You are on page 1of 4

CURRICULUM VITAE

SUNIL KUMAR PAL E - mail: - sunilraj023@gmail.com


Vill-SHIVALAHIYA                             Mobile no: 9696711373
Post-CAMPIER GANJ Passport No: H8779482
Dist- GORAKHPUR
Uttar Pradesh(India) Pin-273158

Career Objective

To use my acquired and inherent skills in the field of technology for development of advanced new generation systems.

Work & Experience

Total Experience : Total 12 years’ Experience.


Current Company : Ansh Electrical, Luck now
Designation : Project Manager- Deployment (JIO FFTX Project)
Work Period : Nov 2018 to Apr 20.
Job Profile : Deployment of optical fiber for RJIO FTTX Project
Responsibilities :
 Team handling and management of more than 40 people.
 Optical Fiber deployment for JIO FTTX project in Uttar
Pradesh (Kanpur, Lucknow, Pratapgarh).
 Maintain quality and work progress report to achieve target
timely.
 Responsibility of Pole installation, optical fiber splicing and
local public dealing.
 Material Tracking.
 Loss rectification with the help of OTDR and maintain
optical power within threshold limit.

Previous Company : Bharti Airtel Ltd.


Designation : Sr. Engineer (Optical Fiber)
Work Period : Feb 2012 to Oct 2018.
Job Profile : Operation & Maintenance of Optical Fibre network.
Responsibilities : (Oct’15 to Oct’18 in Bharti Airtel, GUWAHATI

 Prepare Fiber Performance report for entire NESA Circle and


support to achieve Goal.
 Maintain quality work progress report and discuss with
vendor to achieve target timely.
 Handling more than 1500 equipment's such as ECI
XDM2000, ECI 300, BG20, BG64, XDM 100, XDM 900,
and ALCATEL DWDM(1678,1626) ,Huawei OSN
8880,OSN 3800 Ciena 6200, 8700, 5160,3900
 Support to field team to maintain Optical Fiber Network in
NESA Circle (Assam, Meghalaya, Tripura, Mizoram,
Manipur, Nagaland ).
 Prepare Fiber Performance report for entire NESA Circle and
support to achieve Goal.
 Coordinate with other operator to improve leased
Fiber performance.
 Monitoring and implementing Ciena EPT roll out and fiber
readiness for 4G for Intracity and backbone.
 Provide Maintenance window and support to improve fiber
health for better network quality.
 Support to minimize faults(fiber cut, ring failure
Section isolation) and also to maintain SLA.
 Prepare site outage report and discuss with erection and
infratel to improve outage of 2G/3G/4G outages.
 Support to minimize faults(fiber cut, ring failure
Section isolation) and also to maintain SLA.

Responsibilities : (Feb’2012 to Sep’15 in Bharti Airtel NOC, MANESAR GURGAON)


 Alarm monitoring of Optical transport network for Bharti PAN India network
And open trouble ticket as well as support to close open incident ticket with
the
Help of NMS. (ECI, Huawei, Alcatel, Nortel, Ciena)
 End to End ownership of complex incidents require active resolution.
 Provide remote support to field team to resolve the hardware /software
Related problem.
 Fibre health check-up and take preventive action to improve network quality.
 Co-ordinate and mobilize resources (Spare, Field technician, Fiber team, OLA
site access etc.) Support pipeline management 24*7.
 Maintaining SLA, NES, MTTR and Repair time (RET) within agreed limits.
 Has a logical approach to fault finding including working on NOC Ticketing
systems.
 Experience of Net cool, Smarts.

Previous Company: HUAWEI Technologies. Co. Ltd. On role of VAYAM INFOSOLUTIONS Pvt. Ltd.
Work Period : April 2011 to Jan 2012.
Job Profile : Monitor and Resolution of Transmission Network.
Responsibilities : I> Alarm monitoring of Optical transport network for Bharti Airtel on
Huawei NMS U2000 Client, ECI, Alcatel, Nortel, CIENA
II> Troubleshooting of problems in Huawei DWDM OSN 8800, 3800. Alcatel 1678, 1660,
ECI XDM- 100, XDM-300, XDM-1000, XDM-2000
III> Fault Analysis by Analyzing, isolating network services problems and resolution of
Faults as per agreed SLA
IV> Perform/remote support for planned activity execution.
V > Escalation of fault to 2nd/3rd level as per SLA and follow up with
TAC/GTAC for resolution of the fault.
VI>Prepare optical Power level report for whole network Analyze and notify the
problematic parameters.
VII>Network surveillance to identify alarms / problems and take out the inference/impact of
The alarms immediately to raise Trouble tickets.
VIII> Monitor and maintain the health of all transmission equipment’s deployed in network
(Manage visibility & work ability).

Previous Company : Nokia Siemens Network on the Role of Avion Systems Pvt. Ltd.
Designation : Customer Support Engineer (BTS)
Project : O & M for BSNL (Haryana)
Work Period : Jan 2011 to April 2011

Previous Company : R.D.Infratel Pvt. Ltd., GHAZIABAD.


Work Period : July 2008 to Dec 2010.
Job Profile : BTS Installation & Commissioning Engineer for NSN & ERICSSON Project.
Project Done : i) Idea Project for UP East & UP West (Nokia BTS)
ii) Vodafone Project for Punjab (Ericsson BTS)
iii) Uninor Project for UP East (Ericsson BTS)

Job responsibilities: for NOKIA BTS:

 Working on NOKIA BTS installation


 Commissioning of NOKIA BTS
 Microwave & GSM installation
 Commissioning of Siemens (SARAL XD).
 To measure the VSWR with the help of Site Master.

Job responsibilities: for Ericsson BTS


 Worked on Ericsson BTS installation
 Commissioned Ericsson BTS.
 Microwave & GSM installation
 To Handle Site Master.

Professional Qualification

 B-Tech in Electrical and Electronics Egg. From IIMT Engineering College (affiliated to U.P.T.U.), Meerut
(U.P.) in 2008..
Key Strengths and Technical skills

 Hard working and Goal oriented

 Easily working with Microsoft Office tools such as Word, Excel, etc...


Seminar and Training

Project: To control stepper motor based on microcontroller.

Seminar report: NUCLEAR POWER PLANT

Summer training: UPPCL GORAKHPUR, 220 KV SUB-STATION

Project Done

Worked On Controlling of Stepper Motor Based on Microcontroller for the automatic controlling of stepper motor.
DESCRIPTION:
In this project the speed of stepper motor is controlled by using the microcontroller by giving electric pulses to
the motor. In this project AT89C51 microcontroller is used for controlling of permanent magnet type stepper motor.

Other Achievements and Activities

 Participated in various cultural activities at school and college level.

 Industrial Visit in ESCORT Company in Faridabad (Assembly Unit).

Personal Details

Name : Sunil Kumar Pal


Father’s Name : Mr. Shoharat Prasad
Date of Birth : 22 Aug 1984
Sex : Male
Marital Status : Married
Nationality : Indian
Permanent Address : S\O Mr. Shoharat Prasad Vill-Shivalahiya,
Post- Campierganj, Dist- Gorakhpur ,Uttar Pradesh,India
Pin-273158
Language Known : English, Hindi
Declaration

I, hereby, declare that all the information furnished above are true and all the documents produced in the support of my
statements are legal and authentic.

Current CTC:
Expected CTC:

Notice period:

Date :
 
Place: SUNIL KUMAR PAL

You might also like