Date: 02/10/02 4/28/03 Client: Burlington Re EXPRO - Production Wireline

Well No: S/L 16529 #1 Eng. Ferrell


Field: Caillou Island Prep. By: Brent Croc
PN:
Program: Pull @ Surface
At Depth At Surface
Note: Make entries in YELLOW boxes only Max Jar @ Depth = 5995 9990
Line Size: .3125" WS 9990 BS 16650 Max Straight Pull @ Depth = 9325 13320
lbs 5/16" 1/4" Wire Size (Weight)
Weight calculations: 7/32" Comparison
Line area = .077" Line area = .049"
380 Line area = .038"
.250" line - SW x .10% x 1.50 3/16"
85.3 x .10 = 8.53 Total = 93.83
360 93.83 x 1.50 = 140.75 lbs (Min. Tool weight required) Line area = .027"

340 To calculate approx. Stem weights: Swab Cable and Wire Weight - W x D
Size Weight
Balance Point or STEM WEIGHT REQUIRED (lbs) or SWR - to overcome pressure/friction Add Approx. 60%

.312" = 232 lbs per (1000')


D x 8 = lbs per ft
2
320 .250" = 148 lbs per (1000')
3
.219" = 107 lbs per (1000')
.187" = 81 lbs per (1000')
300 .125" = 42 lbs per (1000')
.108" = 33 lbs per (1000')
Enter Stem OD Std. Stem Req. (Ft) LINE SIZE .092" = 23 lbs per (1000')
280 1.875 SIZE .3125" .250" .219" .187" .125" .108"
To find balance point:
STD. PPF = 9.375 1.875 5 3 2 1.7 0.8 0.6
STEM OD

P x A = BP
260 1.00" 2.667 1.25" 1.25" 13.582 10.533 7.4838 2.8411 SITP x Line area = Balance point or
where Pressure line intersects line size
1.25" 4.167 1.500" 1.500" 9.4325 7.315 5.1975 1.9731
obtain balance point from weight scale on
240 1.500" 6.000 0.08 1.75" 1.75" 6.9297 5.3741 3.8184 1.4496 left
1.75" 8.167 0.049 1.875" 1.875" 6.0336 4.6791 3.3246 1.2621
220 1.875" 9.380 0.038 2.125 2.125 4.6994 3.6444 2.5895 0.983

2.125" 12.043 0.027 Enter-SITP 350 TOOL LENGTH REQ. (Feet)


200 2.500" 16.667 ### MASP
Tungsten 13.594 ### Enter Enter
180 Max Log dpth. Depth 13500 Ft. TSW 250 .125"
Line in hole Lgth 0 Ft. TWIH 250
160 Enter Line area = .0123"
Working line Line Weight 232 Lbs (1000')

140 Enter 3132 Lbs


Line in hole Line Weight 0 Lbs (1000') Enter
.108"
120 0 Lbs Ang. 0.2
Line weight Hole Angle Line area = .0092"
100
3382 .092"
80 ( Staight hole)P/U Wt. @ Top of fish
.250" Balance Point Line area = .0066"
60 3632 363 5995
(Straight hole) P/U Wt. @ Depth Est. Drag (Lbs) @ Angle Max Pull @ depth
40
Line 0.313 0.250" 0.219 .187" .125" .108"
20 Balance Point(lbs) 26.95 17.15 13.3 9.45 4.305 3.22
Tool weight req'd (lbs) 44.47 28.3 21.95 15.59 7.103 5.313

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Max SITP = 350

MASP PSI x 1000


SURFACE PRESSURE
GREASE HEAD STUFFING BOX

3” LUB 3” LUB X/OVER 5” LUB 5” RISER 5” RISER X 11” OTIS

5” FOX P/TEE TEST STUMP 5” X 3’ PUP 5” X 2’ PUP

5” X 5’ P/TEE
5” X10’ P/TEE

11” OTIS X/OVER


WORKOVER VALVE 5” DUAL BOP 5” SINGLE HYD BOP 5” SINGLE BOP
5” RISER X 11” OTIS

5” X 2’ PUP

IS X/OVER
5” SINGLE BOP
RIG FLOOR

SKID DECK
1/4 BOP

Pump in sub 29/16'' 10m x 1502 Weco


Parker Rig 11 Floor

40 ft. Spool Riser 29/16'' 10m

3/16 BOP Flanged 2 9/16'' 10m

7/32 BOP Flanged 2 9/19'' 10m


2 1/2”
Expro Americas Wireline Fishing Bottom Hole Assembly
Drawing Tool Description Tool O/D Length Connection

5/16" Ropesocket 1.875" 10" 1 7/8" QLS with 1 3/4" FN

Swivel 1.875 12" 1 7/8" QLS with 1 3/4" FN

Petroline Accelerators 1.875" 60" Normal 1 7/8" QLS with 1 3/4" FN


84" Extended

Petroline Stem 1.875" 36" 1 7/8" QLS with 1 3/4" FN

Petroline Spring Jars 1.875" 54" Closed 1 7/8" QLS with 1 3/4" FN
67" Open

Petroline Tube Jars 1.875" 36" Closed 1 7/8" QLS with 1 3/4" FN
56" Open

Petroline DU Pulling Tool 2.160" 24" 1 7/8" QLS with 1 3/4" FN

Total Length of B.H.A. :- 24' B.H.A Prepared by


Please note that all O/D's and I/D's are approximate, and are given as a guideline only Brent J. Crochet, Sr.