Department of Public Works and Highways

Contract ID: 21L00179


Contract Name: Repair of Evacuation Center at Brgy. Matti, Digos City, Davao Del Sur
Location of the Contract: Brgy. Matti, Digos City, Davao Del Sur
------------------------------------------------------------------------------------------

BILL OF QUANTITES
PART II & III
Pay Item Unit Price
Description Unit Quantity Amount (Pesos)
No. (Pesos)
(1) (2) (3) (4) (5) (6)
PART II – OTHER GENERAL REQUIREMENTS
PART B – OTHER GENERAL REQUIREMENTS
In words: In words:
Project Billboard /
B.5 each 1.00
Signboard In figures: In figures:

In words: In words:
Occupational Safety and
B.7(2) ls 1.00
Health Program In figures: In figures:

In words: In words:
Mobilization /
B.9 ls 1.00
Demobilization In figures: In figures:

PART H – MISCELLANEOUS STRUCTURES


628(3) Epoxy Injection on Crack ln m 15.00
PART III – CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS
PART A – EARTWORKS
In words: In words:
Removal of Structures
801(1) ls 1.00
and Obstruction In figures: In figures:

PART B – PLAIN AND REINFORCED CONCRETE WORKS


In words: In words:
Structural Concrete
900(1)c4 (Columns), Class A 28 cu m 13.00
In figures: In figures:
days
Sub-Total for this Page

----------------------------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 1 of 1
Department of Public Works and Highways
Contract ID: 21L00179
Contract Name: Repair of Evacuation Center at Brgy. Matti, Digos City, Davao Del Sur
Location of the Contract: Brgy. Matti, Digos City, Davao Del Sur
------------------------------------------------------------------------------------------

BILL OF QUANTITES
PART III
Pay Item Unit Price
Description Unit Quantity Amount (Pesos)
No. (Pesos)
(1) (2) (3) (4) (5) (6)
In words: In words:
Structural Concrete
900(1)c6 (Beams/Girders), Class cu m 15.00
In figures: In figures:
A 28 days
In words: In words:
Reinforcing Steel
902(1)a cu m 5,106.00
(Deformed), Grade 40 In figures: In figures:

In words: In words:
Formworks and
903(2) sq m 1,895.00
Falseworks In figures: In figures:

PART C – FINISHING AND OTHER CIVIL WORKS


In words: In words:
1001(8) Sewer Line ls 1.00
In figures: In figures:

In words: In words:
Ceiling (4.5mm Metal
1003(1)b1 Frame Marine sq m 657.00
In figures: In figures:
Plywood)
In words: In words:
Waterproofing (cement
1016(1)a sq m 302.00
base) In figures: In figures:

In words: In words:
1018(1) Glazed Tiles and Trims sq m 151.00
In figures: In figures:

In words: In words:
1027(1) Cement Plaster Finish sq m 2,332.00
In figures: In figures:

----------------------------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 1 of 1
Department of Public Works and Highways
Contract ID: 21L00179
Contract Name: Repair of Evacuation Center at Brgy. Matti, Digos City, Davao Del Sur
Location of the Contract: Brgy. Matti, Digos City, Davao Del Sur
------------------------------------------------------------------------------------------

BILL OF QUANTITES
PART III
Pay Item Unit Price
Description Unit Quantity Amount (Pesos)
No. (Pesos)
(1) (2) (3) (4) (5) (6)
In words: In words:
Structural Concrete
1032(1)a (Beams/Girders), Class cu m 15.00
In figures: In figures:
A 28 days

----------------------------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 1 of 1