying
floodplain improvements with district-scale stormwater management
supports a more direct and active relationship with the Cumberland
River and invites opportunities for the creation of parks, outdoor
spaces, and development that interact directly with it.
Laying back the riverbank provides more space for the water to
spread, thereby reducing the velocity moving through the channel, RIVERINE FLOODPLAIN
encouraging groundwater infiltration, and reducing erosion.
Because the land on the East Bank is currently under-developed, and a portion of it is
metro-owned property, it presents a rare opportunity to implement a district-approach
to stormwater management — where infrastructure is connected and shared among
all developments within the district — particularly in the scenario where Titans Stadium
moves.
During the planning study, these sites were are met on the East Bank.
ORIENT TOWARDS THE RIVER analyzed as places where the riverbank
could be regraded to accomodate flooding.
On the waterfront, buildings will be oriented with respect to the river. Lay-back areas can be programmed for a
Retail, restaurant, and other waterfront amenities will be encouraged multitude of uses–including boating
along the public waterfront, and on Waterside Drive. Further inland, infrastructures like docks or fueling stations.
development in each neighborhood on the East Bank will work with
topography and viewsheds to optimize views of the river. riverfront access points & connections to
East Bank neighborhoods
EXTEND THE EAST BANK GREENWAY
Existing & Proposed River Activation
The plan proposes filling a current gap in the greenway network by
connecting Shelby Bottoms Greenway to the East Bank Greenway, 1 Oracle
along the Cumberland River waterfront. This will provide greenway
access along the entire stretch of riverbank within the East Bank and 2 Neuhoff
in River North. Riverfront Park / Downtown
3
CONNECT TO THE WATERFRONT 4 Cumberland Park / East Bank
The East Bank’s proposed street grid includes direct access for Wharf Park
pedestrians, cyclists, and vehicles to Waterside Drive, riverfront 5
parks and the East Bank Greenway. Woodland Street, Main Street,
and Shelby Avenue will also provide through connections to East
Nashville neighborhoods and over the river to Downtown.
East Bank Park, from the perspective of a relocated A conceptual rendering of East Bank Park, from the perspective of a
Titans Stadium, looks out towards the Cumberland River. relocated Titans Stadium, and looking towards Downtown Nashville.
“
in the upland areas of the East Bank. planting areas.
Boating enthusiasts especially expressed a desire for The opportunity to activate the Cumberland River extends
new investments on the river — including recreational far beyond the East Bank, however, the four planned lay-
boating and waterborne transportation opportunities. back areas on the East Bank and in River North, provide
The Cumberland River in Nashville could be more widely great opportunities for various waterfront programming.
used by boaters if adequate infastructure and amenities Boating facilities integrated into these lay-back areas are next steps
were present to support them. Such investments can range envisioned at multiple locations on the East Bank in order Additional coordination and analysis is required to understand the scope of the opportunities and
from smaller scale investments such as overlooks, docks, to create robust and cohesive infrastructue. safety risks associated with a more active river — particularly as new activities intersect with barge
and kayak launches (far right image), to larger scale traffic. Chapter 9 - Action Items lays out the following next steps related to activating the river:
» Undertake a waterfront investment and management plan to identify the scope of users on
the river and the financial opportunities available
» Undertake a market analysis to understand the demand for boating, docks, marina, and
other amenities in Nashville
» Undertake a market analysis of potential future river activity and its interaction with the
working river
» Understand the scope of capital investments needed to meet the demand for boating facilities
A conceptual sketch of a marina on the East Bank. Kayakers on the East Bank in July 2022. Currently, the East Bank does not have adequate facilities such as
launches and storage facilities to support the demand for recreational boating.
7 neighborhoods for
nashvillians
Create vibrant, livable, and authentic neighborhoods
that prioritize the everyday needs of Nashvillians.
7.0 INTRODUCTION
7.1 FOUR WALKABLE NEIGHBORHOODS
7.2 COMPLETE COMMUNITIES
7.3 THE PUBLIC REALM
7.4 DEVELOPMENT GUIDANCE
7.0 introduction
Nashville’s quality of life and economic opportunities have made
it one of the fastest growing cities in the United States. This intensity
of development must be balanced with an equal investment in the
infrastructure required to ensure that new neighborhoods on the East
Bank are and remain strong, livable, and healthy.
ACRES: 120
1
neighborhood catalysts
JEFFERSON- Catalysts are key sites, projects, and places of opportunity. During the planning process, many catalysts were identified
as vital to the transformation of the East Bank into vibrant, walkable urban neighborhoods. Often, they link the
SPRING neighborhoods with the other vision concepts in the plan — providing connections, bolstering resiliency, and creating
great outdoor spaces.
6
2 Some catalysts were discussed in more detail in previous or following chapters of the vision plan. However, further
exploration should be undertaken to determine appropriate next steps for each catalyst.
built form
The East Bank’s built form will be diverse and vary street by street, block-by-block, and
neighborhood-by-neighborhood. Buildings should be appropriately sited, oriented,
massed, designed, and programmed to make a positive contribution to the built
environment by:
» Careful consideration will be given to the lower floors’ and/or the bases of
buildings’ uses, siting, massing, and design — and how they shape, define, and
support the pedestrian experience within the public realm
» Tall buildings should be designed and programmed as vertical communities
» Tall building floorplates should be designed to reduce the visual and physical
impacts of the tower from the public realm and neighboring properties
8 metro-owned
land in focus
This section summarizes key ideas and opportunities
for Metro-owned land on the east bank.
8.0 INTRODUCTION
8.1 EAST BANK PARK
8.2 MOBILITY HUB
8.3 EAST BANK GATEWAY
8.4 CULTURAL TERRACE
8.5 TITANS STADIUM VILLAGE
8.6 PEDESTRIAN BRIDGE EXTENSION
This chapter illustrates and describes key ideas and development guidance
concepts for the Metro-owned land on the East Bank
— emphasizing the creation of dynamic, multi-purpose for all metro-owned land
spaces that will enrich the experience and functionality In addition to the development guidance outlined in
of our city. Chapter 7 - Neighborhoods for Nashvillians, the
following objectives should also be followed for all
Given Metro’s responsibility as stewards of public development on Metro-owned land:
property, the vision for this public-owned land was
developed further than that of the other neighborhood » Ground floors shall be active
catalysts presented in previous chapters. This is » Underground parking may be required, pending
especially true for the East Bank Park — a key feature conditions
that required an integrative feasibility, design, and
planning process. » A parking strategy should be utilized to
determine optimal ratios for the district as a
Other ideas described in this chapter, include a village whole
for stadium-related events and an extension of the » Deliveries shall be accommodated below-grade
existing pedestrian bridge; a mobility hub; sites for new » Development should meet standards set forth in a
mixed-use developments; and sites for civic and cultural comprehensive grading plan — that includes all
uses. Metro-owned land — approved by the city
East Bank Park, from the perspective of a relocated 2. Flooding and river bank analysis,
Titans Stadium, looks out towards the Cumberland River. in coordination with the USACE,
determined that lay back areas
as a riparian edge strategy
could make the East Bank, River
North, and surrounding areas,
more resilient to future flooding
by giving stormwater room to
breathe.
3. A concept of a performative
riparian park between the
stadium and the riverbank was
developed. Stormwater flows
through the park — beginning
at the existing east-west streets
and their ridgelines, through the
various zones of the park and
into the Cumberland River.
1 EVENT PLAZAS
» slows down stormwater
with permeable pavements
and landscapes
» supports local festivals and
markets, and other events
2
3 RIVER’S EDGE
» shows how the natural
environment and resilience
efforts intertwine to mitigate
flooding
» supports observation and
nature trails
4 LIVING SHORELINE
» explore how natural
waterways protect fragile
ecosystems and reintegrate
stormwater 4
3
» supports contact with the
river and nature through
boating and greenways
RUS Bus, a concept for a vibrant, vertically integrated, bus Above: East Bank Gateway concept sketch.
facility and mixed-use development in Raleigh, NC is a Right: Cultural Terrace options A and B concept sketches.
precedent for the East Bank Mobility Hub.
3B
2 3A
8.4 cultural terrace
Nashvillians have made it clear the East Bank
3A
should not just be for tourists. A grouping of
family-friendly, cultural uses — museums, theaters,
3B
galleries, etc. — could be located adjacent to a
landing of an existing bridge to allow for direct
pedestrian access from both sides of the river.
Two potential options for the location of a cultural
terrace have been explored — Option A: south
of Woodland Street and Option B: north of the
John Seigenthaler Pedestrian Bridge. These kinds
of uses will help activate the East Bank and its
neighborhoods on days when the Titans Stadium is
not in use.
9 action items
This section identifies key strategic priorities and critical
next steps to realizing this plan’s vision.
9.0 INTRODUCTION
9.1 IN-PROCESS ACTION ITEMS
9.2 PRIORITY ACTION ITEMS
9.3 FUTURE ACTION ITEMS
implementation of some action items has already been initiated by Establish a design review and approval process — such as a design review committee —
4.
various entities. to ensure proposed developments meet the intent and standards of the vision.
Set aside land on Metro-owned properties for key public resources outlined in the vision,
5. including parks, greenways, rights-of-way, affordable housing, a mobility hub, and
Established a partnership agreement between TDOT and Metro to complete early cultural assets.
1.
acquisition of a portion of the necessary right-of-way for the East Bank Boulevard. Determine the needs for Metro services, such as fire safety, and plan for appropriate
6.
NEPA technical analysis of the East Bank Boulevard is being coordinated with the TDOT allocation in future development agreements.
2.
Local Programs Office. 7. Acquire, or negotiate through agreements, land for public infrastructure.
NDOT’s consultant is completing a mobility analysis (focused on transit, pedestrian, Explore feasibility of creating a Business Improvement District (BID), to support public
3. 8.
cycle, automobiles, freight, etc. trips) for the East Bank’s planned neighborhoods. services and manage assets on the East Bank.
In compliance with Metro Water Service’s current stormwater guidelines, it has been Develop a parking operational plan — that incorporates the needs of the city, mixed-use
established that all new roads on the East Bank are required to be constructed to the 9.
4. developments, and the Titans Stadium — that also aligns with the mobility strategy.
100-year storm event elevation plus one foot. Where possible, roads are to be built at the
most resilient elevation possible.
In conjunction with U.S. Army Corps of Engineers, floodplain modeling has been
5. undertaken to understand the impact of the East Bank’s planned street network and their
elevations on the floodplain.
6.
Metro has retained a consultant to complete a stormwater and resiliency analysis for the 2. advance livability through implementation
Central Waterfront neighborhood on the East Bank.
Utilize the policies and procedures of land development — such as zoning reviews, lease
Extensive infrastructure and housing requests have been made in Metro’s 2023 Capital 1. negotiations, and development incentives — to address community needs like housing,
7.
Improvements Budget to implement portions of the Imagine East Bank vision. fresh food, and childcare.
For each phase of development, establish clear housing benchmarks — consistent with Explore strategic funding or policy models and partnerships that link development with
8. the Imagine East Bank vision and the city’s Unified Housing Strategy — for which Metro is 2. community objectives for equitable and affordable housing, workforce development, and
a landowner or a participant in an agreement with private landowners. educational attainment.
KEY Each action item works towards one or more of the East Bank vision concepts.
EQUITABLE & SAFE & SIMPLE
RESPECT FOR NEIGHBORHOODS
AFFORDABLE MULTIMODAL
THE RIVER FOR NASHVILLIANS
EAST BANK CONNECTIONS
Coordinate with NDOT Engineering to establish a strong access management tool to Improve the utilization of Cumberland Park through a dedicated funding source for parks
3.
18. consolidate vehicular access points on all public roads to facilitate pedestrian/cyclist operations and amenities and encouraging adjacent development.
safety Consider how the area underneath viaducts and the interstate can be transformed into
4.
Clear up visual clutter by burying overhead lines, consolidating access points/curb-cuts, welcoming spaces.
19.
and encouraging pedestrian-scaled signage. Encourage new development to include privately owned and operated publicly-
5.
Continue working with TDOT and NDOT to connect Grace Street to the East Bank accessible open spaces (POPS).
20.
Boulevard via a bicycle/pedestrian-exclusive connection. Establish design, operations, and maintenance standards and a standard Memorandum
6.
As TDOT reassesses the condition of the James Robertson Parkway bridge, explore how of Understanding for publicly-accessible, privately-owned open space (POPS).
21. the approach of the James Roberton Parkway viaduct should be modified in order to Continue to explore opportunities for new open spaces on public-owned land —
create an at-grade crossing with the East Bank Boulevard. 7.
including East Bank Park, and at or around the mobility hub.
Utilize the Mayor’s Office’s Equity by Design tool to prioritize, measure, and gauge Make the entire length of the East Bank and River North waterfronts publicly-accessible,
22. 8.
success of infrastructure projects. either by public ownership or by easements.
Create meaningful interactions between publicly-accessible open spaces and the river
8.
multimobility through piers, overlooks and walkways.
Create meaningful interactions between the publicly-accessible open spaces on both
EAST BANK MOBILITY HUB 9. sides of the river — including to Riverfront Park and Wharf Park — both of which are on
Establish a mobility hub that would serve the various transportation options that are the west bank.
1.
proposed for the East Bank.
GREENWAYS
Integrate a park-and-ride lot (or garage), ride-share pick-up/drop-off zones, bicycle/
2.
scooter parking/storage, and a bike-share station into the mobility hub. Design and build riverfront greenways on the East Bank to connect to planned greenways
10.
Consider partnering with the private sector to build mixed-use buildings, including those in River North and the Oracle pedestrian bridge.
3.
that prioritize affordable housing, on the same block and/or on top of the mobility hub. Pursue a greenway connection between the East Bank and Shelby Bottoms Park along
11.
TRANSIT the Cumberland River.
Ensure high quality transit access for those who do not own a car or who are unable to Pursue a greenway connection between the East Bank and Cleveland Park along
4. 12.
drive due to disability or age. Ellington Parkway.
Continue working with TDOT and NDOT to connect Cleveland Street and Dickerson Pike Pursue a greenway connection between the East Bank and Riverfront Park and the
5. 13.
to the East Bank Boulevard. planned Wharf Park — both of which are on the west bank.
KEY Each action item works towards one or more of the East Bank vision concepts.
EQUITABLE & SAFE & SIMPLE
RESPECT FOR NEIGHBORHOODS
AFFORDABLE MULTIMODAL
THE RIVER FOR NASHVILLIANS
EAST BANK CONNECTIONS
134 eastbank vision plan October 6, 2022 MPC 135
9.3 future action items cont.
further analysis and future studies cont.
URBAN DESIGN/LAND DEVELOPMENT
Undertake viewshed analyses to understand important views in need of preservation and
9.
provide guidance on building placement.
Craft and adopt a design-based zoning tool that reflects the Imagine East Bank vision
10
and its preliminary development guidance, beginning with the Central Waterfront.
Establish regulations that allow greater density on major corridors and centers within the
11.
East Bank.
RIVER
Work with Metro Water Services and consultants to create a district-wide stormwater
12.
management plan for the East Bank.
Work with Metro Water Services and the U.S. Army Corps of Engineers to model
13. the Cumberland River to ensure the long term resiliency of the new neighborhoods is
effective.
Undertake a waterfront investment and management plan to identity the scope of users
14.
on the river and the financial opportunities available.
Undertake a market analysis to understand the demand for boating, docks, marina, and
15.
other boating facilities.
Undertake an operations analysis of potential future river activity and the interaction with
16.
working river.
Understand the scope of capital investments needed to meet the demand for boating
17.
facilities.
STADIUM
Establish a district-wide parking plan for managing parking demand and supply,
18.
including shared parking programs.
Explore the extension of the John Seigenthaler Pedestrian Bridge to terminate further into
19. the East Bank, and/or near the stadium, and to provide multiple opportunities to get on
and off.
IMAGINE EAST BANK
Publish a bi-annual report that updates the Imagine East Bank action item list, and
20
provides the status of all previous action items.
KEY Each action item works towards one or more of the East Bank vision concepts.
EQUITABLE & SAFE & SIMPLE
RESPECT FOR NEIGHBORHOODS
AFFORDABLE MULTIMODAL
THE RIVER FOR NASHVILLIANS
EAST BANK CONNECTIONS