You are on page 1of 2

Unit: mm

ITC-FL05 Outdoor Cabinet Quick Installation Guide Anchor bolt × 4


This guide introduces how to install the cabinet on the concrete plinth. Outdoor cabinet
Version: MN080037CEA_01 240 650±2

150
Concrete plinth
CAUTION*
Unit: mm

800

615±2
500
150

≥400 ≥300
The distance between the cabinet and the nearby Ground
Hollow
living area must be more than 10m, and the back of
the cabinet faces the dwelling place.
Wear the protective gloves while carrying the cabinet to
Direction of Front Door
avoid scratches on the cabinet and your hands. 150 Embedded PVC tube
1250
Do not directly drag the cabinet to avoid damaging the 1250
painting of the cabinet bottom.
H = 1700

Front View of Concrete Plinth Top View of Concrete Plinth


The safety of the worker should always come first, if any
accident happens in the course of the installation.
* The Caution itemthis document do not cover all the TIPS
safety precautions that must be observed. They provide Please build the concrete plinth according to the above figures and embed four anchor bolts
only the generic safety precautions for operations. M12×220, whose exposed part is 30mm high.
FiberHome is not liable for any consequence that results
Please check the flatness of the concrete plinth with the level ruler after it is finished; if
from violation of universal regulations for safety
* uneven, please repair it.
operations and safety codes on design, production and
equipment use

* The lifting lugs are included in the accessories. Please take out
and install the lifting lugs before the cabinet installation.
3 Removing the cover plate of the cabinet base

3.1 Remove the front cover plate


1 Preparing tools
2 Locating the cabinet

NOTE NOTE
1
Prepare the following tools for the installation. Select an installation site for the cabinet
according to the installation dimension and the
space of the cabinet. 2
3

Hoisting equipment Philips screwdriver Mounting holes


安装孔

Wrenches Tape measure 1 Open the front door.


2000

2 Unscrew the three screws on the front cover plate.

3 Lift up the front cover plate and remove it. Then the mounting holes are revealed.
Level ruler Protective gloves
Unit: mm
单位:mm
2000
3.2 Remove the back cover plate

Hex Nut M12 6


1 Unscrew the six screws on the back cover
plate. Spring Washer
Flat Wahser
2 Remove the back plate and the mounting
holes are revealed.

1 5

5 Open the front door.

2 6 Secure the cabinet with the nuts, spring washers and flat washers from the accessories.
7 Replace the front and back cover plate.

4
8 Finish the cabinet installation and move on to the next procedure according to your demands.
Installing the cabinet

TIPS 5 Checking the installation

Before hoisting the cabinet, put 2


some protective materials (e.g. 1 The cabinet is installed securely.
sponge pad) between the cabinet 2 All the screws and nuts are tightened; the flat washers and spring washers are installed completely
and the lifting rope to protect the and properly.
cabinet from scratching.
3 The cabinet is neat and clear.
4 The paint on the surface of the cabinet is intact; if it is damaged, please repaint it in time.
1 Route the lifting rope through 5 The components and connection inside the cabinet are intact; any problem, please contact
the lifting lugs at the bottom of FiberHome immediately.
the cabinet.

2 Use the hoisting equipment to


lift the cabinet up.
1
3 Adjust the position of the
cabinet to align the mounting 3
holes with the anchor bolts in
the concrete plinth.
FiberHome Telecommunication Technologies Co., Ltd.
4 Place the cabinet carefully on Address: No. 6, Gaoxin 4th Road, Wuhan, Hubei, China
the concrete plinth. Tel: 800-800-0787 400-889-0787 +86-27-87691549 Zip code: 430074
Website: http://www.fiberhome.com
获取更多相关手册,请联系烽火客服人员。
For more related manuals, please contact FiberHome Technical Support.

You might also like