DETAILS OF TRANSMISSION LINE TOWER

1. 400KV/220KV TOWERS:
Voltage Class & No. of Circuits 400KV DC 400KV SC 200KV DC 200KV SC
Tower Type A B C D A B C D A B C D A B C D
Angle of Deviation 0.2 0.15 0.30 0.60 0.2 0.15 0.30 0.60 0.2 0.15 0.30 0.60 0.2 0.15 0.30 0.60
Total height above ground level in Mtr. 46.3 46.0 46.0 46.0 31.0 31.0 31.0 31.0 32.8 32.6 33.0 33.1 27.4 27.0 27.4 27.9
Height of Bottom cross arms in mtr. 26.3 22.3 22.3 22.3 26.3 22.3 22.3 22.3 22.3 17.5 14.9 14.9 17.6 14.9 14.9 14.1
Base width of Ground Lelvel 10.4 13.6 14.6 14.6 8.1 10 10.1 10.7 5.95 8.5 9.9 10.6 4.2 6.6 6.8 8.1
Approximate Conductor spacing in Mtr.
Vertical 8.0 8.0 8.0 8.0 - - - - 4.9 4.9 5.0 5.0 5 5 5.1 5.6
Horizantal 14.8 17.3 18.3 19.2 11.0 11.6 12.2 13.5 9.2 10.0 11.2 10.4 8.8 8.6 9.5 9.7
Approximate Tower Weight in MT
Normal Tower inclding stubs 9.0 1.5 18.0 23.0 6.0 8.5 9.5 12.6 3.4 5.3 6.2 7.6 2.8 2.8 3.9 4.6
Blot & Nuts 0.4 0.5 0.6 0.7 0.3 0.4 0.4 0.5 0.2 0.2 0.3 0.3 0.1 0.1 0.2 0.2
Approximate foundation volumes in CMT for normal & dry soil foundation
Earth Excavation 16.0 146.0 170.0 300.0 40.0 56.0 87.0 155.0 32.0 48.0 57.0 110.0 28.0 30.0 36.0 58.0
Cement Concrete 6.0 14.0 21.0 23.0 4.1 7.0 9.5 16.5 3.6 5.4 6.8 10.9 3.8 4.0 4.8 7.0
Reinforcement required in MT 0.4 0.6 1.1 2.6 - - 0.6 12.0 - - - - - - - -

2. 110KV & 66KV TOWERS:


Voltage Class & No. of Circuits 110KV DC 110KV SC 66KV DC 66KV SC
Tower Type A B C D A B C D A B C D A B C D
Angle of Deviation 0-2 0-15 0-30 0-60 0-2 0-15 0-30 0-60 0-2 0-15 0-30 0-60 0-2 0-15 0-30 0-60
Total height above ground level in Mtr. 24.5 24.7 26.6 24.9 21.5 21.5 21.6 22.5 19.4 15.9 19.4 20.6 16.8 17.1 17.1 17.2
Height of Bottom cross arms in mtr. 15.1 13.4 13.4 13.4 15.1 13.4 13.4 13.4 12.6 11.4 11.4 11.4 12.3 11.7 11.7 11.7
Base width of Ground Lelvel 4.3 5.4 6.0 7.2 3.4 3.6 4.6 5.4 4.2 5.2 5.3 5.8 2.5 3.4 4.3 4.7
Approximate Conductor spacing in Mtr.
Vertical 3.2 3.2 3.2 3.3 3.2 3.2 3.2 3.2 2.3 2.1 2.2 2.4 2.1 2.2 2.3 2.3
Horizantal 6.0 6.0 6.8 8.8 5.6 4.6 5.8 7.4 4.2 4.4 4.8 6.2 3.7 3.7 4.2 5.4
Approximate Tower Weight in MT
Normal Tower inclding stubs 2.0 3.2 3.3 4.7 1.5 2.1 2.3 3.0 1.3 16 1.9 2.6 1.1 1.4 1.6 2.0
Blot & Nuts 0.05 0.1 0.1 0.2 0.05 0.1 0.1 0.2 0.05 0.07 0.07 0.2 0.05 0.06 0.07 0.1
Approximate foundation volumes in CMT for normal & dry soil foundation
Earth Excavation 24.0 37.0 45.0 67.0 21.0 24.0 29.0 44.0 15.0 21.0 28.0 42.0 18.0 22.0 25.0 36.0
Cement Concrete 2.40 3.40 4.4 7.7 2.2 2.3 2.8 4.3 1.6 2.1 2.7 4.1 2.6 3.0 3.2 4.6
Reinforcement required in MT