FM-IV-PRT-120_01
Form Port_Daily Report IK-II-PRT-001
FM-IV-PRT-121_00
Form Coal Production Summary IK-III-PRT-020 Instruksi kerja Penge
FM-IV-PRT-124_01
Form_Weekly Report SOP "Kontrol kontraktor manageme
SOP "pembuatan clossing stock por
SOP "pembuatan kontrak pekerjaan
Instruction to
Port Service
Receive Coal hauling info Contractor
relate to
Dumping Area
DT Dumping
Crosscheck with book stock
on the agreed
data
area
Supervise of
Prepare of Weighing utility
port Access
ROM stacking
with
Arrange DT with coal loaded
appropriate
enter Weigh Bridge
unit (wheel
Loader)
Check
Weighing DT with coal
suitability of
loaded as gross tonnage
loacation
after Weighing indicator
dumping with
shows stable number
coal type
Check
Receive Docket from Driver cleanliness of
DT (Hauling Contractor) the unit be
operate
Review coal
Review coal
crushing
crushing review coal
product
product barging forecast
forecast from
forecast from plant
Quality
Quality Section
Section
Provide info
Check
relate to
cleanliness of plant schedule
mechanical
Mobile plant maintenance
availability of
unit ready
crusher plant
Provide info
Stacking coal conduct
Mechanical
crush using unit schedule
Availability unit
that be checked maintenance
mobile plant
Start
Determination repair and-or
Rehandling
of mobile unit un-schedule
coal to other
be operation maintenance
port (BIB / BIC)
Check Supervise of
record plant
cleanliness of Stacking and
availability for
Mobile plant Rehandling
PA & MA
unit ready Activity
Fixed Plant
Supervise of review record
Contractor do
loading coal plant availability
start crusher
crusher for PA & MA
operation
Record of
Check Record
Crushing
coal trimming
Product
Check coal Checking of
reclaiming unit operation
type (plan - Actual)
Check of
Check hauling
production
road
record
Coal Trimming
PR-II-PRT-004Prosedur Pemuatan Batubara Kedalam Tongkang
ST-II-PRT-001Standar Commisioning Tugboat & Barge
IK-II-PRT-002Instruksi Kerja Shifting Tongkang di Jetty
IK-II-PRT-003Instruksi Kerja Penggunaan Tali Tambat (Mooring)
IK-II-PRT-004Instruksi Kerja Towing Tongkang
IK-II-PRT-007Instruksi Kerja Pengoperasian Speed boat di Loakasi Pelabuhan
barge movement
monitoring
barge berthing-
unberthing
proces
barge loading
process
barge loading
record
review and
disscus barge
loading record
Nilai Kriteria Kemungkinan/ Probability (P) Parameter
Cidera ringan, (Cidera LTI kurang Sakit dan perlu alat bantu/penurunan
3
dari 3 minggu), Cacat sementara alat fungsi
5 Fatality Meninggal
SEVERITY /Keparahan
US $ 100 – US $ 1000
US $ 1000 – US $ 5000
US $ 5000 – US $ 10000
> US $ 10000
Tabel Penggolongan Nilai Risiko
Lakukan perbaikan
1-7 Rendah (Low)
dalam waktu 7 hari
C Dapat diterima
Lakukan perbaikan
8 - 14 Sedang (Moderate)
dalam waktu 3 hari
B Dapat diterima, perlu dipantau
Lakukan perbaikan
Tidak dapat diterima, lakukan
15 - 24 Tinggi (High) dalam waktu 24 A
pengendalian
jam
Stop, lakukan
Tidak dapat diterima, perlu tindakan
≥ 25 Ekstrim (Extreme) perbaikan pada AA
pengendalian dari manajemen
saat itu
Matriks Penilaian Risiko
PxS 1 2 3 4 5
1 1 2 3 4 5
2 2 4 6 8 10
3 3 6 9 12 15
4 4 8 12 16 20
5 5 10 15 20 25
SAMPLE OF ENVIRONMENTAL ASPECT AND IMP
LIST OF HAZARDS
Chemical Hazards
Inhalation (vapors/gases/mists)
Ingestion (eating/drinking)
Absorption through skin
Absorption through eyes
Injection
Chemical incompatibility
Physical Hazards
Radiation (ionizing or non-ionizing)
Noise
Temperature extreme
Unstab
Striking against objects
Electrical
Fire
Material part of material
Improper condition of equipment (Car, scaffolding, crane etc)
Bad environment (weather etc)
Vibration
Temperature
Harmful energy (Pressure, Kinetic, Potential, Electric)
Physical characteristics (sharpness, slipperiness, roughness)
Moving parts of machinery
Ergonomic Hazards
Improper lifting
Poor visual conditions
Improperly designed tools
Poorly designed work areas
Repeated motions
Improperly designed job task
Improper worker/task match
Lack communication e.g. communication between crane operator
and helper.
Overexertion (lifting/reaching)
Human fatigue
Biological Hazards
Germs (Airborne, Bloodborne, Contact, Fecal-oral, Foodborne,
Animal-borne, Insect-borne etc)
Wild animals e.g. snake
Human Hazards
Lack of awareness
Careless, over confidence
Lack of skill/knowledge
Horseplay
NMENTAL ASPECT AND IMPACT, HAZARDS
LIST OF ASPECT LIST OF IMPACT
Use of energy e.g. electrical Land contamination
Use of material e.g. paper, diesel fuel Air contamination
Waste Water Water contamination
Fugitive Dust Lost of biodiversity
Gas emission Depletion of natural resources
Chemical spillage
Chemical leakage
Sedimentation
Erosion
Biodiversity
Domestic waste
Oil contaminated material
Chemical container
Used oil
Used oil filter
Scrap
IDENTIFIKASI ASPEK, BAHAYA POTENSIAL DAN PENILAIAN RISIKO
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Aktifitas
1 2 3 4 5 6 7 8 9 10 11 12 13
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Permen ESDM No 26 tahun
Menaruh gear box pada 2018 & Kepmen ESDM No 1827
36 S Material jatuh A alat/material rusak bidang rata, Penatan 2 3 6 Rendah Administrasi Tahun 2018, UU No 1. Tahun
Material 1970 Tentang Keselamatan
Kerja pasal 3,
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
- Briefing sebelum bekerja,
TIA-PR-HSE-35 Prosedur Permen ESDM No 26 tahun
- Cidera tubuh/ fatality
Fatigue Manajemen, 2018 & Kepmen ESDM No 1827
- Ketidak harmonisan
- Golden Rules, aturan no. Tahun 2018, UU No 1. Tahun
hubungan antar karyawan
51 H Kerja Emosional A
- Tidak tercapainya solusi
11 Management Fatigue, 2 5 10 Sedang Praktek Kerja 1970 Tentang Keselamatan
- Membina komukasi & Kerja pasal 3, , dan Permen No.
dalam setiap masalah
Keakraban yang lebih baik PER.08/MEN/VII/2010 tentang
pekerjaan
- Saling mengerti pekerjaan APD pasal 2, 3, 4,
masing2 karyawan
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
Prosedur Pengelolaan
Limbah B3 (TIA-PR-HSE- PP No. 101 Tahun 2014
05), Penempatan lem/ Tentang Pengelolaan Limbah
60 E A Kontaminasi ke tanah larutan kimia dengan alas 2 2 4 Rendah B3,Permen ESDM No 26 tahun
agar tidak kontak langsung 2018 & Kepmen ESDM No 1827
ke tanah. Golden rule Tahun 2018
peraturan 12
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
- Briefing sebelum bekerja,
TIA-PR-HSE-35 Prosedur Permen ESDM No 26 tahun
- Cidera tubuh/ fatality
Fatigue Manajemen, 2018 & Kepmen ESDM No 1827
- Ketidak harmonisan
- Golden Rules, aturan no. Tahun 2018, UU No 1. Tahun
hubungan antar karyawan
67 H Kerja Emosional A
- Tidak tercapainya solusi
11 Management Fatigue, 2 5 10 Sedang Praktek Kerja 1970 Tentang Keselamatan
- Membina komukasi & Kerja pasal 3, , dan Permen No.
dalam setiap masalah
Keakraban yang lebih baik PER.08/MEN/VII/2010 tentang
pekerjaan
- Saling mengerti pekerjaan APD pasal 2, 3, 4,
masing2 karyawan
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Mengganti belt
NR
conveyor
- Briefing sebelum bekerja, Permen ESDM No 26 tahun
- TIA-PR-HSE-35 Prosedur 2018 & Kepmen ESDM No 1827
Fatigue Manajemen, Tahun 2018, UU No 1. Tahun
82 H Beban kerja A Cidera tubuh/ fatality - Golden Rules, aturan no. 2 5 10 Sedang Praktek Kerja 1970 Tentang Keselamatan
11 Management Fatigue. Kerja pasal 3, , dan Permen No.
- Pemilihan pekerjaan yang PER.08/MEN/VII/2010 tentang
prioritas APD pasal 2, 3, 4,
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
1 2 3 4 5 6 7 8 9 10 11 12 13
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Operator yang kompeten, IK
Pengoperasian Genset (TIA- Permen ESDM No 26 tahun
IK-MTC-05, Pemasangan 2018 & Kepmen ESDM No 1827
144 R S Tersengat listrik E Cidera serius (LTI) Karet dilantai depan panel, 2 4 8 Sedang Rendah Rekayasa Tahun 2018, UU No 1. Tahun
Golden Rules Aturan 5 1970 Tentang Keselamatan
Keselamatan Pekerjaan Kerja pasal 3
Listrik
Maintenance dan
pengukuran bising genset
Permen ESDM No 26 tahun
rutin, K service genset 250
2018 & Kepmen ESDM No 1827
jam (TIA-IK-MTC-04),IK
Tahun 2018, UU No 1. PerGub
service genset 500 jam (TIA-
145 R H Bising N Gangguan pendengaran
IK-MTC-04),IK service
2 2 4 Rendah Rendah Praktek Kerja, APD Kalsel No. 53 Tahun 2007
Tentang Baku Mutu Udara
genset 1000 jam (TIA-IK-
Ambien dan Baku Tingkat
MTC-04), Prosedur APD
Kebisingan
(TIA-PR-HSE-08) Ear plug /
muff
Area : Port
Mengawasi proses
Departemen pekerjaan : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Semprotan cat
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Permen ESDM No 26 tahun
2018 & Kepmen ESDM No 1827
Semprotan cat Tahun 2018, UU No 1. Tahun
Prosedur APD (TIA-PR-HSE-
162 H N Iritasi kulit
08) rubber gloves
2 1 2 Rendah Rendah Praktek Kerja, APD 1970 Tentang Keselamatan
Kerja pasal 3, dan Permen No.
PER.08/MEN/VII/2010 tentang
APD pasal 2, 3, 4
Prosedur Pengelolaan
UU No 32 tahun 2009 Tentang
Limbah B3 (TIA-PR-HSE-05)
perlindungan dan pengelolaan
( Golden Rules, Aturan 12,
166 E Material B3 tumpah E Pencemaran lingkungan
Pengelolaan Lingkungan dan
2 2 4 Rendah Rendah Praktek Kerja lingkungan Hidup, PP No 74
Tahun 2001 Pengelolaan Bahan
Pengendalian Pencemaran
Berbahaya dan beracun
Lingkungan )
Penggantian Kontaktor
NR
Motor Crusher
No. Form : TIA-FM-HSE-51_01 Page 41 of 47
IDENTIFIKASI ASPEK, BAHAYA POTENSIAL DAN PENILAIAN RISIKO
Area : Port
Departemen : Maintenance Upgrading BLC
Tanggal : November 2023
1 2 3 4 5 6 7 8 9 10 11 12 13
Permen ESDM No 26 tahun
2018 & Kepmen ESDM No 1827
As build drawing. Golden
171 S A kerusakan part
ruel aturan 5
2 3 6 Rendah Rekayasa Tahun 2018, UU No 1. Tahun
Penggantian Kontaktor 1970 Tentang Keselamatan
NR Kerja pasal 3
Motor Crusher
Permen ESDM No 26 tahun
2018 & Kepmen ESDM No 1827
Tahun 2018, UU No 1. Tahun
Prosedur APD (TIA-PR-HSE-
172 H Debu A gangguan pernapasan
08) masker/respirator
2 3 6 Rendah Praktek Kerja, APD 1970 Tentang Keselamatan
Kerja pasal 3, dan Permen No.
PER.08/MEN/VII/2010 tentang
APD pasal 2, 3, 4,
1 2 3 4 5 6 7 8 9 10 11 12
Disusun Oleh,
No Nama Jabatan Paraf Diperiksa Oleh, Disetujui oleh,
No Nama
1 Yainul Manaf
2 I Kadek
3 Faisal Reza
4 Yunus Fathoni
5 C. Adi Tamtomo
6 M. Hardjo
7 Herman