PROFESSIONAL PRACTICE

Part 4: UAP DOC. 301 & LAWS AFFECTING PRACTICE

OF ARCHITECTURE & more

__1. Submitted within 15 days from receipt of NTP; used as C. CLAIMS FOR EXTRA COST
basis for request of payment.
D. ADJUSTMENT OF CONTRACT
A. SCHEDULE OF CONSTRUCTION WORK IN CRITICAL
__6. By estimate in lump sum; by unit prices not exceeding
PATHMETHOD
25% of original work contract; by actual
B. SCHEDULE FOR SUBMISSION OF DETAIL AND
direct cost + 15% profit, overhead and tax.
SHOPDRAWINGS
A. APPROVAL WITHHELD
C. BREAKDOWN OF WORK & CORRESPONDING VALUE
B. VALUE OF EXTRA WORK
D. BILL OF MATERIALS
C. CLAIMS FOR EXTRA COST
__2. Or other form acceptable to the Architect; Architect can
order Contractor to take steps to ensure completion within D. ADJUSTMENT OF CONTRACT
the timeframe.
__7. Caused by instructions from Architect or Owner; delays in
A. SCHEDULE OF CONSTRUCTION WORK IN CRITICAL owner-supplied materials.
PATHMETHOD
A. APPROVAL WITHHELD
B. SCHEDULE FOR SUBMISSION OF DETAIL AND
SHOPDRAWINGS B. VALUE OF EXTRA WORK

C. BREAKDOWN OF WORK & CORRESPONDING VALUE C. CLAIMS FOR EXTRA COST

D. BILL OF MATERIALS D. ADJUSTMENT OF CONTRACT

__3. Prepared jointly by the Architect and Contractor. __8. Period for which claim for adjustment has to be asserted.

A. SCHEDULE OF CONSTRUCTION WORK IN CRITICAL A. 15 DAYS


PATHMETHOD
B. 10 DAYS
B. SCHEDULE FOR SUBMISSION OF DETAIL AND
C. ONE WEEK
SHOPDRAWINGS
D. 7 DAYS
C. BREAKDOWN OF WORK & CORRESPONDING VALUE
__9. Claims for Extra Cost by Sub-Con.
D. BILL OF MATERIALS
A. 15 DAYS
__4. If defective work not remedied; no payments to subcon,
doubt as to completing further the work; damage to another B. 10 DAYS
contractor.
C. ONE WEEK
A. APPROVAL WITHHELD
D. 7 DAYS
B. VALUE OF EXTRA WORK
__10. Contract Termination by Contractor, within __ days
C. CLAIMS FOR EXTRA COST written notice to Owner and Architect.

D. ADJUSTMENT OF CONTRACT A. 15 DAYS

__5. In cost and time; consent of sureties and additional B. 10 DAYS

performance bond. C. ONE WEEK

A. APPROVAL WITHHELD D. 7 DAYS

B. VALUE OF EXTRA WORK


__11. Contract Termination by Contractor, suspension of work __16. Owner’s right to proceed work after take over from
for __ days through no fault of the Contractor. Contractor – Architect to ascertain value of work completed
by the Contractor.
A. 15 DAYS
A. TRUE
B. 30 DAYS
B. FALSE
C. 10 DAYS
C. MAY BE
D. 90 DAYS
D. 50-50
__12. Contract Termination by Contractor, Architect’s failure
to act on Request for Payment within? __17. Beginning, suspending or resuming work – written
notice to Architect.
A. 15 DAYS
A. 5 DAYS
B. 30 DAYS
B. 30 DAYS
C. 10 DAYS
C. 10 DAYS
D. 90 DAYS
D. 15 DAYS
__13. Contract Termination by Contractor, Owner’s failure to
act on Request for Payment within? __18. Request for Owner’s furnished materials, how many
days before needed?
A. 5 DAYS
A. 5 DAYS
B. 30 DAYS
B. 10 DAYS
C. 10 DAYS
C. 7 DAYS
D. 15 DAYS
D. 15 DAYS
__14. Contract Termination by Contractor, Owner’s failure pay
any sum __ days after award by Arbitration. __19. Request for drawings must be within?

A. 5 DAYS A. ONE WEEK

B. 30 DAYS B. 5 DAYS

C. 10 DAYS C. 7 DAYS

D. 15 DAYS D. TWO WEEKS

__15. Contract Termination by Owner, upon certification of __20. Disputes – Architect to render __ days after otherwise
the Architect and for the following reasons. Which is arbitration.
CORRECT?
A. 5 DAYS
A. CONTRACTOR IS BANKRUPT, INSOLVENT.
B. 30 DAYS
B. VIOLATIONS TO THE CONTRACT
C. 7 DAYS
C. FAILURE TO PROVIDE QUALIFIED SUPERINTENDENT,
D. 15 DAYS
WORKMEND. ALL OF THE ABOVE
__21. Contractor to submit upon completion of work orpart.
E. NONE OF THE ABOVE FAILURE TO PAY PROMPTLY SUBCON,
MATERIAL A. PROGRESS BILLING
SUPPLIERS B. BILL OF QUANTITIES

C. FINAL CERTIFICATION

D. TRIAL USAGE
__22. Not Architect’s acceptance. __28. Owner may sell after __ days of notice.

A. PROGRESS BILLING A. 15 DAYS

B. BILL OF QUANTITIES B. 30 DAYS

C. FINAL CERTIFICATION C. 7 DAYS

D. TRIAL USAGE D. 10 DAYS

__23. 98% completion. Architect to inspect and issue __. __29. Acceptance and Final Payment, which is FALSE?

A. WORK RECTIFICATION A. ARCHITECT TO CERTIFY COMPLETION

B. CERTIFICATE OF COMPLETION OF WORK B. CONTRACTOR TO SUBMIT SWORN STATEMENT THATALL


TAXES PAID, MATERIALS AND LABOR PAID
C. FINAL CERTIFICATION
C. ALL OF THE ABOVE
D. REQUEST FOR PAYMENT
D. NONE OF THE ABOVE
__24. Condition for completion and acceptance.
__30. Release of Retention ___ after final payment.
A. WORK RECTIFICATION
A. 120 DAYS
B. MAKING GOOD OF KNOWN DEFECTS
B. TWO WEEKS
C. REMOVAL OF TEMPORARY STRUCTURES
C. 3 MONTHS
D. REQUEST FOR PAYMENT
D. 15 DAYS
__25. Condition for Work Rectification. Period of making good
known defects or faults, not more than? __31. Correction after final payment within __ from date of
acceptance of work.
A. 60 DAYS
A. 120 DAYS
B. 60 WORKING DAYS
B. ONE YEAR
C. 60 BANKING DAYS
C. 90 DAYS
D. 60 CALENDAR DAYS
D. TWO YEARS
__26. Making good of known defects or faults, which of the
following is true? __32. Repairs and corrective work within __ of written notice
of Owner.
A. AT ARCHITECT’S EXPENSE
A. 120 DAYS
B. FAULT BY OTHERS TO BE DETERMINED BY THEARCHITECT
B. 7 DAYS
C. CONTRACTOR TO PAY WITHIN 10 DAYS
C. 15 DAYS
D. OWNER MAY DO SO WITHIN 10 DAYS NOTICE
D. 5 DAYS
__27. Materials left at site, Contractor to pay within __days
from removal of Owner. __33. From date of referral, C/M Fire Marshall shall

A. 5 DAYS submit recommendations to the BO.

B. 10 DAYS A. 5 DAYS

C. 7 DAYS B. 7 DAYS

D. 15 DAYS C. 10 DAYS

D. 15 DAYS
__34. Before written notice, contractor’s insurance policy will __40. Suspension of construction exceeds 6 months, the fee
not be cancelled. for the remaining works shall be doubled.

A. 5 DAYS A. 365 DAYS

B. 7 DAYS B. 180 DAYS

C. 10 DAYS C. 120 DAYS

D. 15 DAYS D. 90 DAYS

__35. From payment of required fees, issuance of Building __41. Excavation shall not be left open without work being
Permit. done.

A. 5 DAYS A. 365 DAYS

B. 7 DAYS B. 180 DAYS

C. 10 DAYS C. 120 DAYS

D. 15 DAYS D. 90 DAYS

__36. Certificate of occupancy. __42. Contractor’s guarantee bond effectivity.

A. 5 DAYS A. ONE YEAR

B. 10 DAYS B. 1 MONTH

C. 30 DAYS C. 3 MONTHS

D. 15 DAYS D. 6 MONTHS

__37. Suspension of work through no act of contractor and __43. Building permit validity if there was no construction.
employees or order of court.
A. 6 MONTHS
A. 60 DAYS
B. 1 MONTH
B. 10 DAYS
C. 3 MONTHS
C. 30 DAYS
D. 12 MONTHS
D. 90 DAYS
__44. From date of bidding, contractor to seek architect’s
__38. From receipt of advice of the non-issuance, clarification.

suspension or revocation of permits, file an appeal A. 10 DAYS

to the Secretary. B. 15 DAYS

A. 10 DAYS C. 5 DAYS

B. 15 DAYS D. 7 DAYS

C. 5 DAYS __45. After written notice, contractor agrees to make repairs


to correct defective work.
D. 7 DAYS
A. 10 DAYS
__39. Building permit validity.
B. 15 DAYS
A. 60 DAYS
C. 5 DAYS
B. 10 DAYS
D. 7 DAYS
C. 120 DAYS

D. 90 DAYS
__46. After 65% completion of work, the contractor should __51. Architecture Law of 1950. June 17, 1950.
present?
A. RA 9266
A. GUARANTEE BOND
B. RA 1581
B. REQUEST FOR PAYMENT
C. RA 545
C. CERTIFICATE OF COMPLETION
D. RA 8981
D. CERTIFICATE OF NON-FINANCIAL OBLIGATION
__52. An Act Providing for a More Responsive and
__47. Owner fails to implement the plan, architect has Comprehensive Regulation for the Registration,
completed the Detail Design & Contract Document Phase,
Licensing and Practice of Architecture, Repealing for the
Architect is entitled to __ % of the Architect’s Fee.
Purpose Republic Act No. 545, as Amended,
A. 50
Otherwise Known as “An Act to Regulate the Practice of
B. 100 Architecture in the Philippines,” and for Other purposes.

C. 90 A. RA 9266

D. 20 B. RA 1581

__48. 30% of contract amount valid up to 1-year from date of C. PD 223


acceptance.
D. RA 8981
A. PERFORMANCE BOND
__53. Architecture Law of 1956 ( 34 – Corporate Practice).
B. GUARANTEE BOND June 16, 1956.

C. PAYMENT BOND A. LOI 1000

D. PROPOSAL BOND B. RA 1581

__49. When 50% of the contract has been accomplished, C. PD 223

NO ____ shall be made. D. RA 8981

A. FINAL CERTIFICATE __54. Professional Regulation Commission Modernization Act.


December 5, 2000.
B. GUARANTEE BOND
A. LOI 1000
C. PAYMENT
B. RA 386
D. RETENTION
C. EO 546
__50. Damage from fire or earthquake, typhoons or any
fortuitous event may be repaired, using the same kind of D. RA 8981
materials of which the building or structure was originally
__55. Creating the Professional Regulation Commission.
constructed, Provided that, the cost of such repair shall not
exceed __% of the replacement cost of the building or June 22, 1973.
structure.
A. LOI 1000
A. 20%
B. RA 386
B. 65%
C. PD 223
C. 50 %
D. EO 546
D. 15%
__56. “...only PRC accredited bona fide professional __61. Adopting A National Building Code Of The Philippines
organizations, and their members to organize host, sponsor or (NBCP) Thereby Revising R.A. No. 6541.
represent the Filipino professionals in national, regional and
Feb 19, 1977 IRR latest revision. April 30, 2005.
international forums, conferences,
A. RA 9514
conventions where the concerned professions are involved,
AND ...all B. PD 1096
government agencies and any of its instrumentalities shall give C. RA 9263
priority to members of the accredited professional
organizations in the hiring of its employees and in the D. RA 6541
engagement of professional services.”
__62. An Act Establishing A Comprehensive Fire Code of The
A. LOI 1000 Philippines, Repealing Presidential Decree No. 1185 And For
Other Purposes “Revised Fire Code of the Philippines of 2008”.
B. RA 386 December 19, 2008.
C. PD 223 A. RA 9514
D. EO 546 B. BP 344
__57. Civil Code of the Philippines. June 18, 1949. C. RA 9263
A. RA 7160 D. RA 6541
B. RA 386 __63. Bureau of Fire Protection and Bureau of Jail
C. RA 876 Management and Penology Professionalization Act.
D. EO 546 March 10, 2004.
__58. Creating a Ministry of Public Works and a Ministry of A. PD 957
Transportation and Communications. July 23, 1979.
B. BP 344
A. RA 7160
C. RA 9263
B. PD 1096
D. RA 6541
C. RA 876
__64. Enhancing the Mobility of Disabled Persons. Feb25,
D. EO 546 1983. IRR latest revision April 30, 2005.
__59. Local Government Code of the Philippines. October10, A. PD 957
1991.
B. BP 344
A. RA 7160
C. RA 4726
B. PD 1096
D. RA 6552
C. RA 876
__65. Condominium and Subdivision Buyers’ Protective
D. RA 6541 Decree. July 12, 1976.
__60. The Philippine Arbitration Law. June 19, 1953. A. PD 957
A. RA 9514 B. BP 220
B. PD 1096 C. RA 4726
C. RA 876 D. RA 6552
D. RA 6541
__66. Real Estate Buyers’ Protective Act. August 26, __72. Allowing the Construction of Multi-Storey Tenement
Housing Projects for the Poor and Homeless. June 16,
1972.
1962.
A. RA 8763
A. RA 7279
B. BP 220
B. RA 3469
C. RA 4726
C. RA 1378
D. RA 6552
D. RA 7835
__67. The Condominium Act. June 18, 1966.
__73. Urban Development and Housing Act. 29 March,
A. RA 8763
1992.
B. BP 220
A. RA 7279
C. RA 4726
B. RA 6234
D. EO 538
C. RA 1378
__68. Standards for Economic and Socialized Housing projects.
March 25, 1982. D. RA 7835

A. RA 8763 __74. Comprehensive and Integrated Shelter Finance Act.

B. BP 220 A. RA 9286

C. EO 90 B. RA 6234

D. EO 538 C. RA 1378

__69. Home Guarantee Corporation Act. March 7, 2000. D. RA 7835

A. RA 8763 __75. National Plumbing Code of the Philippines. January28,


1959. Latest revision December 21, 1999.
B. RA 3469
A. RA 9286
C. EO 90
B. RA 6234
D. EO 538
C. RA 1378
__70. Prescribing the Administration of the Home
Development Mutual Funds. June 4, 1979. D. PD 1067

A. RA 7279 __76. Creating the Metropolitan Waterworks and Sewerage


System. June 19, 1971.
B. RA 3469
A. RA 9286
C. EO 90
B. RA 6234
D. EO 538
C. RA 9003
__71. Creating the Housing and Urban Development
Coordinating Council. December 17, 1986. D. PD 1067

A. RA 7279 __77. Latest Amendment to PD198 or Provincial Water


Utilities Act of 1973. April 2, 2004.
B. RA 3469
A. RA 9286
C. EO 90
B. RA 3931
D. RA 7835
C. RA 9003 D. PD 1067
__78. Water Code of the Philippines. 1977. __84. Penalizing Squatting And Other Similar Acts. 1975.

A. PD 1586 A. PD 772

B. RA 3931 B. PD 49

C. RA 9003 C. RA 9003

D. PD 1067 D. RA 8293

__79. Ecological Waste Management Program Law. __85. Intellectual Property Code of the Philippines. June22,
1997 / January 1, 1998.
January 26, 2001.
A. RA 3019
A. PD 1586
B. PD 49
B. RA 3931
C. RA 9003
C. RA 9003
D. RA 8293
D. PD 1152
__86. Decree on Intellectual Property. November 14,
__80. National Water and Air Pollution Control
1972.
Commission. June 18, 1964.
A. RA 3019
A. PD 1586
B. PD 49
B. RA 3931
C. RA 9003
C. RA 9003
D. RA 8293
D. PD 1152
__87. Anti-Graft and Corrupt Practices Act. 1961.
__81. Establishing Environmental Impact Statement System.
1978. A. RA 3019

A. PD 1586 B. RA6713

B. PD 984 C. RA 9003

C. RA 9003 D. RA 8293

D. PD 1152 __88. Law on Acquisition of Right-of-Way, Site or Location for


National Government Infrastructure Projects.
__82. Philippine Environmental Code. June 6, 1977.
November 7, 2000.
A. PD 772
A. EO 525
B. PD 984
B. RA 6713
C. RA 9003
C. RA 8974
D. PD 1152
D. RA 8293
__83. Pollution Control Decree. 1976.
__89. Magna Carta for Scientists, Engineers, &Researchers in
A. PD 772
the Government. December 22, 1997
B. PD 984
A. EO 525
C. RA 9003
B. RA 8439
D. RA 8293
C. RA 6713

D. RA 8293
__90. Code of Ethical Conduct of a Public Official and __96. Transportation?
Employees. 1972.
A. DIVISION 26
A. EO 525
B. DIVISION 34
B. RA 8439
C. DIVISION 45
C. RA 6713
D. DIVISION 31
D. RA 8293
__97. Fire Suppression?
__91. Master Format was released in 1975 and only had16
A. DIVISION 26
Divisions until the new 50 Division Master Formatas released
in late? B. DIVISION 20
A. 2004 C. DIVISION 22
B. 2005 D. DIVISION 21
C. 2003 __98. Concrete?
D. 2006 A. DIVISION 03
__92. Wood, plastics and composites? B. DIVISION 06
A. DIVISION 03 C. DIVISION 08
B. DIVISION 06 D. DIVISION 14
C. DIVISION 20 __99. Equipment?
D. DIVISION 11 A. DIVISION 05
__93. Electronic Safety and Security? B. DIVISION 06
A. DIVISION 26 C. DIVISION 12
B. DIVISION 34 D. DIVISION 11
C. DIVISION 45 __100. Process Interconnection?
D. DIVISION 28 A. DIVISION 41
__94. Finishes? B. DIVISION 46
A. DIVISION 02 C. DIVISION 45
B. DIVISION 07 D. DIVISION 40
C. DIVISION 09

D. DIVISION 13

__95. Electrical Power Generation?

A. DIVISION 40

B. DIVISION 41

C. DIVISION 46

D. DIVISION 48