Facilities Management
Quarter Briefing on Performance
(April 01 – June 30 2021)
S. N Sector/ Division/ Tasks done during the week
Department Under Corporate Building Administration Unit
1. Activities for the month of April 2021

Zagwe Building:

Gofa Sefer Building:

 Maintenance study is under progress.


 LED and energy saving lamps are fixed.
1. Facilities
 Purchase and refill fuels for Generators.
Management/
 New water pipeline installation work is under process.
Building
 Shatter replacement is requested and it is under process.
Maintenance &
Minor maintenance study work is under process.
Administration/Cor
porate Building
Admin.
Addis Ababa Branch Building

 Replaced the damaged wood door with aluminium


Water barrel is purchased for toilet rooms

Tewolde Building
 Payment for sticker work is done.
 Sticker works are done.
 Ac requested and study is under progress for appropriate installations.
Debrework Building
 Shatter maintenance and new work order is requested Medhin plc for the work.
 Telephone maintenance work is done.
 Sanitary maintenance work is done.

1
 Discussion was made with owner representative of the building on methodologies how to maintain the major
defects observed on the building and it is under study.
 Electrical contractor which is used for control of electrical power circuit is purchased and fixed.
 Shatter maintenance and replacement work is on progress.
 Telephone maintenance work is done.
 Sanitary maintenance work is done.

Arat Killo Branch


 Sanitary maintenance work is done.
 Maintenance study on the roof leakage is on progress
Silassie building.
 Sanitary maintenance work is done.
Amalga building

 Partition request is identified and proposal is forward for approval.

S. N Sector/ Division/ Tasks done during the week


Department Under Corporate Building Administration Unit
2. Activities for the month of May 2021

Zagwe Building:
 Minor maintenance study is under progress.
 Sanitary fixtures maintenance work is done.
 Maintenance on leakage parts around the corridor of the toilet room is done.
 Proforma for fan is evaluated and under purchase process.
 Cash lift maintenance is under negotiation for fixing the missed equipment.
 AC maintenance work is done.
1. Facilities
 CCTV camera service work is done.
Management/  Sticker works on 5th and 12th floors is done.
Building 1. Facilities
 Fuel refill for generator is done
Maintenance & Management/
Administration/Cor
porate Building
Admin.
Building
Maintenance &
Administration/Cor
Gofa Sefer Building:
2
 Proforma opening for minor maintenance study is sent for committee C for financial evaluation.
porate Building  Purchase and refill of fuels for Generators is done.
Admin.  New water pipeline installation and related works is done.
 40,000.00 litters water delivered due to water shortage
 LED and energy saving lamps are fixed.
Addis Ababa Branch Building

 Aluminium Shade proposal to protect the rain and surface drain is sent for workshop to fix as pe
design.
 Sanitary fixtures maintenance work is done
 Cleaning the storm water drainage line work is under progress.
 Replaced the damaged wooden door with aluminium.
 Water barrel is purchased for toilet rooms.

Tewolde Building
 Fixing ventilator work is under process
 Sticker works are done.

Debrework Building
 Door handling and key replacement and maintenance work is done.
 Maintenance work under defect parts of the building is under progress.
 Work shop requested to replace the broken glass of the curtain walls.
 Some fluorescent lamps and ballast are replaced on the damaged parts of the building.
 Purchase and refill of fuels for Generators is done.
 New Shatter work and maintenance is done.
 Fuel refill for generator is done
 Telephone maintenance work is done.
 Sanitary maintenance work is done.
 Electrical contacter which is used for control of electrical power circuit is purchased and fixed.

Arat Killo Branch


 Proforma opening for minor maintenance study is sent for committee C for financial evaluation.
 Sanitary maintenance is done.

Silassie building.
 Sanitary maintenance work is done.
Amalga building
 Sanitary sewer line and manholes are cleaned
 Water tanker maintenance work is done.

3
 Proposal for partition work is forward for approval.
 Roof maintenance work is done.
 Due to the structural warning signs teams are assigned for stone masonry retaining wall constru
side of the building and construction of pavement work around the store of the building.

S. N Sector/ Division/ Tasks done during the week


Department Under Corporate Building Administration Unit
3. Activities for the month of June 2021

Zagwe Building:
 Minor maintenance study is under progress.
 Sanitary fixtures maintenance work is done.
 Maintenance and parts replacement of meeting hall sound system.
 Preventive maintenance of elevators.
 Door key of elevators are replaced.
 One time maintenance of CCTV system is under progress.
1. Facilities
 Maintenance of the display monitors.
Management/  Terrace and roof maintenance works minor study.
Building  Replacement of flexible hose for water tanker.
Maintenance &  Partition work for media office.
Administration/Cor  Maintenance works for doors handles and key replacements.
porate Building
Admin.
Gofa Sefer Building:

 AC service is done.

4
 Minor maintenance work is award to the winner.
 Shatter work is done.
 Painting works for metal fences.
 Letter written for demolishing fence works for amendments of design.
 Telephone line installation works.

Addis Ababa Branch Building

 Sanitary fixtures maintenance work is done


 Cleaning the storm water drainage line work is under progress.

Tewolde Building
 Shatter works.
 Sticker works are done.

Debrework Building.
 Door handling and key replacement and maintenance work is done.
 Maintenance work under defect parts of the building is done.
 Fixing the broken glass of the curtain walls.
 Some fluorescent lamps and ballast are replaced on the damaged parts of the building.
 Purchase and refill of fuels for Generators is done.
 New Shatter work and maintenance is done.
 Fuel refill for generator is done.
 Telephone maintenance work is done.
 Sanitary maintenance work is done.

Arat Killo Branch


 Roof maintenance work is done.
 Sanitary maintenance is done.
 Maintenance works on the water pipe lines.
 Water tanker is arranged in its proper place.

Silassie building.
 Sanitary maintenance work is done.
 Maintenance works on the water pipe lines.

5
Amalga building
 Sanitary sewer line and manholes are cleaned
 Proposal for partition work is forward for approval.
 Minor maintenance work is under progress.
 Roof maintenance work is done.