Professional Documents
Culture Documents
340 To calculate approx. Stem weights: Swab Cable and Wire Weight - W x D
Size Weight
Balance Point or STEM WEIGHT REQUIRED (lbs) or SWR - to overcome pressure/friction Add Approx. 60%
P x A = BP
260 1.00" 2.667 1.25" 1.25" 13.582 10.533 7.4838 2.8411 SITP x Line area = Balance point or
where Pressure line intersects line size
1.25" 4.167 1.500" 1.500" 9.4325 7.315 5.1975 1.9731
obtain balance point from weight scale on
240 1.500" 6.000 0.08 1.75" 1.75" 6.9297 5.3741 3.8184 1.4496 left
1.75" 8.167 0.049 1.875" 1.875" 6.0336 4.6791 3.3246 1.2621
220 1.875" 9.380 0.038 2.125 2.125 4.6994 3.6444 2.5895 0.983
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Max SITP = 350
5” X 5’ P/TEE
5” X10’ P/TEE
5” X 2’ PUP
IS X/OVER
5” SINGLE BOP
RIG FLOOR
SKID DECK
1/4 BOP
Petroline Spring Jars 1.875" 54" Closed 1 7/8" QLS with 1 3/4" FN
67" Open
Petroline Tube Jars 1.875" 36" Closed 1 7/8" QLS with 1 3/4" FN
56" Open