Question #1 Explain the are the main procedure preparing, monitoring, and evaluating scheduling
before starting, during construction and after construction respectively.
ANSWER: Construction Progress Monitoring is an inspection that ensures that proposed construction
is consistent with the funds that are being requested from the contractor. Construction Progress
.Monitoring also verifies that work completed is consistent with plans and specifications
ANSWER: Project Plans which optimise expenditure of time, recognise cost implications and reflect
the contractual obligations for the design, procurement, construction and commissioning of plant
.facilities
Early indication of deviations from the approved project programme so that action can be taken to
.minimise their effect
Question #3-1 a. Using the Critical Path Method for designed (CPM) OF Scheduling, Determine: a1.
Early Start (E.S.) and Early Finish (E.F. a2. Late Start (L.S.) AND Late Finish (L.F.) a3. Total project
time. b. The critical path of the project (CP)
Question # 3-2 a. Draw the design schedule using the bar-chart schedule for all activities using
blue color. b. Draw on the bar-chart schedule the actual activities using red for behind schedule
and green for finishing before schedule
Question #3-3 Prepare time analysis table from the bar- chart graphs using design and actual