Professional Documents
Culture Documents
Underground mine
Facilities and Surface
Germany's last
Facilities coal mine closes
Kuliah ke 2
Tambang Bawah Tanah
Oleh:
Dr. Ir. Singgih Saptono, MT.
• Construction excavation occurred between 30 and 700 feet • The project included A Main Access Shaft (Conventionally • FKC-Lake Shore Hoisting Systems: To complete the turn-key • his project involves the design and construction of a 22-foot
underground, utilizing conventional mining methods Excavated); An Underground Drilling Gallery; An Emergency package, FKC-Lake Shore provided design-build-install (inside diameter), dual compartment, concrete-lined shaft.
including mechanical, or road-header excavation, and Escape/Ventilation Shaft (Raise Bored); A Tunnel Connecting services for a 20-ton Service Hoist, 5-man Auxiliary Hoist, and The shaft is being constructed using the bore and slash
controlled detonation where needed for hard rock removal. the Two Shafts (Drill & Blast Methods); A Permanent 80-ton Slope Hoisting System complete with Headframe, method.
Extensive dewatering and tunnel reinforcement were used for Headframe and Hoisting System; The Hybridized Cages, Counterweight, Brakeman Car, Ropes, and
groundwater inflows and unstable ground along the tunnel Ventilation/Emergency Escape Hoisting System. Attachments.
alignment.
• Shaft & Slope: Frontier-Kemper Constructors recently
completed the design and construction of one (1) dual
compartment, concrete-lined, 30-foot diameter Shaft and one
(1) dual compartment, over/under Slope for Gibson County
Coal's Gibson South Mine.
https://structurae.net/en/media/233354-erin-coal-mine-shaft-7-headframe