The document outlines the proposed schedule and milestones for upgrading and expanding the Justice Calixto O. Zaldivar Memorial Hospital. Key steps include:
1) Submitting revised architectural plans by June 1st for comments.
2) Developing permit plans by June 8th and design development plans by June 11th.
3) Getting client approval on plans by June 18th and proceeding with contract documentation plans by July 2nd pending notice to proceed.
4) Submitting plans for client and regulatory approval throughout July with the goal of having final construction plans completed by July 30th.
The document outlines the proposed schedule and milestones for upgrading and expanding the Justice Calixto O. Zaldivar Memorial Hospital. Key steps include:
1) Submitting revised architectural plans by June 1st for comments.
2) Developing permit plans by June 8th and design development plans by June 11th.
3) Getting client approval on plans by June 18th and proceeding with contract documentation plans by July 2nd pending notice to proceed.
4) Submitting plans for client and regulatory approval throughout July with the goal of having final construction plans completed by July 30th.
The document outlines the proposed schedule and milestones for upgrading and expanding the Justice Calixto O. Zaldivar Memorial Hospital. Key steps include:
1) Submitting revised architectural plans by June 1st for comments.
2) Developing permit plans by June 8th and design development plans by June 11th.
3) Getting client approval on plans by June 18th and proceeding with contract documentation plans by July 2nd pending notice to proceed.
4) Submitting plans for client and regulatory approval throughout July with the goal of having final construction plans completed by July 30th.
ZALDIVAR MEMORIAL HOSPITAL ITEM DESCRIPTION OF WORKS PROPOSED REMARKS NO. SCHEDULE/ DATE 1.0 REVISED ARCHITECTURAL One (1) Week One (1) Week PLANS (01June 2018) from receipt of comments. -Submission of revised architectural plans as per DOH and provincial Engineer’s comments for coordination purposes with consultants. 2.0 PERMIT PLANS One (1) week This will have a Double -Architectural and engineering permit (08 June 2018) plotting/ different plans for plans and specification . permit and ‘for construction’ plans . But needs final directive to proceed on plotting of ‘permit plans and specifications’ 3.0 Design Development Plans Two(1) weeks -Architectural and engineering design (11 June 2018) development plans 4.0 Client’s Approval One (1) week This may vary depending -Client’s approval on on architectural (18 June 2018) on client’s length of and engineering design development approval. plan and specifications 5.0 Contract Documentation Plans Two(2) weeks Client to release Notice to -Architectural and engineering (02 July 2018) proceed (NTP) to proceed contract documentation plans on Contract Documentation plans. 6.0 Client’s Approval One (1) week This may vary depending -Client’s approval on on (9 July 2018) on client’s length of Architectural and Engineering approval. contract documentation plans 7.0 Plans for DOH approval One(1) week This may vary depending -Submission of Architectural and (16 July 2018) on Owner’s length of Engineering contract documentation approval. plans for DOH approval. 8.0 For Construction Plans One(1)to two(2) This will depend if there -Submission of Architectural and weeks are still comments with engineering ‘for construction’ plans (July 23 - 30 DOH. 2018) ---NOTHING FOLLOWS---- Hoping for your confirmation on or before 01 June 2018. Thank you.