PAKET : PRESERVASI JALAN AWUNIO - BTS.

KOTA KENDARI - BANDARA HALUOLEO - POHARA


KONTRAKTOR : PT. MAWAR ENAM SEMBILAN
PEKERJAAN : LAPIS PEREKAT ASPAL CAIR ( EMULSI )
OUTPUT : REHABILITASI MINOR
RUAS : BTS.KOTA -LAPUKO
TANGGAL UJI : 22 MEI 2021

HASIL TES TAKARAN PEMAKAIAN TACK COAT

P Berat Kertas + Berat Berat Jenis Takaran


Titik Uji O
Berat Kertas Luas Kertas
S Sample Sample Sample Pemakaian
No. I
S
I
(Sta.) (gr) (gr) (gr) (m2) (gr/cc) (Liter/m2)

1 11+950 L 26.5 6.0 20.5 0.0625 1.030 0.318


2 12+000 L 27.0 6.0 21.0 0.0625 0.326
3 12+050 L 59.3 6.0 53.3 0.0625 0.828
4 12+100 L 57.9 6.0 51.9 0.0625 0.806
5 12+150 R 58.0 6.0 52.0 0.0625 0.808
6 12+200 R 57.7 6.0 51.7 0.0625 0.803
7 12+250 R 15.7 6.0 9.7 0.0625 0.151
8 12+300 R 16.0 6.0 10.0 0.0625 0.155
9 12+350 L 16.0 6.0 10.0 0.0625 0.155

RATA- RATA PEMAKAIAN PRIME COAT 0.322


RATA- RATA PEMAKAIAN TACK COAT -

STA : 11 + 900 s/d 12 + 000 (Kiri)


REHAB. MINOR

Diketahui : Diperiksa : Dibuat :


Direksi, Konsultan Pengawas Kontraktor Pelaksana,
KEMENTRIAN PEKERJAAN UMUM PT. GLOBAL PROFEX SYNERGI J.O PT. MAWAR ENAM SEMBILAN
DAN PERUMAHAN RAKYAT PT. SEECON'S

Tasman Muhammad Riski,ST Burhan,ST


Nip. 19690717 200701 1 004 (Material Teknisi) (Quality Kontrol)
PAKET : PRESERVASI JALAN AWUNIO - BTS.KOTA KENDARI - BANDARA HALUOLEO - POHARA
KONTRAKTOR : PT. MAWAR ENAM SEMBILAN
PEKERJAAN : LAPIS PEREKAT ASPAL CAIR ( EMULSI )
OUTPUT : REHABILITASI MINOR
RUAS : BTS.KOTA -LAPUKO
TANGGAL UJI : 23 MEI 2021

HASIL TES TAKARAN PEMAKAIAN TACK COAT

P Berat Kertas + Berat Berat Jenis Takaran


Titik Uji O Berat Kertas Luas Kertas
No. S Sample Sample Sample Pemakaian
I
S
I
(Sta.) (gr) (gr) (gr) (m2) (gr/cc) (Liter/m2)

1 11+950 R 25.6 6.0 19.6 0.0625 1.030 0.304


2 12+000 R 26.3 6.0 20.3 0.0625 0.315
3 12+050 R 58.1 6.0 52.1 0.0625 0.809
4 12+100 R 58.9 6.0 52.9 0.0625 0.822
5 12+150 R 59.0 6.0 53.0 0.0625 0.823
6 12+200 R 59.7 6.0 53.7 0.0625 0.834
7 12+250 L 15.5 6.0 9.5 0.0625 0.148
8 12+300 L 16.1 6.0 10.1 0.0625 0.157

RATA- RATA PEMAKAIAN PRIME COAT 0.310

: STA 11 + 917 s/d 12 + 000 (Kanan)


REHAB. MINOR

Diketahui : Diperiksa : Dibuat :


Direksi, Konsultan Pengawas Kontraktor Pelaksana,
KEMENTRIAN PEKERJAAN UMUM PT. GLOBAL PROFEX SYNERGI J.O PT. MAWAR ENAM SEMBILAN
DAN PERUMAHAN RAKYAT PT. SEECON'S

Tasman Muhammad Riski,ST Burhan,ST


Nip. 19690717 200701 1 004 (Material Teknisi) (Quality Kontrol)
PAKET : PRESERVASI JALAN AWUNIO - BTS.KOTA KENDARI - BANDARA HALUOLEO - POHARA
KONTRAKTOR : PT. MAWAR ENAM SEMBILAN
PEKERJAAN : LAPIS PEREKAT ASPAL CAIR ( EMULSI )
OUTPUT : REHABILITASI MINOR
RUAS : BTS.KOTA -LAPUKO
TANGGAL UJI : 24 MEI 2021

HASIL TES TAKARAN PEMAKAIAN TACK COAT

P Berat Kertas + Berat Berat Jenis Takaran


Titik Uji O Berat Kertas Luas Kertas
No. S Sample Sample Sample Pemakaian
I
S
I
(Sta.) (gr) (gr) (gr) (m2) (gr/cc) (Liter/m2)

1 2+355 L 26.1 6.0 20.1 0.0625 1.030 0.312


2 2+400 L 25.5 6.0 19.5 0.0625 0.303
3 2+450 L 26.2 6.0 20.2 0.0625 0.314
4 2+500 L 25.9 6.0 19.9 0.0625 0.309
5 2+550 L 59.0 6.0 53.0 0.0625 0.823
6 2+600 L 59.7 6.0 53.7 0.0625 0.834
7 2+650 L 56.9 6.0 50.9 0.0625 0.791
8 2+700 L 57.0 6.0 51.0 0.0625 0.792
9 2+750 L 57.7 6.0 51.7 0.0625 0.803

RATA- RATA PEMAKAIAN PRIME COAT 0.310

: STA 2 + 352 s/d 2 + 519 (Kiri)


REHAB. MINOR

Diketahui : Diperiksa : Dibuat :


Direksi, Konsultan Pengawas Kontraktor Pelaksana,
KEMENTRIAN PEKERJAAN UMUM PT. GLOBAL PROFEX SYNERGI J.O PT. MAWAR ENAM SEMBILAN
DAN PERUMAHAN RAKYAT PT. SEECON'S

Tasman Muhammad Riski,ST Burhan,ST


Nip. 19690717 200701 1 004 (Material Teknisi) (Quality Kontrol)
PAKET : PRESERVASI JALAN BTS.PROV.SULTENG-ASERA-BELALO/LASOLO
DAN DUPLIKASI JEMBATAN S.ANGGOMATE
KONTRAKTOR : PT. ANEKA LAKSANA CITRAPRIMA
PEKERJAAN : LAPIS PEREKAT ( TACK COAT COAT )
OUTPUT : REHABILITASI MINOR
TANGGAL UJI : 7-Apr-22

HASIL TES TAKARAN PEMAKAIAN TACK COAT

P
Titik Uji O Berat Kertas + Berat Kertas Berat
Luas Kertas
Berat Jenis Takaran
S Sample Sample Sample Pemakaian
No.
I
(Sta.) S (gr) (gr) (gr) (m2) (gr/cc) (Liter/m2)
I

1 0 + 000 L 23.3 6.0 17.3 0.0625 1.030 0.269


2 0 + 000 L 22.1 6.0 16.1 0.0625 0.250
3 0 + 100 R 23.4 6.0 17.4 0.0625 0.270
4 0 + 100 R 22.7 6.0 16.7 0.0625 0.259

RATA- RATA PEMAKAIAN TACK COAT 0.262

Disetujui Diperiksa Dibuat/Dilaksanakan


Direksi, Konsultan Pengawas Kontraktor Pelaksana,
KEMENTRIAN PEKERJAAN UMUM PT. MITRA MANDIRI KONSULTAMA J.O PT. ANEKA LAKSANA CITRAPRIMA
DAN PERUMAHAN RAKYAT CV. ANNISHA MITRAYASA

I Made Suarsa Vaizi Yudistira Riman Burhan,ST


Nip 19681231 200212 1 026 (Material Teknisi) (Quality Kontrol)
PAKET : PRESERVASI JALAN BTS.PROV.SULTENG-ASERA-BELALO/LASOLO
DAN DUPLIKASI JEMBATAN S.ANGGOMATE
KONTRAKTOR : PT. ANEKA LAKSANA CITRAPRIMA
PEKERJAAN : LAPIS RESAP PENGIKAT ( PREAM COAT )
OUTPUT : REKONSTRUKSI JALAN
TANGGAL UJI : 16-Apr-22

HASIL TES TAKARAN PEMAKAIAN PRIME COAT

P
Titik Uji O Berat Kertas + Berat Kertas Berat
Luas Kertas
Berat Jenis Takaran
S Sample Sample Sample Pemakaian
No.
I
(Sta.) S (gr) (gr) (gr) (m2) (gr/cc) (Liter/m2)
I

1 47 + 300 L 61.3 6.0 55.3 0.0625 1.030 0.859


2 47 + 400 L 57.8 6.0 51.8 0.0625 0.805
3 47 + 500 L 59.4 6.0 53.4 0.0625 0.830
4 47 + 600 L 60.0 6.0 54.0 0.0625 0.839
5 47 + 700 L 61.0 6.0 55.0 0.0625 0.854

RATA- RATA PEMAKAIAN PRIME COAT 0.837

Disetujui Diperiksa Dibuat/Dilaksanakan


Direksi, Konsultan Pengawas Kontraktor Pelaksana,
KEMENTRIAN PEKERJAAN UMUM PT. MITRA MANDIRI KONSULTAMA J.O PT. ANEKA LAKSANA CITRAPRIMA
DAN PERUMAHAN RAKYAT CV. ANNISHA MITRAYASA

I Made Suarsa Vaizi Yudistira Riman Burhan,ST


Nip 19681231 200212 1 026 (Material Teknisi) (Quality Kontrol)
PAKET : PRESERVASI JALAN BTS.PROV.SULTENG-ASERA-BELALO/LASOLO
DAN DUPLIKASI JEMBATAN S.ANGGOMATE
KONTRAKTOR : PT. ANEKA LAKSANA CITRAPRIMA
PEKERJAAN : LAPIS RESAP PENGIKAT ( PREAM COAT )
OUTPUT : REKONSTRUKSI JALAN
TANGGAL UJI : 17-Apr-22

HASIL TES TAKARAN PEMAKAIAN PRIME COAT

P
Titik Uji O Berat Kertas + Berat Kertas Berat
Luas Kertas
Berat Jenis Takaran
S Sample Sample Sample Pemakaian
No.
I
(Sta.) S (gr) (gr) (gr) (m2) (gr/cc) (Liter/m2)
I

1 47 + 800 L 58.8 6.0 52.8 0.0625 1.030 0.820


2 47 + 900 L 60.7 6.0 54.7 0.0625 0.850
3 48 + 000 L 57.9 6.0 51.9 0.0625 0.806
4 48 + 100 L 59.5 6.0 53.5 0.0625 0.831

RATA- RATA PEMAKAIAN PRIME COAT 0.827

Disetujui Diperiksa Dibuat/Dilaksanakan


Direksi, Konsultan Pengawas Kontraktor Pelaksana,
KEMENTRIAN PEKERJAAN UMUM PT. MITRA MANDIRI KONSULTAMA J.O PT. ANEKA LAKSANA CITRAPRIMA
DAN PERUMAHAN RAKYAT CV. ANNISHA MITRAYASA

I Made Suarsa Vaizi Yudistira Riman Burhan,ST


Nip 19681231 200212 1 026 (Material Teknisi) (Quality Kontrol)
PAKET : PRESERVASI JALAN BTS.PROV.SULTENG-ASERA-BELALO/LASOLO
DAN DUPLIKASI JEMBATAN S.ANGGOMATE
KONTRAKTOR : PT. ANEKA LAKSANA CITRAPRIMA
PEKERJAAN : LAPIS RESAP PENGIKAT ( PREAM COAT )
OUTPUT : REKONSTRUKSI JALAN
TANGGAL UJI : 18-Apr-22

HASIL TES TAKARAN PEMAKAIAN PRIME COAT

P
Titik Uji O Berat Kertas + Berat Kertas Berat
Luas Kertas
Berat Jenis Takaran
S Sample Sample Sample Pemakaian
No.
I
(Sta.) S (gr) (gr) (gr) (m2) (gr/cc) (Liter/m2)
I

1 47 + 800 R 60.5 6.0 54.5 0.0625 1.030 0.847


2 47 + 900 R 61.2 6.0 55.2 0.0625 0.857
3 48 + 000 R 60.3 6.0 54.3 0.0625 0.843
4 48 + 100 R 58.4 6.0 52.4 0.0625 0.814

RATA- RATA PEMAKAIAN PRIME COAT 0.840

Disetujui Diperiksa Dibuat/Dilaksanakan


Direksi, Konsultan Pengawas Kontraktor Pelaksana,
KEMENTRIAN PEKERJAAN UMUM PT. MITRA MANDIRI KONSULTAMA J.O PT. ANEKA LAKSANA CITRAPRIMA
DAN PERUMAHAN RAKYAT CV. ANNISHA MITRAYASA

I Made Suarsa Vaizi Yudistira Riman Burhan,ST


Nip 19681231 200212 1 026 (Material Teknisi) (Quality Kontrol)
PAKET : PRESERVASI JALAN BTS.PROV.SULTENG-ASERA-BELALO/LASOLO
DAN DUPLIKASI JEMBATAN S.ANGGOMATE
KONTRAKTOR : PT. ANEKA LAKSANA CITRAPRIMA
PEKERJAAN : LAPIS RESAP PENGIKAT ( PREAM COAT )
OUTPUT : REKONSTRUKSI JALAN
TANGGAL UJI : 19-Apr-22

HASIL TES TAKARAN PEMAKAIAN PRIME COAT

P
Titik Uji O Berat Kertas + Berat Kertas Berat
Luas Kertas
Berat Jenis Takaran
S Sample Sample Sample Pemakaian
No.
I
(Sta.) S (gr) (gr) (gr) (m2) (gr/cc) (Liter/m2)
I

1 48 + 200 L 59.1 6.0 53.1 0.0625 1.030 0.825


2 48 + 300 L 60.3 6.0 54.3 0.0625 0.843
3 48 + 200 R 59.1 6.0 53.1 0.0625 0.825
4 48 + 300 R 59.0 6.0 53.0 0.0625 0.823

RATA- RATA PEMAKAIAN PRIME COAT 0.829

Disetujui Diperiksa Dibuat/Dilaksanakan


Direksi, Konsultan Pengawas Kontraktor Pelaksana,
KEMENTRIAN PEKERJAAN UMUM PT. MITRA MANDIRI KONSULTAMA J.O PT. ANEKA LAKSANA CITRAPRIMA
DAN PERUMAHAN RAKYAT CV. ANNISHA MITRAYASA

I Made Suarsa Vaizi Yudistira Riman Burhan,ST


Nip 19681231 200212 1 026 (Material Teknisi) (Quality Kontrol)
PAKET : PRESERVASI JALAN AWUNIO - BTS.KOTA KENDARI - BANDARA HALUOLEO - POHARA
KONTRAKTOR : PT. MAWAR ENAM SEMBILAN
PEKERJAAN : LAPIS RESAP PENGIKAT ASPAL CAIR ( EMULSI )
OUTPUT : LONGSORAN POHARA
TANGGAL UJI : 06 AGUSTUS 2021

HASIL TES TAKARAN PEMAKAIAN PRIME COAT

P Berat Kertas + Berat Berat Jenis Takaran


Titik Uji O Berat Kertas Luas Kertas
S Sample Sample Sample Pemakaian
No. I
S
I
(Sta.) (gr) (gr) (gr) (m2) (gr/cc) (Liter/m2)

1 0+000 R 72.1 6.0 66.1 0.0625 1.030 1.027


2 0+050 R 73.4 6.0 67.4 0.0625 1.047

3 17+300 R 16.9 6.0 10.9 0.0625 0.169


4 17+350 R 15.8 6.0 9.8 0.0625 0.152
5 17+400 R 15.7 6.0 9.7 0.0625 0.151
6 17+450 R 15.8 6.0 9.8 0.0625 0.152
7 17+500 R 16.0 6.0 10.0 0.0625 0.155
8 17+550 R 15.8 6.0 9.8 0.0625 0.152
9 17+600 R 15.9 6.0 9.9 0.0625 0.154
10 17+650 R 16.4 6.0 10.4 0.0625 0.162
17+700 57.7 6.0 51.7 0.0625 0.803
11 16+800 R 15.9 6.0 9.9 0.0625 0.154
12 16+850
13

RATA- RATA PEMAKAIAN PRIME COAT 1.037


- -

Diketahui : Diperiksa : Dibuat :


Direksi, Konsultan Pengawas Kontraktor Pelaksana,
KEMENTRIAN PEKERJAAN UMUM PT. GLOBAL PROFEX SYNERGI J.O PT. MAWAR ENAM SEMBILAN
DAN PERUMAHAN RAKYAT PT. SEECON'S

Tasman Muhammad Riski,ST Burhan,ST


Nip. 19690717 200701 1 004 (Material Teknisi) (Quality Kontrol)
PAKET : PRESERVASI JALAN RATE-RATE (BTS.KOLAKA TIMUR/KAB.KONAWE)-
BATAS KOTA UNAAHA
PEKERJAAN : LAPIS PEREKAT ASPAL CAIR ( EMULSI )
OUTPUT : REHABILITASI MINOR
TANGGAL UJI : 24 Oktober 2020

HASIL TES TAKARAN PEMAKAIAN PRIME COAT

Berat Kertas + Berat Berat Jenis Takaran


Titik Uji Berat Kertas Luas Kertas
No. Sample Sample Sample Pemakaian
(Sta.) (gr) (gr) (gr) (m2) (gr/cc) (Liter/m2)

1 2+500 L 57.8 6.0 51.8 0.0625 1.030 0.805


2 2+550 L 58.0 6.0 52.0 0.0625 0.808
3 2+600 L 57.5 6.0 51.5 0.0625 0.800
4 2+650 L 58.1 6.0 52.1 0.0625 0.809
5 2+700 L 57.6 6.0 51.6 0.0625 0.802
6 2+750 L 57.9 6.0 51.9 0.0625 0.806
7 2+790 L 58.4 6.0 52.4 0.0625 0.814

6 16+500 R 16.0 6.0 10.0 0.0625 0.155


7 16+550 R 15.8 6.0 9.8 0.0625 0.152
8 16+600 R 15.9 6.0 9.9 0.0625 0.154
9 16+650 R 16.4 6.0 10.4 0.0625 0.162
10 16+700 R 16.4 6.0 10.4 0.0625 0.162
11 16+750 R 15.9 6.0 9.9 0.0625 0.154
12 16+800 R 15.6 6.0 9.6 0.0625 0.149
13

- -
RATA- RATA PEMAKAIAN TACK COAT 0.806

: STA 2 + 450 s/d 2 + 791 (Kanan)


REKONSTRUKSI : STA 16 + 478 s/d 16 + 768 (Kanan)
: STA 16 + 678 s/d 16 + 804 (Kanan)

Diketahui : Diperiksa : Dibuat :


Direksi, Konsultan Pengawas Kontraktor Pelaksana,
KEMENTRIAN PEKERJAAN UMUM PT.SURYA PERKASA RAYA,JO. PT.SINAR LIMA PUTRA
DAN PERUMAHAN RAKYAT PT.ANUGERAH KRIDAPRADANA

Muh.Ishak Burhan,ST Silvester Yones Trianto


(Pengawas Laboratorium) (Material Teknisi) (Quality Kontrol)