GDI PREVENTIVE MAINTENANCE INSTRUCTION Date: 15/04/10 Rev: 0

Maximo Ref. MPM-GDI-73 SFI Code NA


Equip.
Rig Lighting
Description
Manufacturer Various Equip. Location Rig

Model Various

MAINTENANCE SPECIFICATIONS

Frequency Monthly Estimated Duration 2 Hours

Criticality 3 Area Authority Chief Electrician

Class Structure NA Failure Code NA

Craft Chief Electrician No. of Craft 1

SAFETY NOTES

• Complete required Permit-To-Work (PTW).


• Lockout / Tag-out Permit required.
• Review / Complete Job-Safety-Analysis (JSA).
• Inform Area authority if work is carried out on critical equipment for ongoing
operation.
• Do not wear jewellery when working around rotating machinery.
• Wear all proper safety equipment.

JOB PLAN INSTRUCTION

1. Check all light fittings for cleanliness and damage.


2. Ensure all lights have a safety sling attached to a secure point.
3. Check all light fittings for water ingress and ensure all seals are in good condition.
Ensure all light fittings are securely attached and all mounting bolts and brackets are corrosion
4.
free.
Check all cable entries to lights, plugs and sockets and ensure they are securely fixed and
5.
prevent water ingress.
6. Ensure all lighting switches are operational and securely mounted. If applicable.
7. Check all light fittings, sockets and plugs for Ex integrity. Ensure it has not been compromised.
8. Ensure all the cabling in the mast is correctly clipped and all sockets are securely mounted.
9. Check all cable routes and ensure the cables are securely “clipped” to cable tray.
10. Check all cables for damage.
Check all lighting circuit breakers and ensure they are correctly rated for the lighting circuit they
11.
supply.