1 ISSUED FOR CONSTRUCTION AK IUR MSK 21-Dec-20 CAUSE AND EFFECT DIAGRAM
4 P&ID-INSTRUMENT BUFFER VESSEL 15-501-EP-PID-004 1D RE-ISSUED FOR APPROVAL AK IUR MSK 9-Nov-20
3 P&ID-RLNG PIPELINE DELIVERY STATION 15-501-EP-PID-003 1C RE-ISSUED FOR APPROVAL AK IUR MSK 6-Nov-20 15-501
REV.
2 P&ID-RLNG PIPELINE METERING SKID 15-501-EP-PID-002 1B ISSUED FOR APPROVAL AK IUR MSK 22-Oct-20 DRAWING
15-501-EP-CE-001 1
NUMBER:
1 P&ID-RLNG PIPELINE TIE-IN 15-501-EP-PID-001 1A ISSUED FOR REVIEW AK IUR MSK 15-Oct-20
PREP'D CHECKED APPROVED SCALE DATE SHEET
SR.NO. DESCRIPTION DRAWING NO. REV.
NO. DESCRIPTION PREP'D CHKD. APPVD. DATE
REFERENCE DRAWINGS AK IUR MSK NTS 21-Dec-20 1 OF 2
15-501-EP-CE-001 Rev.1 (Cause & Effect Diagram)2 OF 2
NOTES:
P & ID
HOLDS:
ESDV-002
ESDV-005
ESDV-003
ESDV-004
TAG NO.
BDV-001
DELIVERY STATION
SUPPLY STATION
AREA
S.NO. TAG NO. IDENTIFICATION AND SERVICE P & ID FUNCTION SET POINT NOTE / HOLD Note-1 & 2 Note-3
GDT / R
1 - 50 % LEL 2oo2 Level-2
001 / 002
GAS DETECTION (SUPPLY STATION) C C C
GDT / R
2 - 50 % LEL 2oo2 Level-2
003 / 004
3 FDI-001 -
5 FDI-003 -
7 PSHH-001A Pressure High High in RLNG Piping at Supply Station 15-501-EP-PID-002 PAHH-001A 92 barg
8 PSHH-001B Pressure High High in RLNG Piping at Supply Station 15-501-EP-PID-002 PAHH-001B 92 barg 2oo3 Voting C
9 PSHH-001C Pressure High High in RLNG Piping at Supply Station 15-501-EP-PID-002 PAHH-001C 92 barg
10 PSLL-001A Pressure Low Low in RLNG Piping at Supply Station 15-501-EP-PID-002 PALL-001A 20 barg
11 PSLL-001B Pressure Low Low in RLNG Piping at Supply Station 15-501-EP-PID-002 PALL-001B 20 barg 2oo3 Voting C
12 PSLL-001C Pressure Low Low in RLNG Piping at Supply Station 15-501-EP-PID-002 PALL-001C 20 barg
13 PSHH-003 Pressure High High in Instrument Gas Buffer Vessel (V-15-01) 15-501-EP-PID-004 PAHH-003 9 barg C
GDT / R
14 - 50 % LEL 2oo2 Level-2
101 / 102
GAS DETECTION (DELIVERY STATION) C
GDT / R
15 - 50 % LEL 2oo2 Level-2
103 / 104
16 FDI-101 -
18 FDI-103 -
19 PSHH-002A Pressure High High in RLNG Piping at Delivery Station 15-501-EP-PID-003 PAHH-002A 90 barg
20 PSHH-002B Pressure High High in RLNG Piping at Delivery Station 15-501-EP-PID-003 PAHH-002B 90 barg 2oo3 Voting C
21 PSHH-002C Pressure High High in RLNG Piping at Delivery Station 15-501-EP-PID-003 PAHH-002C 90 barg
22 PSLL-002A Pressure Low Low in RLNG Piping at Delivery Station 15-501-EP-PID-003 PALL-002A 20 barg
23 PSLL-002B Pressure Low Low in RLNG Piping at Delivery Station 15-501-EP-PID-003 PALL-002B 20 barg 2oo3 Voting C
24 PSLL-002C Pressure Low Low in RLNG Piping at Delivery Station 15-501-EP-PID-003 PALL-002C 20 barg