Professional Documents
Culture Documents
Page 1 of 9
e. Mixed
2. Regular Design Services (SPP Doc 202)
a. Percent of PCC
(For Recommended Professional Fees (RPF) & Schedule of Fees per
building type, see Annex A)
b. Unit Cost Method based on PCC
c. PFPE
d. Lump Sum
e. Per Diem, Honorarium + Reimbursable Expenses
f. MDPE
g. Mixed
3. Specialized Architectural Services (SPP Doc 203)
a. Percent of PCC (Cost of Work)
(For RPFs & Schedule of Fees per Service, see Annex B)
b. Unit Cost Method based on PCC (Cost of Work)
c. MDPE
d. PFPE
e. Lump Sum
f. Retainer
g. Per Diem, Honorarium
h. Mixed
4. Full-Time Supervision (SPP Doc 204-A)
a. Percent of PCC – RPF = 1% to 1.5% of PCC
b. MDPE
c. PFPE
d. Lump Sum
e. Per Diem, Honorarium
5. Construction Management (SPP Doc 204-B)
a. Percent of PCC – RPF = 1.5% to 3% of the PCC
b. MDPE
c. PFPE
d. Lump Sum
e. Per Diem, Honorarium
f. Mixed
6. Post-Construction Services (SPP Doc 205)
a. Value- Based Pricing or Percentage of Gross Rentals, Maintenance
Fees, & Security Fees – RPF = 4% to 6% of Gross Rentals (Incentive-
Based)
b. Monthly Salary
c. MDPE
d. Retainer + Reimbursable Expenses
e. PFPE + Reimbursable Expenses
7. Comprehensive Architectural Services (SPP Doc 206)
a. Percent of PCC – RPF = 2% to 5% of PCC
b. MDPE
c. PFPE
d. Lump Sum
8. Design-Build Services (SPP Doc 207) – Design-Build Services by
Administration / Design-Build Services on a Guaranteed Maximum Cost
Page 2 of 9
a. Percent of PCC – RPF = 7% of PCC (Design-Build Services by
Administration)
b. MDPE
c. PFPE
d. Lump Sum
e. Per Diem, Honorarium + Reimbursable Expenses
f. Mixed
g. Built into the Guaranteed Maximum Cost (Design-Build Services on a
Guaranteed Maximum Cost) – RPF = 10% of PCC
9. Architectural Design Competition (SPP Doc 208)
a. Salary for the Secretariat
b. Office Overhead Costs
c. Honorarium for the Professional Advisor
d. Honorarium for the Technical Advisor
e. Honorarium for the Jurors
f. Prizes and/or Honoraria for the Winners and/or Participants (See SPP
Doc 208)
10. Professional Architectural Consulting Services (SSP Doc 209)
a. Per Diem or Hourly Basis
b. Retainer
c. Salary Cost x Multiplier + Reimbursable Expenses
d. Lump Sum
e. Percent of PCC (Cost of Work)
Page 3 of 9
6. AMENDMENTS – The UAP-IAPOA shall continuously enhance the contents
of this document to be responsive to new challenges and requirements of
professional practice. Any amendment to this document shall prepared by a
Special Committee on the Standards of Professional Practice of the IAPOA.
The amendments shall then be submitted to the UAP National Board for
approval.
7. EFFECTIVITY – This document shall be effective after approval of the UAP
National Board of Directors and upon recommendation of the PRC and
PRBoA for implementation as part of the PRBoA-issued Resolution on the
Standards of Professional Practice (SPP) Documents. This happened on
October 15, 2014.
Page 4 of 9
ANNEX A
REGULAR DESIGN SERVICES
Recommended Professional Fees & Schedule of Fees
Page 5 of 9
TABLE A.4. RPF for Group II (DAEDS).
Project Construction Cost (PCC) in
Recommended Professional Fee
PHP
50M and less 6%
50M – 100M 3M + 5% of excess of 50M
100M – 200M 5.5M + 4% of excess of 100M
200M – 500M 9.5M + 3% of excess of 200M
500M – 1B 18.5M + 2% of excess of 500M
Over 1B 28.5M + 1% of excess of 1B
Page 6 of 9
TABLE A.8. RPF for Group IV.
Service Recommended Professional Fee
DAEDS 10% of PCC
DADS 6% of PCC
Page 7 of 9
Cumulative
Work Phase Payment Due
Amount
Upon signing of the Service 5% of PF 5%1
Agreement
Upon completion of the + 15% of PF 20%2
Schematic Design Phase
Upon completion of the Design + 20% of PF 40%2
Development Phase
Upon completion of the + 50% of PF 90%2
Contract Document Phase
Bidding or Negotiation Phase (Adjust fee to be equal to 90%, 90%3
as per winning bid)
Upon Completion of Work + 10% of PF 100%4
(5% for civil liability, 5% for
Periodic Construction
Supervision)
1. Based on original SPPCC as stipulated in the Service Agreement.
2. Based on latest SPPCC submitted at that particular stage.
3. Based on winning bid.
4. Based on FPPCC.
- END OF ANNEX A –
Page 8 of 9
ANNEX B
SPECIALIZED ARCHITECTURAL SERVICES
Recommended Professional Fees & Schedule of Fees
TABLE B.1. RPF for Architectural Interiors (AI), Acoustic Design, Lighting Layout &
Design, and Site Development Planning (SDP).
RPF 10% - 15% of Cost of Work
TABLE B.2. Schedule of Payments for Architectural Interiors (AI), Acoustic Design,
Lighting Layout & Design, and Site Development Planning (SDP).
Phase of Works Payment Due
Upon Submission of Preliminary Design 30% of RPF
Upon Submission of Final Design 50% of RPF
Upon Completion of the Project 50% of RPF
Note: Obviously, this tally does not total to 100%. This will most likely be edited in future iterations of this document.
- END OF ANNEX B -