Ali Ardic

400mm medium SD 2.7 t/m3


Granite Cr 35 %
1 Abr 1398 g/t
BRUNO Process Simulation
120 t/h PLANT: Eti Krom Elazig
INFO: Pasa Kirma Eleme
2 TKF8-32-2V LICENSED USER: Ali Ardic
120 Opening 50 mm DATE: 10/01/2022 10:26 AM
66 FILE: Eti krom pasa.brn
Bruno v 4.1.3.9, exe v4.1.0.34, DB v8.90, c1.00 s1.00 nn 211
54 3
66
C80
quarry NOTE! The capacities are maximum capacities in a continuous
troublefree operation when feed material quality and grading curve
Setting 80 mm corresponds to the theoretical curve used in this calculation.
Long term capacities will fluctuate due to the variations in the feed
66
and operating intensity of the plant.

Metso:Outotec does not guarantee any of the calculation results


without our separate written approval based on a detailed study
of the case.

CVB102P 4
#60 mm 219
#40 mm
56
43

99
120
5

GP100S
coarse
Stroke 20 mm
Setting 40 mm

99

120

Copyright Metso:Outotec. All rights reserved.