MOH-BARMM, HEALTH FACILITY AND DEVELOPMENT DIVISION (TIYAKAP PROJECTS 2021)

Project Contract ID:


Project Name: Completion of Ward, Pharmacy & Laboratory
Project Location: Balindong, Lanao Del Sur

BILL OF QUANTITIES
ITEM NO. DESCRIPTION QTY UNIT UNIT. COST AMOUNT(Php)
PART I FACILITIES FOR THE ENGINEER
In Figures: In Figures:

A.1.1(8) Provision of Field Office for the Engineer (Rental Basis) 7.00 mo In Words:Pesos: In Words:Pesos:

PART II OTHER GENERAL REQUIREMENTS


In Figures: In Figures:

B.3 Permits and Clearances 1.00 l.s. In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

B.5 Project Billboard/ Sign Board 1.00 ea In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

B.7 (1) Occupational Safety and Health Program 7.00 l.s. In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

B.9 Mobilization and Demobilization 1.00 l.s. In Words:Pesos: In Words:Pesos:

PART III CIVIL, ELECTRICAL AND SANITARY/PLUMBING WORKS


PART A EARTHWORKS
In Figures: In Figures:

801(1) Removal of structures and Obstruction 1.00 I.s. In Words:Pesos: In Words:Pesos:

PART B PLAIN AND REINFORCED CONCRETE WORKS


In Figures: In Figures:

900(1)a Structural Concrete (Footing, Column, Tie beam, Slab on fill & Roof Beam) 115.00 m3 In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

902(1)a Reinforcement Bar 16mm (60 ksi) footing 14736.00 kg In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

903(2) Formworks and Falseworks 267.00 m2 In Words:Pesos: In Words:Pesos:

PART C FINISHING WORKS


C.1. Masonry Works
In Figures: In Figures:

1046 100mm& 150mm CHB Non Load Bearing Wall (including Reinforcing Steel) 765.00 m2 In Words:Pesos: In Words:Pesos:

C.2 Fabricated Materials


In Figures: In Figures:

1007 Aluminum Framed Glass Door, Swing Type (Double Swing Door) 17.00 m2 In Words:Pesos: In Words:Pesos:

Page 1
ITEM NO. DESCRIPTION QTY UNIT UNIT. COST AMOUNT(Php)

In Figures: In Figures:

1010(2)b Wooden Panel Door & PVC Panel Door 28.00 m2 In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1008 Aluminum Glass Window ( Sliding) 62.00 sq.m In Words:Pesos: In Words:Pesos:

C.3 Finishing Works


In Figures: In Figures:

1027(1) Cement Plaster Finish 765.00 m2 In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1018(1) Glazed Tiles and Trims 328.00 m2 In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1018(2) Unglazed Tiles 23.00 m2 In Words:Pesos: In Words:Pesos:

C.4 Painting Works


In Figures: In Figures:

1032(1)a Painting Works (Masonry/Concrete ) 765.00 m2 In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1032(1)b Painting Works (Wood ) 134.00 m2 In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1032(1)c Painting Works (Steel) 134.00 m2 In Words:Pesos: In Words:Pesos:

PART D PLUMBING/SANITARY WORKS


In Figures: In Figures:

1001(8) Sewer Line Works 1.00 l.s. In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1002(24) Cold Water Line Works 1.00 l.s. In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1001(9) Storm Drainage and Downspout 1.00 l.s. In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1002(4) Plumbing Fixtures 1.00 l.s. In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1001 (11) Septic Vault (Concrete/CHB) 1.00 l.s. In Words:Pesos: In Words:Pesos:

PART E ELECTRICAL WORKS


In Figures: In Figures:

1100(10) Conduits, Boxes, and Fittings (Conduit Works/ Conduit Rough-in) 1.00 l.s. In Words:Pesos: In Words:Pesos:

Page 2
ITEM NO. DESCRIPTION QTY UNIT UNIT. COST AMOUNT(Php)

In Figures: In Figures:

1101(33) Wires and Wiring Devices 1.00 l.s. In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1102(1) Panelboard with Main & Branch Breakers 1.00 l.s. In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1103(1) Lighting Fixtures and Lamps 1.00 l.s. In Words:Pesos: In Words:Pesos:

PART F MISCELLANEOUS
In Figures: In Figures:

605 Hospital Signage 1.00 l.s. In Words:Pesos: In Words:Pesos:

GRAND TOTAL

Amount in Words:
_________________________________________________________________________
_________________________________________________________________________

Submitted by:

_________________________________________
Name & Signature of Bidder's Representatives

____________________________________
Position

____________________________________
Name of Firm

____________________________________
Address

Page 3