Shakurbasti PROJECT

April 2022 May 2022 June 2022 July 2022 August 2022 September 2022 October 2022 November 2022 December 2022 January 2023 February 2023 March 2023 April 2023
10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 12 19 26 05 12 19 26 02
31-Mar-23, Shakurbasti PR

14-Oct-22, General Works For Projrcts


HYT site staff appointment
Prepration and Approval of Raw material and design mix M-35
Prepration and Approval of Raw material and design mix M-25
Intial Pile Load Test 16mtr (For Sheds)
Intial Pile Load Test 12mtr (For RCC building)
Mobilization of Concrete Batching Plant
Land Mobilization of Necessary location for Labour hutment / Store / Stacking yard
Neccesory Permision form Forest Department for tree cutting
Agency Finalization
Work Order to PEB contractor
Purchase order for Electrical works
Placment of PO for Stone Blast for Track work
Placment of PO for Electrical Cable
Preparation of Cable PO As per approved make & Approved variation Qty
Preparation of LT Panel PO As per approved make & Approved variation Qty
Preparation of Light & Fan PO As per approved make & Approved variation Qty
Preparation of High Mast & Street Light Pole PO As per approved make & Approved variation Qty
Purchase order for Mechanical works
Placment of PO for Automatic Coach Washing System having provision of Effluent Treatment Plant & Water R
Placment of PO for Synchronized Pit Jacks
Placment of PO for Boggie Drop Pit table
Placment of PO for Retractable OHE
Placment of PO for Bogie Storage Rack
Placment of PO for Wheel Set Storage Rack
Placment of PO for ETP, Cap. 50 KLD
Placment of PO for Material bins, Pallets, Hand pallet Truck etc.
Placment of PO Imported material EOT Crane, Capacity-3T
Placment of PO Imported material EOT Crane, Capacity-15T
Placment of PO for Mobile Lifting Table (Scissor Lift) 01 Ton
Placment of PO for Mobile Lifting Table 03 Tonnes
Placment of PO for Battery Operated Platform Truck
Placment of PO for Fork Lift 5 Ton with accessories
Placment of PO for Office work stations, storage racks, lockers, office equipment & Furniture etc.
Placment of PO for Tandem type under floor wheel lathe with Shed
Placment of PO for Rail cum Road vehicle
Placment of PO for Portable Rectifier Inverter Based Welding Set, 200 Amp
Placment of PO for Scissor Lift (Height min. 3 m)
Placment of PO for Hand Tools and Equipments
Placment of PO for Safety wire for Train- 18/Grouter System
Placment of PO for Laying of pipe lines for all compressor
Placment of PO for Air Plasma Cutting Equipment
Placment of PO for Multi-utility Vehicle
Placment of PO for Non- motorized bogie turn table, Cap. 15T
Placment of PO for Air conditioner for DV Test Room, Conference Room etc.
Placment of PO for Laser Scanning wheel profile
Placment of PO for Design Work Station with 3D Printer and other accessories
31-Mar-23, Detailed Work p
23-Oct-22, Modification of Foot over bridge Landing with construction of new Stair case

Actual Level of Effort Remaining Work Milestone


Actual Work Critical Remaining Work summary
Shakurbasti PROJECT
April 2022 May 2022 June 2022 July 2022 August 2022 September 2022 October 2022 November 2022 December 2022 January 2023 February 2023 March 2023 April 2023
10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 12 19 26 05 12 19 26 02
23-Jul-22, Drawing work
Approval of GAD drawing from Northern Railway
Preparation of Foundation Structural Drawing
Forward Foundation Structural drawing to IIT for Proof check
Approval of Foundation Structural drawing by WPO
Preparation of Structure steel Drawing
Preliminary approval of structure steel drawing by WPO
Forward Structure steel drawing to IIT for Proof check
Approval of structure steel drawing by WPO
Preparation of Fabrication Drawing
Approval of Fabrication drawing by WPO
26-Aug-22, Civil work
Temp. barricading from existing Shed
Foundation work
RCC Column/Pedestal incl.Anchor bolt fixing
23-Oct-22, Strcture steel work
Procurement to Raw Material
Delivery of Material at site
Structure Steel fabrication work
Erection of Column and stair case work
Roof work Incl. Roof sheeting work
Flooring work Ground area and handing over
13-Dec-22, Dismantling of existing Landing of FOB and re-construction of Boundary wall Fencing (Running room)
28-Jul-22, Drawing work
Preparation of Boundary wall fencing drawing
Approval of Boundary wall fencing drawings by WPO
Dismantling GAD approval from NR
13-Dec-22, Civil work
Procurement of Raw material for Fencing work
Fabrication and erection of Fencing posts
Construction of Boundary wall / Fencing of running room 140 Rmt
Dismantling of Old Boundary wall of Running room / Miscl. Rooms
Dismantling of existing Landing FOB (Dependent to Completion of Proposed Landing)
15-Dec-22, Construction of New Time office
12-Jun-22, Drawing work
Approval of Arch. GAD drawing from Design office, Patna
Preparation of Foundation Structural Drawing
Forward Foundation Structural drawing to IIT for Proof check
Approval of Foundation Structural drawing by WPO
Preparation of Electrical Drawings
Submission and Approval of Electrical Drawings by WPO
07-Nov-22, Civil work
Foundation work
RCC Column work
Plinth beam work
Shuttering removal & Backfilling work
Super structure work (considering single story)
External Brick work
Internal Partition wall work
Fixing of Door shutters / window
Toilet work

Actual Level of Effort Remaining Work Milestone


Actual Work Critical Remaining Work summary
Shakurbasti PROJECT
April 2022 May 2022 June 2022 July 2022 August 2022 September 2022 October 2022 November 2022 December 2022 January 2023 February 2023 March 2023 April 2023
10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 12 19 26 05 12 19 26 02
Flooring work
Plastering work internal
Plastering work External
Painting work External
Painting Internal work
15-Dec-22, Electrical work
Point Wiring Work
Installation Of DB
Installation Of Light Fitting
Installation Of Fan
Hand over
02-Oct-22, Extension of Pit Wheel lathe Line 425 Mtr
30-Jun-22, Civil work
Dismantling of existing structure (Store room and other room etc)
Identification of Un-charted / charted utility and diversion the same
Infringed Tree Cutting work / shifting work
02-Oct-22, P. Way work
Excavation / Compaction /Laying of Stone Blast / Sleepers / Rail track
Linking of BG Track / Packing of PSC sleepers
Alignment of Track
PTC & Handing Over
26-Nov-22, Construction of new Electrical Sub station
12-Jun-22, Drawing work
Approval of GAD drawing from Design office, Patna
Preparation of Foundation Structural Drawing
Forward Foundation Structural drawing to IIT for Proof check
Approval of Foundation Structural drawing by WPO
Preparation of Electrical Drawings
Submission and Approval of Electrical Drawings by WPO
17-Oct-22, Civil work
Foundation work Trench For Cable
RCC Pedestral work
Plinth beam work
Shuttering removal & Backfilling work
Super structure work (considering single story)
External Brick work
External Plastering work
External Painting work
Internal Partition wall work
Internal Plastering work
Flooring work
Fixing of Main Door / R.s Gate
Painting Internal work
Identification of uncharted utility
Dismantling of office building structure (Admin block)
26-Nov-22, Electrical work
Point Wiring Work
Installation Of DB
Installation Of Light Fitting
Installation Of Fan
Hand over

Actual Level of Effort Remaining Work Milestone


Actual Work Critical Remaining Work summary
Shakurbasti PROJECT
April 2022 May 2022 June 2022 July 2022 August 2022 September 2022 October 2022 November 2022 December 2022 January 2023 February 2023 March 2023 April 2023
10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 12 19 26 05 12 19 26 02
18-Dec-22, Construction of new Canteen Cum control room
28-May-22, Drawing work
Approval of GAD drawing by WPO
Preparation of Foundation Structural Drawing
Forward Foundation Structural drawing to IIT for Proof check
Approval of Foundation Structural drawing by WPO
Preparation of Electrical Drawings
Submission and Approval of Electrical Drawings by WPO
14-Nov-22, civil work
Dismantling of existing structure (Admin block)
infringed Tree Cutting work / shifting work
Identification of Un-charted / charted utility and diversion the same
Foundation work (approx. 100 pile and 50 pile cap) link with Test pile
RCC Column work
Plinth beam work
Super structure work (1st story)
External Brick work
Internal Partition wall work
Fixing of Door shutters and window
Toilet waterproofing
Toilet Plumbing work
Toilet wall and floor tile
Toilet CP Fittings etc,
Flooring work Gr floor incl Stich slab
Plastering work internal
Plastering work External
Painting work External
Painting Internal work
18-Dec-22, Electrical work
Point Wiring Work
Installation Of DB
Installation Of Light Fitting
Installation Of Fan
Handing over
08-Dec-22, Construction of New Stabling Line With washing apron CSR 420M x 5.5M x 1nos. (LINE -1)
21-Jun-22, Drawings Work
Approval of GAD drawing by WPO
Preparation of Foundation Structural Drawing
Forward Foundation Structural drawing to IIT for Proof check
Approval of Foundation Structural drawing by WPO
Preparation of Electrical Drawings
Submission and Approval of Electrical Drawings by WPO
04-Jul-22, Civil Works
Shifting of machinery / Hoist cranes / electrical equipment's / EOT crane etc.
Dismantling of existing structure (Machine room shop) Super structure only
Dismantling of existing structure (Assembly section shed) Super structure only
infringed Tree Cutting work / shifting work
Identification of Un-charted / charted utility and diversion the same
26-Sep-22, P.Way work Track Foundation work (Line-1) Track
Excavation of Trench for foundation work

Laying of WBM over compacted earth surface

Actual Level of Effort Remaining Work Milestone


Actual Work Critical Remaining Work summary
Shakurbasti PROJECT
April 2022 May 2022 June 2022 July 2022 August 2022 September 2022 October 2022 November 2022 December 2022 January 2023 February 2023 March 2023 April 2023
10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 12 19 26 05 12 19 26 02
PCC work
RCC Raft foundation work
Casting of Plinth Beam for Rail track (in proper line / leveling)
CC Filling between the track
Preparation of RCC/brick work Drain gutter work (both side of track)
Laying of PCC for VDF flooring
Laying of VDF flooring
Fixing of Rail over the plinth Beam
28-Oct-22, PEB work (Catwalk)
Procurement of RAW material (Incl Inspection)
PEB fabrication work (Catwalk platform)
Inspection of Fabricated material (5th day from date of Fabrication start & upto 2nd day after last Fabrication done)
PEB Fabricated material dispatch for blasting & painting incl. submission of mediatory tests and inspection
Delivery of PEBd material at site (with in 7 day from date of Inspection)
Erection of Catwalk platform (Linked with IBL shed PEB column)
23-Nov-22, Electrical work
Laying Of Mains & Sub Mains For Catwalk, Pit Light, Other Light Fitting
Installation Of Catwalk, Pit Light, Other Light Fitting
Installation Of Fan
Installation Of DB & Poewer Socket
Installation Of LT Panel
Laying Of Incoming & Out Going LT Cable
Preparation Of Earth Pit
Earthing Strip Laying
Testing & Commissioning
08-Dec-22, Mechanical work
Placment of PO for ETP, Cap. 50 KLD
Delivery of PO for ETP, Cap. 50 KLD
Erection of PO for ETP, Cap. 50 KLD
PTC & Handing Over
29-Dec-22, Construction of NewTendom Wheel lathe 65mtr x 20Mtr
25-Aug-22, Drawings work
Approval of GAD drawing by WPO
Preparation of Foundation Structural Drawing
Forward Foundation Structural drawing to IIT for Proof check
Approval of Foundation Structural drawing by WPO
Preparation of PEB Drawing
Preliminary approval of PEB drawing by WPO
Forward PEB drawing to IIT for Proof check
Approval of PEB drawing by WPO
Approval of Fabrication drawing by WPO
Preparation of Electrical Drawings
Submission and Approval of Electrical Drawings by WPO
Preparation of Mechanical Drawings (Tandem wheel lathe drawing)
Submission and Approval of Mechanical Drawings by WPO
25-Aug-22, Civil work
Dismantling of existing structure (Office building)
Infringed Tree Cutting work / shifting work
Identification of Un-charted / charted utility and diversion the same
Intial Pile Load Test 16mtr (For Sheds)
25-Aug-22, Foundation work / Sub structure work

Actual Level of Effort Remaining Work Milestone


Actual Work Critical Remaining Work summary
Shakurbasti PROJECT
April 2022 May 2022 June 2022 July 2022 August 2022 September 2022 October 2022 November 2022 December 2022 January 2023 February 2023 March 2023 April 2023
10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 12 19 26 05 12 19 26 02
Piling work (Total 88nos. Pile )
Excavation and PCC work
Pile head chipping
Pile cap work (22nos.)
RCC Pedestal / Stub column work for PEB column anchoring
Plinth beam work (For external Brick work)
External Brick work
Plastering
Painting work
06-Aug-22, Tandem Wheel lathe Pit wheel foundation work
Excavation
PCC work
RCC foundation and wall work to upto FFL lvl
VDF Flooring work
23-Nov-22, PEB work
Procurement of Raw material (Incl. inspection)\
Structure Steel fabrication work (PEB)
Inspection of Fabricated material (5th day from date of Fabrication start & upto 2nd day after last Fabrication done)
Structure PEB material dispatch for blasting & painting incl. submission of mediatory tests & inspection,
Delivery of Fabricated material at site (with in 7 day from date of Inspection)
Erection of Column & Roof PEB for building
Roof sheeting & cladding work
09-Sep-22, P. Way work
Excavation of Trench for foundation work
Laying of WBM over compacted earth surface
PCC work
RCC Raft foundation work
Casting of Plinth Beam for Rail track (in proper line / leveling)
CC Filling between the track
Laying of PCC for VDF flooring
Laying of VDF flooring
Fixing of Rail over the plinth Beam
17-Oct-22, Electrical work
Laying Of Mains & Sub Mains For Light Fitting
Installation Of Light Fitting
Installation Of Fan
Installation Of DB & Poewer Socket
Installation Of Pit Light & Catwalk Light
Installation Of LT Panel
Laying Of Incoming & Out Going LT Cable
Preparation Of Earth Pit
Earthing Strip Laying
Testing & Commissioning
29-Dec-22, Mechanical work
PO Placment for Tandem type under floor wheel lathe with Shed
Delivery of Safety Wire for Tandem type under floor wheel lathe with Shed
Execution & erection of Tandem type under floor wheel lathe with Shed
PTC & Handing over
28-Nov-22, Extension of existing DEMU shed 50mtrx12mtr
30-Jun-22, Drawing work
Approval of GAD drawing by WPO

Actual Level of Effort Remaining Work Milestone


Actual Work Critical Remaining Work summary
Shakurbasti PROJECT
April 2022 May 2022 June 2022 July 2022 August 2022 September 2022 October 2022 November 2022 December 2022 January 2023 February 2023 March 2023 April 2023
10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 12 19 26 05 12 19 26 02
Inspection of Existing structure Design at site
Preparation of Foundation Structural Drawing
Forward Foundation Structural drawing to IIT for Proof check
Approval of Foundation Structural drawing by WPO
Preparation of Structure steel Drawing
Preliminary approval of Structure steel drawing by WPO
Forward Structure steel drawing to IIT for Proof check
Approval of Structure steel drawing by WPO
Preparation of Fabrication Drawing
Approval of Fabrication drawing by WPO
Preparation of Electrical Drawings
Submission and Approval of Electrical Drawings by WPO
05-Sep-22, Civil work
Dismantling of existing structure (sub surface if any)
infringed Tree Cutting work / shifting work
Identification of Un-charted / charted utility and diversion the same
Intial Pile Load Test 16mtr (For Sheds)
05-Sep-22, Foundation work / Sub structure work
Piling work (Total 56nos. Pile )
Excavation and PCC work
Pile head chipping
Pile cap work (14nos.)
Plinth beam work (For external Brick work)
RCC Pedestal work 1st lift 2.4mtr height (14nos.)
1st Tie Beam Casting (alongwith Catwalk slab)
RCC Pedestal work 2nd lift upto Lintel bottom lvl
Lintel Beam Casting
RCC Pedestal work 3rd lift upto Bracket bottom lvl
Beam at Bracket Level
RCC Pedestal work Final lift upto Truss bottom level Tie beam bottom 2.75Mtr
3rd Tie Beam Casting
External Brick work
Plastering work
Painting work
VDF Flooring work
07-Sep-22, Structure steel work
Supply of Raw material (incl inspection)
Structure Steel fabrication work
Inspection of Fabricated material (5th day from date of Fabrication start & upto 2nd day after last Fabrication done)
Structure steel material dispatch for blasting & painting incl. submission of mediatory tests and inspection,
Delivery of Fabricated material at site (with in 7 day from date of Inspection)
Erection of structure steel truss work
Roof sheeting & cladding work
28-Nov-22, P. Way work
28-Nov-22, Track Foundation work (Line-1) Track
Excavation of Trench for foundation work
PCC work
RCC Raft foundation work (Line-1)
RCC Raft foundation work (center catwalk)
RCC Raft foundation work (Line-2)
Casting of Plinth Beam for Rail track (in proper line / leveling) line-1

Actual Level of Effort Remaining Work Milestone


Actual Work Critical Remaining Work summary
Shakurbasti PROJECT
April 2022 May 2022 June 2022 July 2022 August 2022 September 2022 October 2022 November 2022 December 2022 January 2023 February 2023 March 2023 April 2023
10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 12 19 26 05 12 19 26 02
linth Beam for Rail track (in proper line / leveling) line-2
Column for Center catwalk
Slab work for center catwalk
CC Filling between the track
Laying of PCC for VDF flooring
Laying of VDF flooring
Fixing of Rail over the plinth Beam Line-1
Fixing of Rail over the plinth Beam Line-2
28-Nov-22, Electrical work
Laying Of Mains & Sub Mains For Light Fitting
Installation Of Light Fitting
Installation Of Fan
Installation Of DB & Poewer Socket
Installation Of LT Panel
Laying Of Incoming & Out Going LT Cable
Preparation Of Earth Pit
Earthing Strip Laying
Testing & Commissioning
PTC & Handing Over
14-Dec-22, Shunting Neck DE CH 193 to FM1 CH 155 upto all Connection with new sheds line
21-Aug-22, Civil work
Dismantling of Tample and Miscl. Struc.
infringed Tree Cutting work / shifting work
Identification of Un-charted / charted utility and diversion the same
14-Dec-22, P.way work
Laying of Stone Blast / Sleepers / Rail track
Linking of BG Track / Packing of PSC sleepers
Alignment of Track
PTC & Handing Over
20-Nov-22, Construction of Underground fire fighting Tank
Approval of GAD drawing by WPO
Preparation of Foundation Structural Drawing
Forward Foundation Structural drawing to IIT for Proof check
Approval of Foundation Structural drawing by WPO
Preparation of Electrical Drawings
Submission and Approval of Electrical Drawings by WPO
Dismantling of existing structure
infringed Tree Cutting work / shifting work
Identification of Un-charted / charted utility and diversion the same
Excavation of Pit for UG tank
PCC work
Foundation work
R/wall work (External)
R/wall work (Internal)
Stair case work
UGT Slab work
Flooring work
Stair case Mumpty
Electrical work
Handing over
11-Mar-23, Construction of New Work shop sh

Actual Level of Effort Remaining Work Milestone


Actual Work Critical Remaining Work summary
Shakurbasti PROJECT
April 2022 May 2022 June 2022 July 2022 August 2022 September 2022 October 2022 November 2022 December 2022 January 2023 February 2023 March 2023 April 2023
10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 12 19 26 05 12 19 26 02
29-Jul-22, Drawing work
Approval of GAD drawing by WPO
Preparation of Foundation Structural Drawing
Forward Foundation Structural drawing to IIT for Proof check
Approval of Foundation Structural drawing by WPO
Preparation of PEB Drawing
Preliminary approval of Fabrication drawing by WPO
Forward PEB drawing to IIT for Proof check
Approval of PEB drawing by WPO
Preparation of Fabrication Drawing
Approval of Fabrication drawing by WPO
Preparation of Electrical Drawings
Submission and Approval of Electrical Drawings by WPO
Preparation of drawing for Synchronized Pit Jacks (8-Cars Lifting) with associated accessories/spares/services etc.
Submission and Approval of drawing for Synchronized Pit Jacks (8-Cars Lifting) with associated accessories/spares/servi
Preparation of Wheel Set Storage Rack drawing
Preparation of Bogie Storage Rack
Submission and Approval of drawing for Bogie Storage Rack
Preparation of EOT Crane, 15T
Submission and Approval of drawing for EOT Crane, 15 T
17-Feb-23, Civil work
Dismantling of existing structure (running bay)
infringed Tree Cutting work / shifting work
Identification of Un-charted / charted utility and diversion the same
Intial Pile Load Test 16mtr (For Sheds)
Foundation work (Incl. Synchronized Pit Jack foundation)
RCC Pedestal work
Plinth beam work
Shuttering removal & Backfilling work
Super structure of service Building Gr floor roof slab
Super structure of service Building 1st floor roof slab
Brick work / wall cladding work (work shop shed)
Brick work / wall cladding work (service building Gr floor)
Brick work / wall cladding work (service building 1st floor)
Flooring work (work shop Shed)
Flooring work (Service Building Gr floor)
Flooring work (Service Building 1st floor)
Plastering Internal (work shop shed)
Plastering Internal (Service Building Gr floor)
Plastering Internal (Service Building 1st floor)
Painting work
04-Dec-22, PEB work
RAW Material Procurement and Inspection
Structure Steel fabrication work (PEB work)
Inspection of Fabricated material
PEB Fabricated material dispatch for blasting & painting (incl. submission of mediatory tests and inspection)
Delivery of Fabricated material at site
Erection of Steel Column and PEB Roof work
Roof sheeting & cladding work
18-Feb-23, P. Way work
15-Jan-23, Track Foundation work (Line-1) Track

Actual Level of Effort Remaining Work Milestone


Actual Work Critical Remaining Work summary
Shakurbasti PROJECT
April 2022 May 2022 June 2022 July 2022 August 2022 September 2022 October 2022 November 2022 December 2022 January 2023 February 2023 March 2023 April 2023
10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 12 19 26 05 12 19 26 02
Excavation of Trench for foundation work
Laying of WBM over compacted earth surface
PCC work
RCC Raft foundation work
Casting of Plinth Beam for Rail track (in proper line / leveling)
CC Filling between the track
Laying of PCC for VDF flooring
Laying of VDF flooring
Fixing of Rail over the plinth Beam
18-Feb-23, Track Foundation work (Line-2) Track
Excavation of Trench for foundation work
Laying of WBM over compacted earth surface
PCC work
RCC Raft foundation work
Casting of Plinth Beam for Rail track (in proper line / leveling)
CC Filling between the track
Laying of PCC for VDF flooring
Laying of VDF flooring
Fixing of Rail over the plinth Beam
06-Feb-23, Electrical work
Laying Of Mains & Sub Mains For Light Fitting
Installation Of Light Fitting
Installation Of Fan
Installation Of DB & Poewer Socket
Installation Of LT Panel
Laying Of Incoming & Out Going LT Cable
Preparation Of Earth Pit
Earthing Strip Laying
Testing & Commissioning
11-Mar-23, Mechanical Work
PO Placment for EOT Crane, 15 T
Delivery of Safety Wire for EOT Crane, 15 T
Execution & erection of EOT Crane, 15 T
PO Placment for Safety wire for Train- 18/Grouter System
Delivery of Safety wire for Train- 18/Grouter System
Execution & erection of Safety wire for Train- 18/Grouter System
PO Placment for Bogie Storage Rack
Delivery of Bogie Storage Rack
Execution & erection of Bogie Storage Rack
Delivery of Wheel Set Storage Rack
Execution & erection of Wheel Set Storage Rack
Delivery of Sychronized Pit Jack
Execution & erection of Sychronized Pit jack
PTC & Handing over
31-Mar-23, Construction of
28-Jul-22, Drawing work
Approval of GAD drawing by WPO
Preparation of Foundation Structural Drawing
Forward Foundation Structural drawing to IIT for Proof check
Approval of Foundation Structural drawing by WPO

Actual Level of Effort Remaining Work Milestone


Actual Work Critical Remaining Work summary
Shakurbasti PROJECT
April 2022 May 2022 June 2022 July 2022 August 2022 September 2022 October 2022 November 2022 December 2022 January 2023 February 2023 March 2023 April 2023
10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 12 19 26 05 12 19 26 02
Preparation of Foundation & Structural Drawing Catwalk

Forward Foundation Structural drawing to IIT for Proof check


Approval of Foundation Structural drawing by WPO (Catwalk )
Approval of febrication Drawing
Preparation of PEB Drawing
Preliminary approval of Fabrication drawing by WPO
Forward PEB drawing to IIT for Proof check
Approval of PEB drawing by WPO
Approval of Fabrication drawing by WPO
Preparation of Steel structure & Foundation Drawing Elevated
Preliminary approval of Steel structure & Foundation drawing from WPO
Forward PEB drawing to IIT for Proof check
Approval of Steel structure drawing to WPO
Preparation of Fabrication Drawing
Approval of Fabrication drawing by WPO
Preparation of Electrical Drawings
Submission and Approval of Electrical Drawings by WPO
Preparation of Boggie Drop pit table
Submission and Approval of Boggie Drop pit table
Preparation of EOT Crane, Capacity-3T
Submission and Approval of EOT Crane, Capacity-3T Drawings by WPO
Preparation of Retractable OHE
Submission and Approval of Retractable OHE
29-Oct-22, Civil work
Dismantling of existing structure (Covered running bay/Laboratory / control room)
infringed Tree Cutting work / shifting work
Identification of Un-charted / charted utility and diversion the same
Intial Pile Load Test 16mtr (For Sheds)
29-Aug-22, Foundation work (Wall adjoining with stabling line)
Piling work (Total 232nos. Pile )
Excavation and PCC work
Pile head chipping
Pile cap work (58nos.) 3x3x1.5mtr
58nos. RCC Pedestal / Stub column work for PEB column anchoring (5set frame) incl fixing and alignment of Anchor bolt
Plinth beam for Brick work
Raft Foundation work for Catwalk platform (40mtr/day) + 10day r/f & frame work
RCC Pedestal / Stub column work for PEB column anchoring (8set frame) incl fixing and alignment of Anchor bolt for ste
29-Oct-22, Foundation work (wall facing toward DEMU shed)
Piling work (Total 232nos. Pile)
Excavation and PCC work
Pile head chipping
Pile cap work (58nos.)
58nos. RCC Pedestal / Stub column work for PEB column anchoring (5set frame) incl fixing and alignment of Anchor bolt
Plinth beam for Brick work
Raft Foundation work for Catwalk platform (40mtr/day) + 10day r/f & frame work
RCC Pedestal / Stub column work for PEB column anchoring (8set frame) incl fixing and alignment of Anchor bolt for st
External Brick work (Wall adjoining with stabling line)Apx. 280Cum1.5cum/Day x 5 Gang (Incl Lintel beam work)
Fixing of Windows 1800x1500 x 50nos.
Plastering Internal surface Approx.. 1200Sqm (15Sqm/day x 5 Gang)

Actual Level of Effort Remaining Work Milestone


Actual Work Critical Remaining Work summary
Shakurbasti PROJECT
April 2022 May 2022 June 2022 July 2022 August 2022 September 2022 October 2022 November 2022 December 2022 January 2023 February 2023 March 2023 April 2023
10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 12 19 26 05 12 19 26 02
Plastering External surface Approx.. 1200Sqm (15Sqm/day x 5 Gang)
Painting work Internal surface
Painting work external surface
External Brick work (Wall adjoining with stabling line)Apx. 280Cum1.5cum/Day x 5 Gang
Fixing of Windows 1800x1500 x 50nos.
Plastering Internal surface Approx.. 1200Sqm (15Sqm/day x 5 Gang)
Plastering External surface Approx.. 1200Sqm (15Sqm/day x 5 Gang)
Painting work external surface
Painting work Internal surface
Plastering / cladding over the RCC pedestal
12-Dec-22, PEB work
27-Sep-22, PEB column (adjoining with Stabling line)
Procurement of RAW material and inspection
PEB fabrication work (58nos.)
Inspection of Fabricated material (5th day from date of Fabrication start & upto 2nd day after last Fabrication done)
Structure PEB material dispatch for blasting & painting incl. submission of mediatory tests and inspection,
Delivery of Fabricated material at site (with in 10 day from date of Inspection)
Erection of PEB work
11-Oct-22, PEB column (facing toward Demu shed)
PEB fabrication work (58nos.)
Inspection of Fabricated material (5th day from date of Fabrication start & upto 2nd day after last Fabrication done)
PEB Fabricated material dispatch for blasting & painting incl. submission of mediatory tests and Inspection
Delivery of Fabricated material at site (with in 7 day from date of Inspection)
Erection of Columns (Linked with Pedestal casting + 7 day for strengthening)
12-Dec-22, PEB Roofing and sheeting
PEB fabrication work
Inspection of Fabricated material (5th day from date of Fabrication start & upto 2nd day after last Fabrication done)
Structure steel Fabricated material dispatch for blasting & painting incl. submission of mediatory tests and Inspectio
Delivery of Fabricated material at site (with in 7 day from date of Inspection)
Erection work
Roof sheeting work
26-Oct-22, Structure steel Catwalk Platform Lvl. 1.32M and 3.75M (one side)
Structure steel fabrication work
Inspection of Fabricated material (5th day from date of Fabrication start & upto 2nd day after last Fabrication done)
Structure steel Fabricated material dispatch for blasting & painting incl. submission of mediatory tests and Inspectio
Delivery of Fabricated material at site (with in 7 day from date of Inspection)
Erection (Linked with Pedestal casting + 7 day for strengthening)
17-Nov-22, Structure steel Catwalk Platform Lvl. 1.32M and 3.75M (other side)
Structure steel fabrication work
Inspection of Fabricated material (5th day from date of Fabrication start & upto 2nd day after last Fabrication done)
Structure steel Fabricated material dispatch for blasting & painting incl. submission of mediatory tests and Inspectio
Delivery of Fabricated material at site (with in 7 day from date of Inspection)
Erection (Linked with Pedestal casting + 7 day for strengthening)
14-Nov-22, P. Way work
06-Sep-22, Track Foundation work (Line-1) Track
Excavation of Trench for foundation work
Laying of WBM over compacted earth surface
PCC work
RCC Raft foundation work
14-Nov-22, Structure steel work for Elevated Track-1
Casting of Rcc Pedestal for Rail track (in proper line / leveling)
Structure steel fabrication work

Actual Level of Effort Remaining Work Milestone


Actual Work Critical Remaining Work summary
Shakurbasti PROJECT
April 2022 May 2022 June 2022 July 2022 August 2022 September 2022 October 2022 November 2022 December 2022 January 2023 February 2023 March 2023 April 2023
10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 12 19 26 05 12 19 26 02
Inspection of Fabricated material (5th day from date of Fabrication start & upto 2nd day after last Fabrication done)
Erection of Fabricated structure
CC Filling between the track
Preparation of RCC/brick work Drain gutter work (both side of track)
Laying of PCC for VDF flooring
Laying of VDF flooring
Fixing of Rail over the plinth Beam
11-Oct-22, Track Foundation work (Line-2) Track
Excavation of Trench for foundation work
Laying of WBM over compacted earth surface
PCC work
RCC Raft foundation work
Casting of RCC Pedestal for Rail track (in proper line / leveling)
14-Nov-22, Structure steel work for Elevated Track
Structure steel fabrication work
Inspection of Fabricated material (5th day from date of Fabrication start & upto 2nd day after last Fabrication done)
Erection of Fabricated structure
CC Filling between the track
Preparation of RCC/brick work Drain gutter work (both side of track)
Laying of PCC for VDF flooring
Laying of VDF flooring
Fixing of Rail over the plinth Beam
27-Jan-23, Electrical work
Laying Of Mains & Sub Mains For Light Fitting
Installation Of Light Fitting
Installation Of Fan
Installation Of DB & Poewer Socket
Installation Of LT Panel
Laying Of Incoming & Out Going LT Cable
Preparation Of Earth Pit
Earthing Strip Laying
Installation Of Pit Light & Catwalk Light
Testing & Commissioning
31-Mar-23, Mechanical wo
Delivery of EOT Crane, Capacity-3T
Execution of EOT Crane, Capacity-3T incl testing and commissioning
Delivery of Boggie Drop pit Table
Execution of bogie Drop Pit table incl testing and commis
Delivery of Retractable OHE
Execution of Retractable OHE incl testing and commissio
PTC & Handing over
31-Mar-23, Development D
Approval of General Development work and drainage works drawings approved by WPO
Approval of Electrical work drawings approved by WPO
Dismantling of existing Miscl. Or small structure structure
infringed Tree Cutting work / shifting work
Identification of Un-charted / charted utility and diversion the same
Sewage line laying work incl making of chambers
Drainage line laying work incl making of chambers
Electrical work(Cable laying and trench work electrical pole)
Excavation / backfilling work for road

Actual Level of Effort Remaining Work Milestone


Actual Work Critical Remaining Work summary
Shakurbasti PROJECT
April 2022 May 2022 June 2022 July 2022 August 2022 September 2022 October 2022 November 2022 December 2022 January 2023 February 2023 March 2023 April 2023
10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 12 19 26 05 12 19 26 02
Preparation sub-base for road
Laying of Bitumen macadam / Bitumen course
Boundary wall work / Plastering / painting
making of footpath work / K
Handing Over
15-Dec-22,Automatic Coach Washing System
Preparation of Automatic Coach Washing System having provision of Effluent Treatment Plant & Water Recyc
Submission and Approval of drawing for Automatic Coach Washing System having provision of Effluent Treatment
civil & Electrification work forACWP
Placment of PO for Automatic Coach Washing System having provision of Effluent Treatment Plant & Water R
Delivery of Automatic Coach Washing System having provision of Effluent Treatment Plant & Water Recycle
Erection of Automatic Coach Washing System having provision of Effluent Treatment Plant & Water Recycle
PTC & handing over