Professional Documents
Culture Documents
150
Concrete plinth
CAUTION*
Unit: mm
800
615±2
500
150
≥400 ≥300
The distance between the cabinet and the nearby Ground
Hollow
living area must be more than 10m, and the back of
the cabinet faces the dwelling place.
Wear the protective gloves while carrying the cabinet to
Direction of Front Door
avoid scratches on the cabinet and your hands. 150 Embedded PVC tube
1250
Do not directly drag the cabinet to avoid damaging the 1250
painting of the cabinet bottom.
H = 1700
* The lifting lugs are included in the accessories. Please take out
and install the lifting lugs before the cabinet installation.
3 Removing the cover plate of the cabinet base
NOTE NOTE
1
Prepare the following tools for the installation. Select an installation site for the cabinet
according to the installation dimension and the
space of the cabinet. 2
3
3 Lift up the front cover plate and remove it. Then the mounting holes are revealed.
Level ruler Protective gloves
Unit: mm
单位:mm
2000
3.2 Remove the back cover plate
1 5
2 6 Secure the cabinet with the nuts, spring washers and flat washers from the accessories.
7 Replace the front and back cover plate.
4
8 Finish the cabinet installation and move on to the next procedure according to your demands.
Installing the cabinet