The document contains a detailed estimate for renovation works broken down into 5 sections - mobilization and demobilization, ceiling works, drywall partitions, doors and windows, and repair of roofing. The total project cost is estimated at PHP 647,905.50 covering materials, labor, overhead costs and margin. The largest sub-sections are ceiling works at PHP 165,000 and drywall partitions at PHP 183,400.
The document contains a detailed estimate for renovation works broken down into 5 sections - mobilization and demobilization, ceiling works, drywall partitions, doors and windows, and repair of roofing. The total project cost is estimated at PHP 647,905.50 covering materials, labor, overhead costs and margin. The largest sub-sections are ceiling works at PHP 165,000 and drywall partitions at PHP 183,400.
The document contains a detailed estimate for renovation works broken down into 5 sections - mobilization and demobilization, ceiling works, drywall partitions, doors and windows, and repair of roofing. The total project cost is estimated at PHP 647,905.50 covering materials, labor, overhead costs and margin. The largest sub-sections are ceiling works at PHP 165,000 and drywall partitions at PHP 183,400.
DESCRIPTION QUANTITY UNIT COST TOTAL COST Demolition Works 1 lot 10,000.00 10,000.00 Mobilization & Demobilization 1 lot 5,000.00 5,000.00 15,000.00 II. Ceiling Works 238sq.m DESCRIPTION QUANTITY UNIT COST TOTAL COST Hardiflex 90 pcs 650.00 58,500.00 Metal furring 164 pcs 120.00 19,680.00 C-Channel 136 pcs 120.00 16,320.00 Wall Angle 50 pcs 85.00 4,250.00 W-Clip 1500 pcs 5.00 7,500.00 Blind Rivets 15 box 450.00 6,750.00 Drill bit 1/8 20 pcs 100.00 2,000.00 Ceiling Painting (Flat white finish) 1 lot 50,000.00 50,000.00 165,000.00 III. Drywall Partitions 286sq.m DESCRIPTION QUANTITY UNIT COST TOTAL COST Hardiflex 118 pcs 650.00 76,700.00 Metal Studs 145 pcs 140.00 20,300.00 Blind Rivets 22 box 450.00 9,900.00 Drill bit 1/8 35 pcs 100.00 3,500.00 Drywall partition (Flat white finish) 1 lot 73,000.00 73,000.00 183,400.00 IV.Door and windows DESCRIPTION QUANTITY UNIT COST TOTAL COST Door with jamb 6 pcs 8,500.00 51,000.00 Windows TBD 51,000.00 V. Repair of Roofing DESCRIPTION QUANTITY UNIT COST TOTAL COST Flashing 1 lot 12,000.00 12,000.00 Chb at the back 1 lot 5,000.00 5,000.00 Vulcaseal 4 lit 600.00 2,400.00 Tekscrew,sealant,etc 1 lot 2,500.00 2,500.00
21,900.00
Note: Nothing was done in D.A and Kit room.
Total Material Cost: 436,300.00
Labor Cost: 152,705.00 Direct Cost: 589,005.00 O.C.M: 58,900.50 GRAND TOTAL PHP: 647,905.50