Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Mabini, Davao de Oro
C Earthworks 247,211.48
Fourteen Million Five Hundred Fifty Three Thousand One Hundred Twenty Three Pesos and
77/100.
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de Oro
Location of the Contract : Mabini, Davao de Oro
BILL OF QUANTITIES
Part No. A Part Description : FACILITIES FOR ENGINEER
Section Scope of Work Unit Quantity Quantity Bid Price
No. (Pesos) (Pesos)
(1) (2) (3) (4) (5) (6)
In Words In Words
One Hundred Twenty Four Thousand One Hundred Twenty Four Thousand
Construction of Field Office Lump
A.1.1(3) 1.00 Seven Hundred Twenty Six Pesos Seven Hundred Twenty Six Pesos
for the Engineer Sum
and 56/100. and 56/100.
In Figures 124,726.56 In Figures 124,726.56
In Words
Total for this Part: One Hundred Twenty Four Thousand
Seven Hundred Twenty Six Pesos
and 56/100.
In Figures 124,726.56
Submitted by:
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de Oro
Location of the Contract : Mabini, Davao de Oro
BILL OF QUANTITIES
Part No. B Part Description : OTHER GENERAL REQUIREMENT
Section Scope of Work Unit Quantity Quantity Bid Price
No. (Pesos) (Pesos)
(1) (2) (3) (4) (5) (6)
In Words In Words
Construction Survey and Three Thousand Three Hundred One Twenty Five Thousand Three Hundred
B.4(1) Kilometer 0.13
Staking Pesos and 94/100. Ninety Nine Pesos and 50/100.
In Figures 3,301.94 In Figures 25,399.50
In Words In Words
Nine Thousand Eight Hundred Forty Nineteen Thousand Six Hundred Eighty
B.5 Project Billboard / Signboard Each 2.00
Pesos and 14/100. Thousand Pesos and 28/100.
In Figures 9,840.14 In Figures 19,680.28
In Words In Words
Occupational Safety and Twenty One Thousand Two Hundred One Hundred Twelve Thousand Seventy
B.7(1) Month 5.27
Health Program Sixty Seven Pesos and 54/100. Nine Pesos and 94/100.
In Figures 21,267.54 In Figures 112,079.94
In Words In Words
Lump Seven Hundred Fifty Five Thousand Seven Hundred Fifty Five Thousand
B.9 Mobilization/Demobilization 1.00
Sum Four Hundred Seventy Five Pesos Four Hundred Seventy Five Pesos
In Figures 755,475.00 In Figures 755,475.00
In Words
Total for this Page: Nine Hundred Twelve Thousand Six
Hundred Thirty Four Pesos and 72/100.
In Figures 912,634.72
Submitted by:
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de Oro
Location of the Contract : Mabini, Davao de Oro
BILL OF QUANTITIES
Part No. B Part Description : OTHER GENERAL REQUIREMENT
Section Scope of Work Unit Quantity Quantity Bid Price
No. (Pesos) (Pesos)
(1) (2) (3) (4) (5) (6)
In Words In Words
Linear Four Thousand Three Hundred Eight Hundred Sixty Seven Thousand
B.15(2) Detour/Access Road 200.00
Meter Thirty Six Pesos and 50/100. Three Hundred Pesos.
In Figures 4,336.50 In Figures 867,300.00
In Words
Total for this Page: Eight Hundred Sixty Seven Thousand
Three Hundred Pesos.
In Figures 867,300.00
In Words
Total for this Part: One Million Seven Hundred Seventy Nine
Thousand Nine Hundred Thirty Four
Pesos and 72/100.
In Figures 1,779,934.72
Submitted by:
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de Oro
Location of the Contract : Mabini, Davao de Oro
BILL OF QUANTITIES
Part No. C Part Description : EARTHWORKS
Part Item Description Unit Quantity Quantity Bid Price
No. (Pesos) (Pesos)
(1) (2) (3) (4) (5) (6)
In Words In Words
Thirty Nine Thousand Nine Hundred One Hundred Nineteen Thousand
Structure Excavation Cubic
103(1)a 3.00 Sixteen Pesos and 45/100. Seven Hundred Forty Nine Pesos
(Common Soil) Meter
and 35/100.
In Figures 39,916.45 In Figures 119,749.35
In Words In Words
Cubic Seventeen Thousand Eight Hundred Seventy One Thousand Three Hundred
103(3) Foundation Fill 4.00
Meter Thirty Three Pesos and 86/100. Thirty Five Pesos and 43/100.
In Figures 17,833.86 In Figures 71,335.43
In Words In Words
Pipe Culvert and Drain Cubic Three Thousand Seven Hundred Forty Fifty Six Thousand One Hundred
103(6) 15.00
Excavation Meter One Pesos and 78/100. Twenty Six Pesos and 70/100.
In Figures 3,741.78 In Figures 56,126.70
In Words
Total for this Part: Two Hundred Forty Seven Thousand
Two Hundred Eleven Pesos and 48/100.
In Figures 247,211.48
Submitted by:
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de Oro
Location of the Contract : Mabini, Davao de Oro
BILL OF QUANTITIES
Part No. F Part Description : BRIDGE CONSTRUCTION (DRAINAGE)
Part Item Description Unit Quantity Quantity Bid Price
No. (Pesos) (Pesos)
(1) (2) (3) (4) (5) (6)
In Words In Words
Seventy Nine Pesos and 97/100. Sixty Six Thousand Two Hundred Ninety
404(1)a Reinforcing Steel, Grade 40 Kilogram 829.00
Eight Pesos and 89/100.
In Figures 79.97 In Figures 66,298.89
In Words In Words
Structural Concrete, Cubic Nine Thousand Three Hundred Ninety Seven Hundred Thirty Three Thousand
405(1)a3 78.00
20.68MPa, Class A (28 Days) Meter Eight Pesos and 48/100. Eighty One Pesos and 61/100.
In Figures 9,398.48 In Figures 733,081.61
In Words
Total for this Part: Seven Hundred Ninety Nine Thousand
Three Hundred Eighty Pesos
and 50/100.
In Figures 799,380.50
Submitted by:
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de Oro
Location of the Contract : Mabini, Davao de Oro
BILL OF QUANTITIES
Part No. G Part Description : DRAINAGE AND SLOPE PROTECTION STRUCTURES
Part Item Description Unit Quantity Quantity Bid Price
No. (Pesos) (Pesos)
(1) (2) (3) (4) (5) (6)
In Words In Words
Six Thousand Seven Hundred Sixty Two Hundred Two Thousand Eight
Pipe Culverts, 910mm dia. Linear
500(1)b3 30.00 Two Pesos and 51/100. Hundred Seventy Five Pesos
(36"Ø) Class IV, RCPC Meter
and 20/100.
In Figures 6,762.51 In Figures 202,875.20
In Words
Total for this Page: Two Hundred Two Thousand Eight
Hundred Seventy Five Pesos
and 20/100.
In Figures 202,875.20
Submitted by:
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de Oro
Location of the Contract : Mabini, Davao de Oro
BILL OF QUANTITIES
Part No. I-A Part Description : EARTHWORK
Part Item Description Unit Quantity Quantity Bid Price
No. (Pesos) (Pesos)
(1) (2) (3) (4) (5) (6)
In Words In Words
Two Hundred Forty Six Pesos Two Hundred Ninety Two Thousand
Square
1700(1) Clearing and Grubbing 1,185.00 and 96/100. Six Hundred Fifty One Pesos
Meter
and 80/100.
In Figures 246.96 In Figures 292,651.80
In Words In Words
Individual Removal of Trees, Nineteen Thousand Eighty Pesos Two Hundred Nine Thousand Eight
1700(3)a1 Each 11.00
150-300mm, dia. (Small) and 60/100. Hundred Eighty Six Pesos and 60/100.
In Figures 19,080.60 In Figures 209,886.60
In Words In Words
Surplus Excavation Cubic One Hundred Twenty Six Pesos One Hundred Nine Thousand Thirty
1702(1)a 863.00
(Common Soil) Meter and 34/100. Two Pesos.
In Figures 126.34 In Figures 109,032.00
In Words In Words
One Thousand Two Hundred Six Two Hundred Nineteen Thousand
Embankment (From Cubic
1704(1)a 182.00 Pesos and 49/100. Five Hundred Eighty One Pesos
Excavation) Meter
and 78/100.
In Figures 1,206.49 In Figures 219,581.78
In Words
Total for this Page: Eight Hundred Thirty One Thousand
One Hundred Fifty Two Pesos
and 18/100.
In Figures 831,152.18
Submitted by:
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de Oro
Location of the Contract : Mabini, Davao de Oro
BILL OF QUANTITIES
Part No. I-A Part Description : EARTHWORK
Part Item Description Unit Quantity Quantity Bid Price
No. (Pesos) (Pesos)
(1) (2) (3) (4) (5) (6)
In Words In Words
Cubic Two Hundred Twenty Seven Pesos Two Hundred Nine Thousand Six Hundred
1704(1)b Embankment (From Borrow) 920.00
Meter and 90/100. Sixty Nine Pesos and 78/100.
In Figures 227.90 In Figures 209,669.78
In Words
Total for this Part: One Million Forty Thousand Eight
Hundred Twenty One Pesos and 95/100.
In Figures 1,040,821.95
Submitted by:
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de Oro
Location of the Contract : Mabini, Davao de Oro
BILL OF QUANTITIES
Part No. I-B Part Description : BANK & SLOPE PROTECTION WORKS
Part Item Description Unit Quantity Quantity Bid Price
No. (Pesos) (Pesos)
(1) (2) (3) (4) (5) (6)
In Words In Words
Four Thousand Nine Hundred Ten One Million Three Hundred Forty Five
Cubic
1710(2)a Grouted Riprap (Class A) 274.00 Pesos and 38/100. Thousand Four Hundred Forty Three
Meter
Pesos and 54/100.
In Figures 4,910.38 In Figures 1,345,443.54
In Words In Words
Cubic Ten Thousand Five Hundred Thirty Eighty Four Thousand Two Hundred
1711(1) Stone Masonry 8.00
Meter Five Pesos and 53/100. Eighty Four Pesos and 21/100.
In Figures 10,535.53 In Figures 84,284.21
In Words In Words
One Thousand Sixty Five Pesos One Hundred Sixty Eight Thousand
Cubic
1712(2) Concrete, Slope Protection 158.00 and 54/100. Three Hundred Fifty Five Pesos
Meter
and 32/100
In Figures 1,065.54 In Figures 168,355.32
In Words In Words
Steel Sheet Piles, Slope Linear Eight Thousand Six Hundred Thirty Eight Million Seven Hundred Sixty
1717(2)a1 1,014.00
Protection Meter Nine Pesos and 14/100. Thousand Ninety Pesos and 30/100.
In Figures 8,639.14 In Figures 8,760,090.30
In Words
Total for this Part: Ten Million Three Hundred Fifty Eight
Thousand One Hundred Seventy Three
Pesos and 38/100
In Figures 10,358,173.38
In Words
Grand Total for this Project: Fourteen Million Five Hundred Fifty
Three Thousand One Hundred Twenty
Three Pesos and 77/100.
In Figures 14,553,123.77
Submitted by:
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Compostela Valley Province
DETAILED ESTIMATES
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL 14,000.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 14,000.00
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL 14,000.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 14,000.00
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL 37,760.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 37,760.00
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL -
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P -
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL -
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P -
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL 16,400.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 16,400.00
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL 22,000.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 22,000.00
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL 22,000.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 22,000.00
Contract ID : 21LA0135
Contract Name :
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de Oro
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL 16,800.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 16,800.00
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL 77,600.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 77,600.00
Contract ID : 21LA0135
Contract Name :
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de Oro
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL 42,800.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 42,800.00
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
Output = 1,185.00 sq.m../1200 sq.m./day = 0.99 say 1.0
SUB-TOTAL 22,200.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 22,200.00
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL 21,800.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 21,800.00
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
Output = 863.00 cu.m./150 cu.m./day "Excavator " = 9.59 say 10.00 day/s
SUB-TOTAL -
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P -
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL 29,000.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 29,000.00
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL 24,500.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 24,500.00
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL 109,800.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 109,800.00
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL 29,600.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 29,600.00
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL -
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P -
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Construction of Revetment along Pindasan River Baybay, Mabini, Davao de
Oro
Location of the Contract : Mabini, Davao de Oro
DETAILED ESTIMATES
I. EQUIPMENT RENTAL/MATERIALS:
SUB-TOTAL 21,800.00
Plus % Fringe Benefits -
TOTAL Direct Labor Cost P 21,800.00
No. of trips per day = 7.5 hrs./day x 60min./hr. = 450 = 11.82 trips/day
Total DT travel time 38.07
say 11.00 trips/day
=
No. of days to complete hauling = 863.00 cu.m. 3.27 days
Loader Requirement:
No. of trips per day = 7.5 hrs./day x 60min./hr. = 450 = 11.82 trips/day
Total DT travel time 38.07
say 11.00 trips/day
=
No. of days to complete hauling = 209.30 cu.m. 0.79 days
Loader Requirement:
No. of trips per day = 7.5 hrs./day x 60min./hr. = 450 = 5.21 trips/day
Total DT travel time 86.29
say 5.00 trips/day
=
No. of days to complete hauling = 209.30 cu.m. 1.74 days
Loader Requirement:
Equipments Required:
GRADER: for spreading 1 unit
Capacity: 60 cu.m/hr 7 hrs/day
Capacity/day: 1 unit x 60 x 7 = 420.00 sq.m/day
No.of days required: 227.50 / 420.00 = 0.54 days say 1.0 days
COMPACTOR: 1 unit
Capacity: 30 cu.m/hr 7 hrs/day
Capacity/day: 1 unit x 30 x 7 = 210.00 cu.m/day
No. of days required: 227.50 / 210.00 = 1.08 days say 1.0 days
Equipments Required:
GRADER: for spreading 1 unit
Capacity: 60 cu.m/hr 7 hrs/day
Capacity/day: 1 unit x 60 x 7 = 420.00 sq.m/day
No.of days required: 227.50 / 420.00 = 0.54 days say 1.0 days
COMPACTOR: 1 unit
Capacity: 30 cu.m/hr 7 hrs/day
Capacity/day: 1 unit x 30 x 7 = 210.00 cu.m/day
No. of days required: 227.50 / 210.00 = 1.08 days say 1.0 days
BACK-UP COMPUTATION
5b/8
Equipments Required :
GRADER: for spreading 1 unit
Capacity: 60 cu.m/hr 7 hrs/day
Capacity/day: 1 unit x 60 x 7 = 420.00 cu.m/day
No. of days required: 209.30 / 420 = 0.50 days say 1.0 days
COMPACTOR: 1 unit
Capacity: 30 cu.m/hr 7 hrs/day
Capacity/day: 1 unit x 30 x 7 = 210.00 cu.m/day
No. of days required: 209.30 / 210.00 = 1.00 days say 1.0 days
BACK - UP COMPUTATION
506 Riprap
Quantity:
Volume Multiplier
Cement = #REF! x 4 = #REF! bags say #REF! bags
Sand = #REF! x 0.625 = #REF! say #REF! cu.m.
Boulders = #REF! x 1.05 = #REF! say #REF! cu.m.
Quantity:
Volume Multiplier
Cement = #REF! x 4.25 = #REF! bags say #REF! bags
Sand = #REF! x 0.625 = #REF! say #REF! cu.m.
Boulders = #REF! x 1.05 = #REF! say #REF! cu.m.
BACK UP COMPUTATIONS
Page: 8a/12
No. of Cement:
No. of Days
Vol per blocks = Pavement Thicknes x (Pavement width) x Length per block of 4.50m
= 3.47
say 3.47 cu.m.
= 63.02
7.0 x 3.47
= 2.59 days
say 3.00 days
Asphalt Filler:
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao
de Oro
Location of the Contract : Mabini, Davao de Oro
MANPOWER
Project Engineer 1,000.00 / day
C & M Foreman / Eng'ng Assistant 650.00 / day
Laborer / T&C Helper 350.00 / day
Mason/ Steelman/ Carpenter/ Painter 475.00 / day
Welder/Eletrician 420.00 / day
H.E.O. (Bulldozer/Excavator/Loader/Grader/Crane/Prime Mover) 550.00 / day
Driver (Dumptruck/Water Truck) 475.00 / day
L.E.O. (Compactor, Vibrator, Mixer) 425.00 / day
Submitted by:
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao
de Oro
Location of the Contract : Mabini, Davao de Oro
MATERIALS
Portland Cement 255.00 / bag
CHB 4" thk. 20.00 / pcs
Reinforcing Steel (Grade 40) 42.00 / kgs.
Tie Wire # 16 76.00 / kgs.
Hacksaw Blade 70.00 / pcs
Washed Gravel 600.00 / cu.m.
Washed Gravel Y-Y 700.00 / cu.m.
Washed Sand 600.00 / cu.m.
Aggregate Base Course 500.00 / cu.m.
Aggregate Sub-Base Course 500.00 / cu.m.
Boulders 800.00 / cu.m.
Goodmix 600.00 / cu.m.
Embankment Borrow 1,219.50 / cu.m.
CWN 5" 1,410.00 / keg
CWN 4" 1,305.00 / keg
CWN 4" 65.00 / kgs.
CWN 3" 1,350.00 / keg
CWN 3" 65.00 / kgs.
CWN 2 1/2" 1,863.00 / keg
CWN 2 1/2" 72.00 / kgs.
CWN 1 1/2" 1,800.00 / keg
CWN 1 1/2" 75.00 / kgs.
Angle Bar 100mm x 100mm x 9mm thk. x 6m 13,550.00 / length
PLAIN G.I. SHEET, 0.04mm thk x 4' x 8' type II, Grade C 535.00 / sht
ORDINARY PLYWOOD, GRADE B(INTERIOR), 17mm thk. x 4' x 8' 890.00 / sht
ORDINARY PLYWOOD, PS MARKED, 10mm thk. x 4' x 8' 612.00 / sht
ORDINARY PLYWOOD, 5mm thk. x 4' x 8' type II Grade C 330.00 / sht
610 mm PIPE CULVERT 1,560.00 / pcs
910 mm PIPE CULVERT 2,500.00 / pcs
1220 mm PIPE CULVERT 7,500.00 / pcs
Submitted by:
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao
de Oro
Location of the Contract : Mabini, Davao de Oro
MATERIALS
PERFORATED PVC PIPE (10cm) 400.00 / length
PERFORATED PVC PIPE (5cm) 360.00 / length
HDPE PIPE SDR 17, 2"Ø 140.00 / mtrs
LAUAN LUMBER 35.00 / bd.ft.
GEMELINA LUMBER 32.00 / bd.ft.
YAKAL LUMBER 55.00 / bd.ft.
COCO LUMBER 20.00 / bd.ft.
COCO TRUNKS 1,500.00 / pcs
0.30m x 7.73 Ga #22 COPPER SHEET 4,500.00 / units
PAINT, PERMACOAT LATEX PAINT 515.00 / gals
REFLECTORIZED TRAFFIC PAINT (YELLOW). PREM. GRADE 2,900.00 / gals
PAINT, LATEX TINTING COLOR (BLACK) 40.00 / cans
CONCRETE NUETRALIZER (ORDINARY) 300.00 / gals
ROLLER BRUSH SET #7 90.00 / pcs
4" PAINT BRUSH 45.00 / pcs
3" PAINT BRUSH 45.00 / pcs
2" PAINT BRUSH 45.00 / pcs
STANDARD BEARING PLATE 32,000.00 / sets
STANDARD EXPANSION BEARING PLANTS 32,000.00 / sets
Steel Sheet Pile 6,792.20 / Li.m.
Submitted by:
Contract ID : 21LA0135
Contract Name : Construction of Revetment along Pindasan River Baybay, Mabini, Davao de Oro
Location of the Contract : Mabini, Davao de Oro
ABC : ₱14,699,920.95
YEAR
PARTICULAR TOTAL
FIRST QUARTER SECOND QUARTER THIRD QUARTER FOURTH QUARTER
Percentage Accomplishment 100.00% 3.91% 4.47% 22.85% 68.77%
AMOUNT 569,710.24 649,931.80 3,324,706.97 10,008,774.77
Cumulative Percentage Accomplishment 100.00% 3.91% 8.38% 31.23% 100.00%
AMOUNT 569,710.24 1,219,642.04 4,544,349.01 14,553,123.77
Submitted by: