__1. Submitted within 15 days from receipt of NTP; used as C. CLAIMS FOR EXTRA COST
basis for request of payment.
D. ADJUSTMENT OF CONTRACT
A. SCHEDULE OF CONSTRUCTION WORK IN CRITICAL
__6. By estimate in lump sum; by unit prices not exceeding
PATHMETHOD
25% of original work contract; by actual
B. SCHEDULE FOR SUBMISSION OF DETAIL AND
direct cost + 15% profit, overhead and tax.
SHOPDRAWINGS
A. APPROVAL WITHHELD
C. BREAKDOWN OF WORK & CORRESPONDING VALUE
B. VALUE OF EXTRA WORK
D. BILL OF MATERIALS
C. CLAIMS FOR EXTRA COST
__2. Or other form acceptable to the Architect; Architect can
order Contractor to take steps to ensure completion within D. ADJUSTMENT OF CONTRACT
the timeframe.
__7. Caused by instructions from Architect or Owner; delays in
A. SCHEDULE OF CONSTRUCTION WORK IN CRITICAL owner-supplied materials.
PATHMETHOD
A. APPROVAL WITHHELD
B. SCHEDULE FOR SUBMISSION OF DETAIL AND
SHOPDRAWINGS B. VALUE OF EXTRA WORK
__3. Prepared jointly by the Architect and Contractor. __8. Period for which claim for adjustment has to be asserted.
B. 30 DAYS B. 5 DAYS
C. 10 DAYS C. 7 DAYS
__15. Contract Termination by Owner, upon certification of __20. Disputes – Architect to render __ days after otherwise
the Architect and for the following reasons. Which is arbitration.
CORRECT?
A. 5 DAYS
A. CONTRACTOR IS BANKRUPT, INSOLVENT.
B. 30 DAYS
B. VIOLATIONS TO THE CONTRACT
C. 7 DAYS
C. FAILURE TO PROVIDE QUALIFIED SUPERINTENDENT,
D. 15 DAYS
WORKMEND. ALL OF THE ABOVE
__21. Contractor to submit upon completion of work orpart.
E. NONE OF THE ABOVE FAILURE TO PAY PROMPTLY SUBCON,
MATERIAL A. PROGRESS BILLING
SUPPLIERS B. BILL OF QUANTITIES
C. FINAL CERTIFICATION
D. TRIAL USAGE
__22. Not Architect’s acceptance. __28. Owner may sell after __ days of notice.
__23. 98% completion. Architect to inspect and issue __. __29. Acceptance and Final Payment, which is FALSE?
B. 10 DAYS A. 5 DAYS
C. 7 DAYS B. 7 DAYS
D. 15 DAYS C. 10 DAYS
D. 15 DAYS
__34. Before written notice, contractor’s insurance policy will __40. Suspension of construction exceeds 6 months, the fee
not be cancelled. for the remaining works shall be doubled.
D. 15 DAYS D. 90 DAYS
__35. From payment of required fees, issuance of Building __41. Excavation shall not be left open without work being
Permit. done.
D. 15 DAYS D. 90 DAYS
B. 10 DAYS B. 1 MONTH
C. 30 DAYS C. 3 MONTHS
D. 15 DAYS D. 6 MONTHS
__37. Suspension of work through no act of contractor and __43. Building permit validity if there was no construction.
employees or order of court.
A. 6 MONTHS
A. 60 DAYS
B. 1 MONTH
B. 10 DAYS
C. 3 MONTHS
C. 30 DAYS
D. 12 MONTHS
D. 90 DAYS
__44. From date of bidding, contractor to seek architect’s
__38. From receipt of advice of the non-issuance, clarification.
A. 10 DAYS C. 5 DAYS
B. 15 DAYS D. 7 DAYS
D. 90 DAYS
__46. After 65% completion of work, the contractor should __51. Architecture Law of 1950. June 17, 1950.
present?
A. RA 9266
A. GUARANTEE BOND
B. RA 1581
B. REQUEST FOR PAYMENT
C. RA 545
C. CERTIFICATE OF COMPLETION
D. RA 8981
D. CERTIFICATE OF NON-FINANCIAL OBLIGATION
__52. An Act Providing for a More Responsive and
__47. Owner fails to implement the plan, architect has Comprehensive Regulation for the Registration,
completed the Detail Design & Contract Document Phase,
Licensing and Practice of Architecture, Repealing for the
Architect is entitled to __ % of the Architect’s Fee.
Purpose Republic Act No. 545, as Amended,
A. 50
Otherwise Known as “An Act to Regulate the Practice of
B. 100 Architecture in the Philippines,” and for Other purposes.
C. 90 A. RA 9266
D. 20 B. RA 1581
B. BP 220 A. RA 9286
C. EO 90 B. RA 6234
D. EO 538 C. RA 1378
A. PD 1586 A. PD 772
B. RA 3931 B. PD 49
C. RA 9003 C. RA 9003
D. PD 1067 D. RA 8293
__79. Ecological Waste Management Program Law. __85. Intellectual Property Code of the Philippines. June22,
1997 / January 1, 1998.
January 26, 2001.
A. RA 3019
A. PD 1586
B. PD 49
B. RA 3931
C. RA 9003
C. RA 9003
D. RA 8293
D. PD 1152
__86. Decree on Intellectual Property. November 14,
__80. National Water and Air Pollution Control
1972.
Commission. June 18, 1964.
A. RA 3019
A. PD 1586
B. PD 49
B. RA 3931
C. RA 9003
C. RA 9003
D. RA 8293
D. PD 1152
__87. Anti-Graft and Corrupt Practices Act. 1961.
__81. Establishing Environmental Impact Statement System.
1978. A. RA 3019
A. PD 1586 B. RA6713
B. PD 984 C. RA 9003
C. RA 9003 D. RA 8293
D. RA 8293
__90. Code of Ethical Conduct of a Public Official and __96. Transportation?
Employees. 1972.
A. DIVISION 26
A. EO 525
B. DIVISION 34
B. RA 8439
C. DIVISION 45
C. RA 6713
D. DIVISION 31
D. RA 8293
__97. Fire Suppression?
__91. Master Format was released in 1975 and only had16
A. DIVISION 26
Divisions until the new 50 Division Master Formatas released
in late? B. DIVISION 20
A. 2004 C. DIVISION 22
B. 2005 D. DIVISION 21
C. 2003 __98. Concrete?
D. 2006 A. DIVISION 03
__92. Wood, plastics and composites? B. DIVISION 06
A. DIVISION 03 C. DIVISION 08
B. DIVISION 06 D. DIVISION 14
C. DIVISION 20 __99. Equipment?
D. DIVISION 11 A. DIVISION 05
__93. Electronic Safety and Security? B. DIVISION 06
A. DIVISION 26 C. DIVISION 12
B. DIVISION 34 D. DIVISION 11
C. DIVISION 45 __100. Process Interconnection?
D. DIVISION 28 A. DIVISION 41
__94. Finishes? B. DIVISION 46
A. DIVISION 02 C. DIVISION 45
B. DIVISION 07 D. DIVISION 40
C. DIVISION 09
D. DIVISION 13
A. DIVISION 40
B. DIVISION 41
C. DIVISION 46
D. DIVISION 48